Erosion Control and Stormwater Management
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract under the title Erosion Control and Stormwater Management requires the installation of silt fences, sediment basins, and other best management practices to ensure compliance with environmental regulations during construction activities. These measures are essential for controlling soil erosion, managing stormwater runoff, and preventing sediment from entering nearby waterways, thereby protecting local ecosystems and meeting state and federal environmental standards. The work is positioned as a subcontract and falls under the NAICS code 541620, indicating environmental consulting and related services focused on environmental compliance and mitigation. The solicitation was posted on August 7, 2026, with a response deadline of September 3, 2026, and is managed by the Texas Department of Transportation through its Texas office. The place of performance and specific location details are not specified, suggesting the project may involve multiple sites across the state. Interested parties are directed to the Texas SmartBuy portal for further information and submission requirements, with no set-aside preferences indicated, meaning the contract is open to all eligible contractors regardless of business size or ownership characteristics.
General Info
Agency
NAICS
Place of Performance
TX, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
