Erickson Ave Waterline Replacement (2nd St to 5th St)

Closed
27-009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key scope elements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is designated as a small business set-aside. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Performance is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. The project timeline begins upon a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to meet substantial completion dates. Payments are processed monthly via applications for payment submitted to the Engineer, with a 30-day payment term following presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 15 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additionally, the project encompasses the rehabilitation of reactor mixers and aerators, motor control center component replacement, modifications to sluice and slide gates, and various electrical and instrumentation improvements. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and FRP reinforcing systems. Any exceptions to the standard Garney Purchase Order and Subcontract documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Erickson Avenue Waterline Replacement project, solicitation 27-009, involves replacing a 1940s-era 8-inch cast iron water main with approximately 1,060 linear feet of new ductile iron pipe, consisting of 1,020 feet of 12-inch pipe and 40 feet of 8-inch pipe. Located in a residential area between 2nd and 5th Streets adjacent to Beaverton High School, the scope includes two system connections, one fire hydrant assembly, two water services, and associated valves and fittings. The project also requires landscape restoration of disturbed unpaved areas and a comprehensive digital photo and video survey prior to ground disturbance. The estimated project cost is between $300,000 and $400,000, with a target substantial completion date in February 2027. The contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically by October 21, 2026, and must include a 10 percent bid guaranty and a tentative construction schedule to be considered responsive. The selected contractor must provide a Faithful Performance Bond, a Labor and Material Payment Bond, and a $30,000 public works bond. Work must comply with the 2024 Oregon Standard Specifications for Construction, the Beaverton Purchasing Code, and prevailing wage rates under both BOLI and the Davis-Bacon Act. Due to the proximity to Beaverton High School, the contractor is required to coordinate closely with the school site contractor to maintain access throughout construction.

General Info

Replace 1,060 feet of waterline on Erickson Avenue by February 2027 for $300k-$400k.

Documents

10

City of Beaverton - CIP 4373 Erickson Ave Waterline Replacement Construction Plans

PDF, High priority: read this firstspecifications
High

Construction Contract - City of Beaverton Sample

DOCX, High priority: read this first12 pages · contract-document
High

Erickson Ave Waterline Replacement - Sheet C107 Addendum 1

PDF, High priority: read this firstspecifications
High

ITB #27-009: Erickson Ave Waterline Replacement (2nd St to 5th St)

PDF, High priority: read this firstitb
High

ITB #27-009: Erickson Ave Waterline Replacement (2nd St to 5th St)

PDF, High priority: read this firstitb
High

Notice to Proceed for City of Beaverton Contract

DOCX, High priority: read this first2 pages · notice-to-proceed
High

Faithful Performance Bond - City of Beaverton

DOCX, Low priority1 page · performance-bond
Low

Labor and Material Payment Bond for City of Beaverton Project

DOCX, Low priority2 pages · bond
Low

Laws to be Observed - Environmental and Regulatory Agencies

DOCX, Low priority1 page · other
Low

Locates Utility Notification and Safety Instructions

DOCX, Low priority1 page · special-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Public Works - Engineering
Contacts2 people available
OfficeBeaverton, OR, 97005-1678, USA
Office AddressBeaverton, OR, 97005-1678, USA
Contacts
Matt PalmerProject Engineer
Marybeth SumnerProcurement & Equity Coordinator

Interested Companies (47)

Pacific ExcavationEugene, OR
RevCon
Colton HomesOregon City, OR

See All 47 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Erickson Avenue Waterline Replacement (2nd Street to 5th Street) will replace an existing 1940s-era 8-inch cast iron water main with approximately 1,060 linear feet of new ductile iron water main, consisting of 1,020 feet of 12-inch pipe and 40 feet of 8-inch pipe. The work includes two connections to the existing system (one each at the north and south project limits), one fire hydrant assembly, two water services, and associated valves, fittings, and appurtenances. Work will occur within the roadway in a residential area adjacent to Beaverton High School. The high school is currently undergoing renovations, and the Contractor should anticipate coordination with the school site contractor to maintain access to the school and adjacent areas throughout construction.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS