ENVIRONMENTAL ASSESSMENT FOR REPAIR OF OVERHEAD 70kV TRANSMISSION LINE South Loop 2 VSFB, CA
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract solicitation seeks a small business to prepare a comprehensive Environmental Assessment (EA) for the repair of an overhead 70kV transmission line at Vandenberg Space Force Base in California, under the solicitation number FA461026_EA_SL2, with a strict response deadline of June 30, 2026. The work is a Total Small Business Set-Aside under NAICS Code 541620 and requires the contractor to execute all aspects of the EA in accordance with the Department of the Air Force’s Standard Environmental Impact Analysis Process (EIAP) Documentation Format and Supplemental Information (2024), as well as the DOD and DAF NEPA implementing procedures. The contractor must conduct detailed technical analyses across multiple environmental domains including cultural resources, biological and natural resources, wetlands, special status species, construction noise, air quality, water resources, hazardous materials, land use, socioeconomic factors, and safety and occupational health, while ensuring compliance with federal, state, and local environmental laws including the National Environmental Policy Act, the Fiscal Responsibility Act of 2023, and the BUILDER Act of 2023. The final EA must not exceed 75 pages in its main body, exclude company branding or logos, and include a certification statement affirming compliance with page limits. All deliverables must be professionally prepared with no typographical or grammatical errors and adhere to Air Force Handbook 33-337, The Tongue and Quill. The period of performance is twelve months from the date of award, with key milestones including a kick-off meeting within three business days of award, initial project schedule submission within sixty days, and monthly status reports due no later than twenty days after the end of each cost accounting period, starting no later than thirty days after award. All deliverables—including the Description of Proposed Action and Alternatives, technical reports on noise and baseline conditions, an executive summary limited to fifteen pages, and a final CD submission—are to be provided electronically to the Contracting Officer’s Representative, NEPA Planner, and Proponent POC. Site visits require five working days’ advance coordination with installation authorities, and media interactions are strictly prohibited without prior written approval from the DAF Public Affairs Officer, the Contracting Officer, and the COR. The contractor must also implement a rigorous compliance regimen for aquatic resource delineations, air quality standards, and classified information procedures if applicable, while maintaining administrative rigor through monthly reporting of project status and billing estimates
General Info
Agency
NAICS
Place of Performance
CA, 93437, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Based on the Statement of Work, the contractor will provide the services necessary to prepare a comprehensive Environmental Assessment (EA) for the repair of an overhead 70kV transmission line at Vandenberg Space Force Base. This includes project management, data collection, and extensive coordination with government and regulatory stakeholders. The core of the work involves conducting detailed technical analyses of the project's impact on cultural resources, natural resources (including wetlands and special status species), and construction noise. The contractor will produce a series of documents, including a Description of Proposed Action and Alternatives (DOPAA) and various technical reports. Ultimately, this effort will result in a legally sufficient EA document that will lead to a Finding of No Significant Impact (FONSI), a mitigated FONSI, or a determination that a full Environmental Impact Statement (EIS) is necessary. Interested vendors shall submit a capability statement and other relevant information NLT 30 June 2026 at 1400 PDT.
More opportunities from Department Of Defense → FA4610 30 Cons Pk
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS