Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Oregon was posted on January 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion Control and Energy Dissipation Rock Bed

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

2 days ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This subcontract opportunity with the Oregon Department of Transportation involves the construction of an energy-dissipating rock bed at a pipe outlet. The primary objective of the project is to prevent erosion within a vegetated ditch by utilizing existing rocks to manage water flow and dissipate energy. The solicitation was posted on January 3, 2025, and requires responses to be submitted by the deadline of January 23, 2025. The project is categorized under NAICS code 237990, which covers all other miscellaneous contractor specialty construction activities.

General Info

Documents

This scope was carved out of S-73000-00012417.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFCQ - ESB OR6 MP30.5 Inlet Install Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construct energy-dissipating rock bed at pipe outlet using existing rocks to prevent erosion in vegetated ditch.

More opportunities from Oregon Department of Transportation

Same awarding agency

NAICS: 237310
SLED
OR18 Yamhill River Bridge Rail Repairs
Solicitation # S-73000-00015363
The Oregon Department of Transportation is soliciting bids for the repair of a damaged concrete bridge rail section on OR18 over the Yamhill River near Dayton. The project encompasses all labor, materials, and equipment necessary for the work, including mobilization, temporary work zone traffic control, pollution control, bridge removal, and specific concrete repairs. Technical requirements are governed by the 2024 Standard Specifications and detailed Special Provisions, which outline strict protocols for traffic management, environmental protection, and structural integrity. Detailed plans specify a precise sequence for the removal, preparation, and placement of concrete rail posts and repair mortar, with final acceptance contingent upon engineer approval of saturated surface dry conditions and production quality control testing. The contract will be awarded to a single responsive and responsible bidder offering the lowest total bid price. Bidders must submit all required certifications via the OregonBuys system, including attestations regarding non-discrimination, tax law compliance, and the implementation of a qualifying employee drug testing program. Performance is subject to liquidated damages of 300 dollars per calendar day for failure to meet the substantial completion date or for exceeding allowed lane closure limits. The project is located in Yamhill County, BOLI Region 3, and requires compliance with prevailing wage rates and specific insurance endorsements naming the State of Oregon and ODOT as additional insured.
Highway, Street, and Bridge Construction

POSTED

12 months ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS