Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Environmental Assessment No. T-6507/T-6511/P25-01637

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Fresno

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

North Grantland Avenue and West Dakota Avenue, Fresno, CA, 93723

Set-Aside

NONE

Documents

(6)

DTSC Comments on NOP for Draft EIR Environmental Assessment 2025080816

PDFcomment-letter

Lead Agency Reviewing Agencies Checklist for NOC

PDFother

Notice of Preparation Comment for Environmental Assessment 2025080816

PDFcomment

NAHC Comment Letter on Environmental Assessment 2025080816

PDFcomment-letter

Notice of Preparation of Draft Environmental Impact Report for Environmental Assessment No. T-6507/T-6511/P25-01637

PDFnotice-of-preparation

2025080816_DOC Comment

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Fresno
Office AddressN/A
Contacts
Robert HoltSupervising Planner
Luke RisnerSenior Associate Planner
Brenda CosioLand Entitlement Analyst

Interested Companies (1)

Show more
Precision Civil Engineering
Fresno, CA

Full Description

Show more
Granville Homes (Applicant) proposes phased development (Parc West 2 & 3) of approximately 234.58-acres (net) of property located on the southwest corner of West Ashlan Avenue and North Grantland Avenue. Tentative Tract Map No. 6511 (Parc West 2) proposes to subdivide the northern 145.32-acres (net) into 678 single-family lots. Parks, open space, and landscape buffers are planned for approximately 17.17 acres throughout Parc West 2. Tentative Tract Map No. 6507 (Parc West 3) proposes to subdivide the southern 89.26-acres (net) into 525 single-family lots. Parks, open space, landscape buffers, and other public uses are planned for approximately 7.81-acres throughout Parc West 3. A General Plan Amendment would designate the internal roadway, North Parc West Drive, as a Collector in the Circulation Element of the City’s General Plan and to designate the planned trails and open space as planned trails in Figure MT-2 of the City’s General Plan. The designation of North Parc West Drive is a continuation of the designation of North Parc West Drive as a Collector in the existing Parc West development north of West Ashlan Avenue. The General Plan Amendment would also designate approximately 3.07-acres (net) located on the southwest corner of West Ashlan and North Grantland Avenue as Residential, Medium High Density. A Rezone would designate approximately 3.07 acres of property located on the northeast corner of TTM 6511 and the southwest corner of North Grantland and West Ashlan Avenues as the RM-1 (Residential, Medium High Density) zone district. The total number of lots for the entire project area is 1,203 lots on approximately 234.58-acres (net) bringing the total density of the project to approximately 5.19 dwelling units per acre. Site Circulation The Project will require the extension of West Dakota Avenue and North Garfield Avenue. All proposed interior streets will be required to be improved to City standards. Site access will occur from North Grantland Avenue, West Ashlan Avenue, North Garfield Avenue, West Dakota Avenue, and West Shields Avenue. The Project Applicant will be responsible for construction of the internal roadway system as well as for construction and/or fair contributions for the roadway improvements that will be required as a result of the Project. Infrastructure The Project will be required to tie into existing infrastructure in the area for sewer, water, and storm drain. The Project developer will be required to pay for all improvements related to obtaining these facilities to serve the Project. This includes constructing appropriately sized water mains that will provide adequate water pressure for fire flow and Project water use. The Project will require installation of sewer mains to serve the Project including any sewer easements that will be required by the City. The Project is proposed to be supported by the City of Fresno’s municipal water supply system and its wastewater collection system (including the Grantland trunk sewer) and wastewater/treatment disposal facilities. The major public utility service is Pacific Gas and Electric. Site and Surrounding Land Uses and Setting Project Setting The Project site has historically been used for agricultural purposes and is currently in agricultural use with no structures or on-site improvements. Topography of the Project site is generally flat, and existing biotic conditions and resources of the Project site is composed of trees (Almonds) grown for the existing agricultural use on the property. North Grantland Avenue, a north-south Super Arterial, forms the easterly boundary; West Ashlan Avenue, an east-west Collector, forms the northerly boundary; West Shields Avenue, an east-west Collector, forms the southerly boundary; and North Garfield Avenue, a north-south Collector, forms the westerly boundary. There are no existing street frontage improvements at the Project site.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in 26 days
View Details