Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on January 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion Control Mat Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The California Department of Transportation is seeking a subcontractor for the installation of erosion control mats. The project requires the coverage of over 1,000 square yards to effectively prevent soil runoff during and after construction activities. This work falls under NAICS code 561730. The opportunity was posted on January 30, 2025, with a response deadline set for February 13, 2025. Interested parties can find further details and submission guidelines through the Cal eProcure portal.

General Info

Caltrans seeks a subcontractor for 1,000+ square yards of erosion control mat installation.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 04A7161.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SB Minor B 04A7161 - Repair and Replace a Culvert in Alameda County

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • City of Westminster – Wakefield Valley ParkOpen now, due in 1 day
  • Highway Right-of-Way Mowing ServicesOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of erosion control mats over 1,000 square yards to prevent soil runoff during and after construction.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project issued by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29, from Coyote Creek Bridge to Diener Drive/Road 543, and Route 53 at Route 29. Key activities include cold planing of AC pavement, installation of Rubberized Hot Mix Asphalt Gap Graded overlay, and Hot Mix Asphalt Type A surfacing. The project also involves bridge work at Coyote Creek Bridge, drainage improvements, utility plans, and the installation of sinusoidal rumble strips and traffic stripe tape. The estimated cost for the project is 14.4 million dollars. Bids must be submitted via the Bid Express website by January 6, 2027, and must include bidder security of at least 10 percent of the bid. Proposed project durations must fall between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and includes strict requirements for Buy America/Build America compliance and environmental product declarations for concrete and asphalt. Contractors must adhere to rigorous environmental standards, including specific pressure washing protocols for equipment to prevent the spread of invasive species and compliance with the RWQCB basin plan. Performance must begin within 55 days of contract approval by the Attorney General, with a notice of start required 72 hours prior to activity. The project mandates the use of prevailing wages and requires a certified safety representative with specific Cal/OSHA or OSHA training and professional certifications. Quality control personnel must hold ACI Concrete Field-Testing Technician Grade 1 certification. Temporary concrete barriers must be fabricated at authorized facilities and meet MASH Test Level 3 safety standards.
Highway, Street, and Bridge Construction

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS