Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Environmental Assessment No. T-6507/T-6511/P25-01637

Forecast
T-6507/T-6511/P25-01637State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Fresno

Place of Performance

North Grantland Avenue and West Dakota Avenue, Fresno, CA, 93723

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Interested Companies (1)

Precision Civil EngineeringFresno, California

Full Description

Show more
Granville Homes (Applicant) proposes phased development (Parc West 2 & 3) of approximately 234.58-acres (net) of property located on the southwest corner of West Ashlan Avenue and North Grantland Avenue. Tentative Tract Map No. 6511 (Parc West 2) proposes to subdivide the northern 145.32-acres (net) into 678 single-family lots. Parks, open space, and landscape buffers are planned for approximately 17.17 acres throughout Parc West 2. Tentative Tract Map No. 6507 (Parc West 3) proposes to subdivide the southern 89.26-acres (net) into 525 single-family lots. Parks, open space, landscape buffers, and other public uses are planned for approximately 7.81-acres throughout Parc West 3. A General Plan Amendment would designate the internal roadway, North Parc West Drive, as a Collector in the Circulation Element of the City’s General Plan and to designate the planned trails and open space as planned trails in Figure MT-2 of the City’s General Plan. The designation of North Parc West Drive is a continuation of the designation of North Parc West Drive as a Collector in the existing Parc West development north of West Ashlan Avenue. The General Plan Amendment would also designate approximately 3.07-acres (net) located on the southwest corner of West Ashlan and North Grantland Avenue as Residential, Medium High Density. A Rezone would designate approximately 3.07 acres of property located on the northeast corner of TTM 6511 and the southwest corner of North Grantland and West Ashlan Avenues as the RM-1 (Residential, Medium High Density) zone district. The total number of lots for the entire project area is 1,203 lots on approximately 234.58-acres (net) bringing the total density of the project to approximately 5.19 dwelling units per acre. Site Circulation The Project will require the extension of West Dakota Avenue and North Garfield Avenue. All proposed interior streets will be required to be improved to City standards. Site access will occur from North Grantland Avenue, West Ashlan Avenue, North Garfield Avenue, West Dakota Avenue, and West Shields Avenue. The Project Applicant will be responsible for construction of the internal roadway system as well as for construction and/or fair contributions for the roadway improvements that will be required as a result of the Project. Infrastructure The Project will be required to tie into existing infrastructure in the area for sewer, water, and storm drain. The Project developer will be required to pay for all improvements related to obtaining these facilities to serve the Project. This includes constructing appropriately sized water mains that will provide adequate water pressure for fire flow and Project water use. The Project will require installation of sewer mains to serve the Project including any sewer easements that will be required by the City. The Project is proposed to be supported by the City of Fresno’s municipal water supply system and its wastewater collection system (including the Grantland trunk sewer) and wastewater/treatment disposal facilities. The major public utility service is Pacific Gas and Electric. Site and Surrounding Land Uses and Setting Project Setting The Project site has historically been used for agricultural purposes and is currently in agricultural use with no structures or on-site improvements. Topography of the Project site is generally flat, and existing biotic conditions and resources of the Project site is composed of trees (Almonds) grown for the existing agricultural use on the property. North Grantland Avenue, a north-south Super Arterial, forms the easterly boundary; West Ashlan Avenue, an east-west Collector, forms the northerly boundary; West Shields Avenue, an east-west Collector, forms the southerly boundary; and North Garfield Avenue, a north-south Collector, forms the westerly boundary. There are no existing street frontage improvements at the Project site.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS