Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion and Sediment Control Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
SLED
Truck Loading Biofilter Media Replacement at Plant No. 2 (FR2-0034)
Solicitation # S-2026-736BD
The Orange County Sanitation District (OC San) is soliciting bids under solicitation S-2026-736BD for a general services contract to replace fouled biofilter media within the Truck Loading Biofilter System at Plant No. 2. The project requires the contractor to provide all labor, equipment, and materials to procure Biorem-manufactured media, remove and dispose of 5,624 cubic feet of old media and mesh, clean the air distribution system, and coordinate installation and operator training. To maintain continuous odor control, no more than one biofilter cell may be removed from service at a time. The work must be completed within 84 calendar days from the Notice to Proceed, with all deliverables accepted by the OC San Project Manager. Eligible bidders must hold a California Contractor's License classification A and comply with California Department of Industrial Relations prevailing wage requirements and CARB mobile source regulations. Mandatory requirements include attendance at a pre-bid meeting on September 24, 2026, and submission of bids via the OpenGov portal by October 20, 2026. Bidders must provide proof of comprehensive insurance, including general liability of 2 million dollars per occurrence and 4 million dollars aggregate. Award will be granted to the lowest responsible and responsive bidder. All hazardous materials and waste must be labeled and stored with secondary containment in accordance with safety standards.
Procurement

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the installation and ongoing maintenance of erosion and sediment control measures to ensure compliance with the Stormwater Pollution Prevention Plan and Texas Department of Transportation environmental standards EC(1)-16, EC(2)-16, and EC(3)-16. This work is critical to preventing pollutants from entering waterways during construction activities and must be executed in strict accordance with state environmental regulations. The project is located in Goliad, Texas, and falls under NAICS code 562910 for other support activities for waste management, indicating the specialized nature of the environmental protection services required. This subcontract is set to be awarded on June 1, 2026, with the same date serving as both the posting and response deadline, suggesting a streamlined procurement process. All work must be performed in accordance with TxDOT’s environmental protocols, and the contractor is responsible for maintaining controls throughout the project lifecycle. Documentation, inspections, and adherence to operational best practices will be essential to ensure regulatory compliance and avoid penalties. The plans and specifications for this work are available through the Texas DOT’s public FTP site for reference and preparation.

General Info

Installation and maintenance of erosion controls in Goliad, Texas, per TxDOT environmental standards effective June 1, 2026.

Agency

Texas Department of Transportation

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Goliad, TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 0916-26-024.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Goliad County — CSJ 0916-26-024 — June 2026 Letting — State-Let Construction

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation and maintenance of erosion and sediment control measures in compliance with the Stormwater Pollution Prevention Plan (SWP3) and TxDOT environmental standards EC(1)-16, EC(2)-16, EC(3)-16.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS