Erosion Repair and Bank Stabilization Services

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Erosion Repair and Bank Stabilization Services involves performing critical slope restoration and stabilization work for prime contractors on California Department of Water Resources projects. Based in Patterson, the scope of work includes removing loose soil from outer slopes, backfilling and compacting fill material, and installing rip rap to ensure long-term stability. The project requires the use of heavy machinery, including excavators, backhoes, sheep's foot rollers, and water trucks, to deliver a fully stabilized erosion area. All operations must be conducted in strict accordance with DWR earthwork standards and adhere to the CEQA Class 1 Exemption. The contract is categorized under NAICS code 238910 and was posted on January 28, 2026.

General Info

Subcontract for erosion repair and bank stabilization services on California DWR projects.

Agency

California Water Resources, Department of

Place of Performance

Patterson, CA

Set-Aside

NONE

Documents

This scope was carved out of OM-DFD-2026-002.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CAAQ MM 45.21 Erosion Repair (OM-DFD-2026-002)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom CAAQ MM 45.21 Erosion Repair (OM-DFD-2026-002)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs erosion repair and bank stabilization for prime contractors on California Department of Water Resources (DWR) projects. Removes loose, eroding soil from the outer slope, backfills and compacts fill material, and installs rip rap for long-term stabilization. Utilizes excavators, backhoes, sheep's foot rollers, and water trucks. Adheres to CEQA Class 1 Exemption and DWR earthwork standards. Delivers a stabilized erosion area.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Substandard Structures
Solicitation # 271010
The City of Dothan, Alabama, is soliciting bids for the demolition of substandard structures at seven specific locations: 303 N Edgewood Dr., 415 N Alice St., 604 Torino Dr. (shed), 706 W Adams St., 1104 Sonata St., 1211 Greenwood Dr., and 3439 Denton Rd. (shed). The project requires the contractor to leave each site clean, clear, and level, free of obstructions and foundations, with soil stabilized against erosion and re-seeded or mulched. All work must be completed within sixty consecutive calendar days from the Notice to Proceed, with liquidated damages of fifty dollars per day assessed for delays exceeding this timeframe. The contract will be awarded on a group basis, with evaluation based on price, qualification, experience, and past performance. This is a lump sum contract with no progressive payments; payment will be issued no sooner than forty-five days after the invoice is approved by the Planning Department Head upon satisfactory completion of the work. Bidders must provide a performance bond in the amount of the bid upon award and maintain insurance naming the City as an additional insured. Compliance with OSHA, EPA, and ADEM regulations is mandatory, and vendors must use the E-Verify system for all new hires. Bids must be submitted in ink or typewritten on the required forms by December 8, 2026, and must include a signed Alabama Immigration Compliance Form and a non-discrimination certification.
City of Dothan

POSTED

about 8 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS