Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion, Sediment & Environmental Control

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract for the City of San Mateo focuses on erosion, sediment, and environmental control for City Polymer Injection System projects. The selected contractor is responsible for implementing comprehensive site runoff and pollution control measures, including the installation of check dams, sediment ponds, siltation fences, catch basin inlet socks, erosion control blankets, and sediment traps to protect unprotected slopes. The project requires the delivery of a fully compliant erosion control system throughout the entire duration of construction. This opportunity is categorized under NAICS code 238910, with a response deadline of October 8, 2026, for work to be performed in San Mateo, California.

General Info

San Mateo subcontract for erosion and pollution control on Polymer Injection System projects.

Place of Performance

San Mateo, CA, 94404, USA

Set-Aside

NONE

Documents

This scope was carved out of 46t191.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Polymer Injection System Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Mateo
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Implements site runoff and pollution control measures for prime contractors on City Polymer Injection System projects. Installs check dams, sediment ponds, siltation fences, and catch basin inlet socks to prevent erosion of unprotected slopes. Utilizes erosion control blankets and sediment traps. Delivers a compliant erosion control system throughout the construction duration.

More opportunities from California → City of San Mateo

Same awarding agency

NAICS: 238210
New
SLED
Senior Center Transfer Switch Project
Solicitation # 46F050
The Senior Center Transfer Switch Project, solicitation number 46F050, is a construction contract issued by the City of San Mateo for work at the San Mateo Senior Center located at 2645 Alameda de las Pulgas, San Mateo, California. The project requires a contractor with a Class B license to provide all labor, materials, and equipment for the installation of a gasoline-powered generator and a transfer switch. The scope of work includes electrical conduit installation via trenchless directional bore, electrical box installation, tree replacement, and general site work. Key deliverables include an electronic project manual, as-built drawings with control wiring diagrams, and monthly reports detailing equipment delivery and completion dates. Bids must be submitted by 2:00 p.m. PDT on December 3, 2026, to the City Clerk at City Hall. Submissions must include a bid bond or certified check for at least 10% of the bid amount, a non-collusion affidavit, and a list of subcontractors and equipment manufacturers. The project is subject to California Prevailing Wage Law and requires registration with the Department of Industrial Relations. Payment is managed through a schedule of values and monthly applications for payment submitted to the Engineer, with a requirement for affidavits and proof of lien-free materials starting from the second payment. The contractor is also responsible for adhering to ADA standards for product labeling and following specific hazardous waste manifests for lead paint disposal.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 24 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS