Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Erosion and Sediment Control Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Erosion and Sediment Control Installation involves the deployment and maintenance of stormwater management measures for prime contractors on residential projects within the City of Morro Bay. The scope of work specifically focuses on projects under one half acre, requiring the installation of fiber rolls and silt fencing according to a standard erosion and sediment control plan to prevent runoff into the city right-of-way. All activities must strictly adhere to the City of Morro Bay Stormwater Management EZ-manual, specifically MBMC 14.48.140. The contractor is responsible for delivering a fully installed and maintained erosion control system in Morro Bay, California, under NAICS code 238910.

General Info

Subcontract for erosion and sediment control installation on residential projects in Morro Bay.

Agency

California → City of Morro Bay

Place of Performance

Morro Bay, CA, 93442

Set-Aside

NONE

Documents

This scope was carved out of CDP26-009.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CDP26-009

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom CDP26-009
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Morro Bay
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Morro Bay
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs stormwater management measures for prime contractors on City of Morro Bay residential projects. Deploys fiber rolls and silt fencing per a standard erosion and sediment control plan for projects under 1/2 acre to prevent runoff into the City right-of-way. Must follow City of Morro Bay Stormwater Management EZ-manual (MBMC 14.48.140). Delivers installed and maintained erosion control system.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
RRUMC 4th Floor Patient Care Reconfiguration – BP 11 – Demolition, Concrete, Framing And Drywall
Solicitation # 907518.01
The Ronald Reagan UCLA Medical Center 4th Floor Patient Care Reconfiguration project, specifically Bid Package 11, focuses on the conversion of Behavioral Health spaces into Medical/Surgical spaces to expand inpatient bed capacity by up to 103 beds. The scope involves renovating approximately 67,400 square feet of the 115,600 square foot fourth floor, with work extending to the third and fifth floors, outdoor decks, and along Charles Young Drive. Key deliverables include complete selective demolition, concrete repair, metal stud framing, and the installation of level 4 drywall. Additionally, the contractor must provide design-build services for modifications to the existing pneumatic tube system and ensure all alterations meet ADA compliance, sustainability, safety, and security standards. The contract is a lump sum base bid awarded to the lowest responsive bidder, with the final sum calculated based on the base bid, unit prices, compensable delay rates, and any included alternates. Performance is subject to strict quality standards, including CBC/CFC and NFPA regulations, with final acceptance requiring a Letter of Completion from the University Representative after successful testing and submission of as-built diagrams. Bidders must be licensed California contractors and provide a UCIP Form 1-B regarding safety qualifications. The project requires adherence to prevailing wage laws, the provision of performance and payment bonds, and participation in a University Controlled Insurance Program. Bids are due by 2:00 p.m. on December 3, 2026.
The Regents of the University of California

POSTED

about 17 hours ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS