This Solicitation opportunity from Georgia was posted on September 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
EPWSA Eastside Dewatering Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Eatonton Putnam Water & Sewer Authority (EPWSA) is soliciting proposals from qualified manufacturers to provide sludge dewatering equipment recommendations and a basis of design for the Eastside Water Pollution Control Plant in Eatonton, Georgia. The primary objective is to select a belt press and associated sludge handling configuration that can accommodate current flows of 0.26 MGD and scale up to a future permitted average daily flow of 1.0 MGD. Technical requirements specify that the equipment must achieve a minimum cake solids content of 20 percent and a solids capture rate of 95 percent or greater. Proposals will be evaluated by EPWSA staff and ESG Engineering based on four weighted criteria: qualifications and experience (40 percent), quality of technical solutions and recommendations (30 percent), service and warranty (15 percent), and budgetary pricing. It is important to note that selection under this RFP does not constitute a purchase order or supply contract; instead, the chosen manufacturer's specifications will be incorporated into the project's construction documents, and actual procurement will be executed through a separate construction contract. Sealed proposals, including one original, two copies, and one electronic copy, must be submitted by October 22, 2026.
General Info
Place of Performance
GA, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Power Breezer / Debris Blower SupplyOpen now, due in 7 days
- Vehicular Body Cover ProductionOpen now, due in 10 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
