Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Georgia was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion Control/Retaining Wall System

Closed
PE-55302-NONST-2027-000000016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238140
New
SLED
CM1530-33 Apron Reconstruction, Phase 1, Kahului airport
Solicitation # CM1530-33
State Project No. CM1530-33 is a solicitation issued by the Hawaii Department of Transportation for Apron Reconstruction, Phase 1 at Kahului Airport on Maui. The project focuses on the repair of deteriorated exterior concrete and concrete masonry unit surfaces at Holdroom F and Walkway EFF, including adjacent areas. With an estimated construction cost between 2 million and 3 million dollars, the contract is a lump sum price agreement that includes specific allowances for unforeseen conditions. Bidders must hold a General Engineering A license and submit their proposals via the Hawaii eProcurement System (HlePRO) by November 17, 2026. Award will be granted to the lowest responsible bidder who provides a complete proposal and a valid surety bid bond. The contractor is required to maintain continuous operations for the main terminal and airport roadways throughout the project. Key performance requirements include the implementation of a written Quality Control Program within 30 days of award and strict adherence to ACI, ASTM, and TMS standards for concrete and masonry rehabilitation. Special conditions include a mandate that Hawaii residents comprise at least 80 percent of the workforce for the project and any subcontracts valued at 50,000 dollars or more. Additionally, personnel operating in the Air Operations Area must meet specific state licensing, security clearance, and insurance requirements. All work must be completed within the specified calendar days following the Notice to Proceed, with a baseline construction progress schedule submitted within 30 days of the administrative notice.
Department of Transportation

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Charles R. Drew Charter School is seeking proposals under RFP FY27-002 for the design and installation of an erosion control and retaining wall system at the EA/Yates Campus in Atlanta, Georgia. The project aims to prevent hill erosion where Campus Drive meets Eva Davis Way SE and requires the contractor to provide all labor, machinery, licensing, insurance, permitting, and materials. Key deliverables include a modular block retaining wall approximately 100 linear feet long and 30 inches high, a permanent hardscape seat wall, a drainage system featuring a rock aggregate dry creek bed with sub-surface piping, and specific landscaping including mature Holly bushes and pine straw. Additionally, the contractor must audit, repair, and modify the existing campus irrigation system and ensure the final design incorporates solutions drafted by second-grade students. Proposals must be submitted via the Bidnet Direct Platform by September 11, 2026, at 5:00 PM ET. The contract will be awarded on an all-or-nothing basis to the offeror representing the best value based on a combination of technical qualifications, price, and service capabilities. Evaluation involves a two-part process consisting of a technical review of written responses followed by potential interviews for high-scoring vendors. Required submission documents include a cover letter, a detailed project schedule, a cost proposal, three business references, and various certifications including non-collusion and independent price determination statements. Selected vendors must maintain a high standard of site safety, including mandatory daily debris removal, and guarantee their pricing for 120 days following submission. Payment terms are Net 30.

General Info

Proposals for retaining wall installation at Charles R. Drew Charter School by September 11.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

RFP FY27-002 Erosion Control/Retaining Wall System

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Charles R. Drew Charter School
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Drew Charter School is requesting proposals from qualified vendors to design and install a retaining wall system to prevent hill erosion along the main drive at Charles R. Drew Charter School EA/Yates Campus, in accordance with the terms, conditions, and specifications contained in this Request for Proposals (RFP) # FY27-002.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS