Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on September 5, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ENVIRONMENTAL RESTORATION A-E, NAVFAC NW

Closed
N44255-24-R-2001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 12 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Silverdale, WA, 98383, USA

Set-Aside

NONE

Documents

1

Sources Sought - 24-R-2001 Environmental Restoration A-E Services

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Northwest
Contacts2 people available
OfficeSILVERDALE, WA, 98315-1101, USA
Office AddressSILVERDALE, WA, 98315-1101, USA

Full Description

Show more
SOURCES SOUGHT NOTICE: ARCHITECTURAL-ENGINEERING SERVICES FOR ENVIRONMENTAL RESTORATION WITHIN THE NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC) NORTHWEST AREA OF RESPONSIBILITY NAVFAC Northwest is seeking certified Historically Underutilized Business Zone Small business (HUBZone) firms, certified 8(a) firms, certified Service Disabled Veteran Owned Small Business (SDVOB), certified Woman-Owned small business and Small Business firms with current relevant experience, personnel, and capability to perform the Architect-Engineering (A-E) services required for a firm fixed price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for Environmental Restoration Projects at various facilities within the NAVFAC Northwest Area of Responsibility (AOR): including Alaska, Idaho, Iowa, Minnesota, Montana, Nebraska, North Dakota, Oregon, South Dakota, Washington, and Wyoming. It is anticipated that the majority of the work will occur in the state of Washington. The potential contract term includes a one (1) year base period and four (4) one-year (option) periods. The Government intends to award one IDIQ A-E Contract with a maximum potential contract value anticipated Not-To-Exceed (NTE) $50 million for the life of the contract. Required A-E services are primarily for Environmental Restoration Services. Contract requirements will focus primarily on environmental restoration; however, projects may involve other environmental work such as compliance, planning, and studies or restoration of natural resources in support of the environmental restoration program or to support Navy activities. This contract will have capability to perform the following technical services in support of the Navy's environmental restoration program. It is the government's intent to have the majority of the work performed under this contract executed by appropriately registered and licensed engineers A-E services may include: Providing project management to effectively and efficiently propose, negotiate, and award Task Orders (TO). Develop remedial designs, remedial action work plans, site safety and health plans (SSHP's), SOW's, specifications, construction cost estimates, reports, and technical design reviews to ensure decision document criteria are met. Conduct and/or prepare Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) documents to include, but not be limited to: preliminary assessments, site inspections, remedial investigations and feasibility studies (RI/FS), Records of Decision (ROD's), environmental baseline surveys (EBS's), engineering evaluation\cost analysis (EE\CA), action memoranda, explanations of significant differences (ESD's), ecological and/or human health risk assessments (E/HHRAs), QA inspections, monitoring, testing, and sampling reports, modeling studies and reports, Resource Conservation and Recovery Act (RCRA) assessments, RCRA corrective measures studies, RCRA closure plans, 5-year reviews, response complete (RC) reports and remedial action closure reports (RACR). Construct modeling of various contaminants, monitor natural attenuation, and evaluate geochemical indicators in distinct media. Media may include, but not be limited to: air, groundwater, surface water, wastewater, sludge, marine environments, marine sediment, soil, soil vapor, aquatic/benthic or terrestrial organisms, bioassays, or various tank wastes. Prepare Quality Assurance Project Plans (UFP-QAPP) per reference c) for projects involving sampling and analysis. Conduct sampling and analysis for contaminants and provide interpretation of the results. Contaminants may include but not be limited to: metals, volatile organic compounds (VOC's), semi-volatile organic compounds (SVOC's), ordnance compounds, PCB's/pesticides, total petroleum hydrocarbons (TPH's), and per- & polyfluoroalkyl substances (PFAS). Concurrent task order awards from approximately $1K studies to $10M task orders in support of large, very complex environmental restoration designs and engineering services with less than one year to perform services in preparation of A-E packages may be anticipated. The North American Industry Classification System (NAICS) Code is 541330 - Engineering Services - with a Small Business Size Standard of $25.5 million. All certified HUBZone, certified 8(a), certified SDVOSB small business, certified woman-owned small business, and small business firms are encouraged to respond. If considering a joint venture (JV), please describe the relationship. Responses from Large Businesses are not requested. Upon review of industry response to this Sources Sought Synopsis, the Government will determine whether a set-aside acquisition in lieu of full and open competition is in the Government's best interest. THIS SOURCES SOUGHT ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. It is a market research tool being used to determine the availability and adequacy of potential sources prior to determining the acquisition strategy. The Government is not obligated to and will not pay for any information received from potential sources as a result of this announcement. It is requested that interested sources submit to the contracting office a brief capabilities statement package (no more than 8 pages in length, single-spaced, 12 point font minimum) demonstrating ability to perform the requested services identified in this synopsis. This documentation shall address the following: Company Information: On a maximum of one page, provide the company profile to include number of employees, primary point of contact, CAGE Code, Unique Entity ID, and statement regarding small business designation and status. Resumes: On a maximum of three pages, provide 3 resumes for key personnel that would be responsible for completing the required services. These key personnel must be appropriately registered and licensed engineers. Please include license numbers and state identification on resume, if applicable. Relevant Experience: On a maximum of two pages, list no more than five (5) specific, completed, recent (within past three years) projects that demonstrate experience in the required environmental restoration services. List each project by a brief paragraph listing the project title, location, cost, completion date and how each project reflects experience in the required services. Additional Information: On a maximum of one page, provide two brief paragraphs, one addressing - Location and one addressing - Capacity. Location is to state location of the firm's main office and branch offices, and describe the team's knowledge and availability to work in the proposed geographical area. - Capacity is to state the number of employees within the firm responsible for providing the proposed A-E services. The A-E must demonstrate adequate in-house staffing capable of self-performing at least 50 percent of the cost of the contract as required by FAR Clause 52.219.14 Limitation on Subcontracting. This package shall be sent by e-mail to the following addresses: PRIMARY: charles.l.mcavoy.civ@us.navy.mil Secondary: kimberly.a.gillette4.civ@us.navy.mil and clearly labeled with the firm name and sources sought title: N44255-24-R-2001, ENVIRONMENTAL RESRTORATION A-E, NAVFAC NW Submissions must be received at the office cited no later than 1:00 PM Pacific Daylight Time on Tuesday, 18 September 2024. Questions or comments regarding this notice may be addressed to Charlie McAvoy and Kimberly Gillette at the email addresses mentioned above.

More opportunities from Department Of Defense → Navfacsyscom Northwest

Same awarding agency

NAICS: 237990
Federal
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Solicitation # N4425526R0005
The Naval Facilities Engineering Systems Command (NAVFAC) is soliciting proposals for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) to support the Shipyard Infrastructure Optimization Program (SIOP) Multi-Mission Dry Dock (MMDD). The project primarily involves heavy and civil engineering waterfront facilities, as well as commercial and institutional construction, located at the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF) at Naval Base Kitsap in Bremerton, Washington. The contract has a maximum aggregate estimated value of 15 billion dollars over a potential 10-year period, consisting of a five-year base period and one five-year option. Major task orders are expected to range from 2 billion to 6 billion dollars, though smaller task orders for Early Contractor Involvement and Alternative Technical Concepts may be issued. Each MACC holder is guaranteed a minimum of 1 million dollars. The solicitation is unrestricted and open to full competition, though large businesses must provide an acceptable small business subcontracting plan. Evaluation factors include experience, price, and small business utilization and participation. A key initial component is a seed project task order for Alternative Technical Concepts (ATC) Package 1 Marine, which focuses on innovative strategies to improve cost, schedule, and constructability. This specific effort includes the delivery of an ATC report and a facilitated panel discussion led by the contractor's key personnel. Offerors must be registered in the System for Award Management (SAM) and provide comprehensive documentation, including bonding capacity via a surety form, financial questionnaires, and historical small business utilization data. All work is subject to Davis-Bacon Act wage determinations for Kitsap County, Washington.
Other Heavy and Civil Engineering Construction

POSTED

21 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS