Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Virginia was posted on July 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion and Sediment Control – Silt Fence and Erosion Control Blanket

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 16 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This subcontract opportunity, issued by the Virginia Department of Energy, involves the installation of temporary erosion controls to protect disturbed areas. The scope of work specifically requires the placement of silt fencing and erosion control blankets to manage sediment and prevent soil erosion. The solicitation was posted on July 24, 2025, with a response deadline of August 5, 2025. Classified under NAICS code 541620, this project is managed by the state of Virginia and is open for qualified subcontractors to submit their proposals via the designated vendor portal.

General Info

Virginia Department of Energy subcontract for temporary erosion control installation by August 5, 2025.

Place of Performance

VA, USA

Set-Aside

NONE

Documents

This scope was carved out of AML Project No. 51122.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Maxie Circle Drainage

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Environmental Consulting & PermittingOpen now, due in 21 days
  • Environmental Compliance and Project ControlsOpen now, due in 31 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia Department of Energy
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia Department of Energy
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of temporary erosion controls including silt fencing and erosion control blankets across disturbed areas.

More opportunities from Virginia Department of Energy

Same awarding agency

NAICS: 237130
New
SLED
Solar Interconnection Grant
Solicitation # RFA-131767
The Solar Interconnection Grant Program, administered by the Virginia Department of Energy, provides funding to public bodies to offset the costs of connecting distributed solar energy systems to the electric grid. Established via Senate Bill 659 and House Bill 683, the program targets barriers to public-sector solar development by funding infrastructure upgrades, including transformers, relays, SCADA/telemetry, protection equipment, metering modifications, and necessary engineering services. Eligible projects may be behind-the-meter or front-of-the-meter and must be located at previously developed project sites. The anticipated period of performance ranges from 6 to 18 months. Applications must be submitted through the Virginia Energy Grant Portal by January 15, 2027. Awards are competitive and based on a 100-point scoring system that evaluates organizational summaries, project scope, readiness, interconnection details, and community benefits. Applicants must adhere to strict word counts and submit a master PDF and two Excel files. Grant recipients must comply with Virginia procurement laws and prevailing wage requirements mirroring federal Davis-Bacon standards. Administration requires monthly invoicing by the 15th of each month, quarterly progress reports, and final verification via equipment lists and photos. Payments are issued upon agency acceptance of work, with a potential 5% retainage for construction projects and a final audit before closing.
Power and Communication Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS