Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

ESDC National Cabling, Dismantling, Installation, Staging and Repair Services (CDISSR) - Request for Supply Arrangement (RFSA)

Open
100024501/BInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Employment and Social Development Canada is establishing a Supply Arrangement to prequalify vendors across Canada for the installation, dismantling, moving, packaging, and repair of office furniture, equipment, and cabling. Starting April 1, 2024, this tool will support Service Canada Centres, Passport Canada offices, and general ESDC office spaces. The arrangement is divided into 25 geographic zones across all provinces and territories and is structured into four distinct work streams: furniture assembly and moving, furniture dismantling and packaging, office equipment cabling and installation, and repair services. The procurement process allows new suppliers to qualify through a continuously posted notice on the Government Electronic Tendering Service, while existing qualified suppliers are not required to resubmit. The scope of work includes detailed requirements for cable management, equipment testing, ecological waste disposal, and the protection of facility assets during transit. This specific amendment updates the RFSA name to include repair services and modifies the mandatory technical criteria to incorporate the fourth work stream.

General Info

ESDC nationwide supply arrangement for furniture, cabling, installation, dismantling, and repair services across Canada, open until 2033.

Documents

1
PDF, High priority: read this firstamendment
High

Read the document

Due in 2592 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Due in 2592 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Employment and Social Development Canada
Contacts1 person available
OfficeN/A

Full Description

Show more
This amendment is raised to make changes to MTC 1 of the Evaluation Criteria and make changes to the RFSA name from ESDC National Cabling, Dismantling, Installation and Staging Services (CDISS) - Request for Supply Arrangement (RFSA) to ESDC National Cabling, Dismantling, Installation, Staging and Repair Services (CDISRS) - Request for Supply Arrangement (RFSA). ********************************************************************************* Employment and Social Development Canada (ESDC) is seeking to create a Supply Arrangement (SA) purchasing tool for prequalifying vendors, contractors and professionals across Canada for services including installation, dismantling, moving and packaging of office furniture, equipment, and cabling of workstations and collaborative areas. Once established, this SA will be used by ESDC’s real property teams across all provinces, territories and regions of Canada to procure services for our Service Canada Centres, Passport Canada offices and back end ESDC general office spaces. These services are being sought through a Supply Arrangement which will start April 1, 2024, and expire when ESDC determines that it is no longer advantageous. A Request for Supply Arrangements (RFSA) will be issued in accordance with the process set out below to allow new Suppliers to become qualified. Existing qualified Suppliers, who have been issued a supply arrangement, will not be required to submit a new arrangement. The initial notice (100024501/A) was posted on November 20, 2023 in order to begin the qualification process for bidders who have submitted arrangements for the initial notice. This notice (100024501/B) will be left continuously posted on the Government Electronic Tendering Service (GETS) to allow new Suppliers to become qualified. Qualified vendors will be added to the Supply Arrangement, as they have been deemed to qualify. This Supply Arrangement will have a total of four work streams, which bidders may indicate their interest/capability in: 4.1 Stream one: Furniture assembly and moving Services The SA Holder must carry out services including: 1. Removing assembled furniture items or disassembled furniture item parts from packaging and/or pallets; 2. Assembling furniture items according to manufacturer instructions and/or guidelines; 3. Moving furniture items by hand, or using tools, either assembled or in parts to designated areas; 4. Placing furniture items according to provided floor plans and Client Authority directions; 5. Leaving with all packaging waste produced and disposing of it in an ecologically respectful manner; 6. Leaving job sites in a “clean and ready to be used” state; 7. Prepare a report of all damaged, broken or non-functional furniture items. 8. The SA Holder must not unpackage, assemble or move items that were not identified in the Work Order, unless advised otherwise by the Project Authority. 9. Where elevators are to be used for moving items or equipment, the elevator cab must be lined and properly protected. 10. Doors and door openings must be protected from potential damage, when applicable. When necessary, the Contractor must remove doors from the frames and reinstall without damage at the end of the services. 4.2 Stream two: Furniture dismantling and packaging services The SA Holder must carry out services including: 1. Dismantling and disassembling furniture items, without damaging them, according to manufacturer instructions and guidelines; 2. Sort and place furniture items and parts by types and sizes when dismantling entire floor areas; 3. Supply crates, skids, wrap shrink, labels, etc. for packaging. 4. Labelling and packaging and or crating assembled furniture items for transport on skids for transport; 5. Labelling and packaging and or crating furniture item parts on skids for transport; 6. Transport furniture items and furniture parts to storage areas according to provided floor plans and Client Authority directions; 7. Leaving with all excess packaging waste produced and disposing of it in an ecologically respectful manner; 8. Leaving job site in a clean state. 9. Prepare a report of any damaged, broken or non-functional furniture items. 10. The SA Holder must not dismantle, package, move or store items that were not identified in the Work Order, unless advised otherwise by the Project Authority. 11. Where elevators are to be used for moving items or equipment, the elevator cab must be lined and properly protected. 12. Doors and door openings must be protected from potential damage, when applicable. When necessary, the Contractor must remove doors from the frames and reinstall without damage at the end of the services. 4.3 Stream three: Office equipment cabling, connecting, disconnecting and installing services The SA Holder must carry out services including: 1. Preparing workstations and removing cabling for workstations 1. Pull and run existing power and data cables for connectivity as needed for specified site work. 2. Cable management and coiling to ceiling as required at sites for specified work. 3. Disconnect, wrap and/or remove existing data cables as needed for specified site work. 4. Label cables to identify associated equipment. 2. Unpacking office equipment and removing all packaging in preparation for installation 3. Assembling and installing office equipment on workstations including: 1. monitor arms; 2. cable trays; 3. work surface mounted power/USB modules; 4. Mounting and unmounting monitors on monitor arms; 5. Connecting and disconnecting workstation equipment including: 1. laptop docking stations to monitors; 2. monitors and laptop docking stations to power bar; 3. work surface mounted power socket and USB hub to power bar; 4. power bars to panel or wall mounted power outlet; 5. when disconnecting, removal and wrapping or bundling of all cables; 6. when disconnecting, identifying all cables to the equipment they were connected to; 7. Remove, wrap and bundle unused cables; 8. Power bars and power modules must not be ‘dasiy chained’ or connected to each other in sequence. 6. Organizing cables and wiring to ensure workstations have an adequate cable management setup by: 1. Passing monitor cables trough monitor mount dedicated wire channels and grommet holes when possible; 2. Passing docking station cables either through grommet holes or over the work surface edge; 3. Passing work surface power outlet cables either through grommet holes or over the work surface edge; 4. Placing power bars and all extra cable length in the cable tray; bundling and securing them in place with cable managers, such as Velcro straps, or when no cable trays are provided, attach all extra cable length with cable managers to work station and ensure no cabling obstructs access to workstation or drops into leg space under work station, 1. for height adjustable workstations, cables must have enough free length to accommodate the minimum and maximum height adjustments; 7. Testing basic functionality of office equipment; 1. Checking and adjusting movement range and support capacity of monitor arms; 2. Turning on monitor screens to verify that they receive power; 3. Verifying that power sockets and USB sockets of work surface mounted power outlet are receiving and transmitting power; 4. Verify that laptop docking station indicator light is on and that connecting a device to the USB-C dongle transmits images to the screens and powers the device; 5. Prepare a report of any damaged, broken or non-functional equipment; 6. Leaving job sites in clean state, and in the case of installation, site must be ready for use by Client; 7. Leaving with all excess packaging waste produced and disposing of it in an ecologically respectful manner. 8. The SA Holder must not install, mount, connect or test items that were not identified in the Work Order, unless advised otherwise by the Project Authority. 4.4 Stream four: Repair Services The SA Holder must carry out services including but not limited to: 1. Identify any required repairs during moves and/or installations a. Assess associated costs b. Provide detailed report 2. Vendor may be provided a list of already identified repairs a. Vendor to provide a detailed quote 3. Vendor may be required to assess scope of potential repairs to furniture or office equipment. a. Repairs include the following but not limited to items listed in Definitions - 3.1 i. Furniture - 3.1.1 ii. Office equipment – 3.1.2 b. Vendor to provide a report including a detailed quote 4. All repairs will follow all possible safety precautions 5. All repair quotes will include a start date and an approximate completion timeframe a. Should work exceed original established parameters, vendor to provide additional quote prior to continuing. 6. Prepare a report detailing the completed repairs, including any outstanding work that couldn’t be completed (and reasons why). 7. Leaving job sites in a “clean and ready to be used” state; 8. Leaving with all packaging waste produced and disposing of it in an ecologically respectful manner; This SA will also be broken down into 25 zones across Canada, which vendors will be asked to indicate which zones that they are capable/willing to offer services in: Zone # Zone Name 1 Upper BC 2 Central BC 3 Lower BC 4 Upper AB 5 Lower AB 6 Upper SK 7 Lower SK 8 Upper MB 9 West MB 10 East MB 11 West ON 12 Upper ON 13 East ON 14 Central ON 15 Lower ON 16 Greater Quebec 17 Montreal 18 Quebec City 19 New Brunswick 20 Nova Scotia 21 P.E.I 22 Labrador 23 Island of Newfoundland 24 Yukon 25 NWT

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
Emergency/Exit Lighting – Mechanical/Electrical Rooms Project
Solicitation # emergencyexit-lighting-lighting-mechanicalelectrical-rooms-project
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to install code-compliant emergency and exit lighting at the Quentin N. Burdick Job Corps Center in Minot, North Dakota. The project focuses on correcting deficiencies identified in the 2026 Facility Survey, specifically within the mechanical and electrical rooms of Building 26 (Female Dormitory) and Building 27 (Single Parent Dormitory). The scope includes providing all labor, materials, and equipment to install LED emergency/exit light fixtures that adhere to NFPA 101 Life Safety Code and NFPA 70 National Electrical Code standards. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Bids must be submitted on the provided bid sheet by December 4, 2026, at 4:00pm CST. Required documentation for bid packages includes a current insurance certificate, a contractor's license, and a trade license as required by the state of North Dakota. Proposals exceeding $150,000 require a bond. The contractor must comply with Davis-Bacon Act prevailing wage requirements and coordinate any necessary electrical shutdowns with center personnel. Payment terms are Net 30 following service completion verification and receipt of invoice. Final acceptance is contingent upon the successful demonstration of equipment operation, including battery charging and emergency illumination, verified by the center's designated representative.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency (IEUA) is soliciting proposals for transformer oil testing services under solicitation RFP-VC-26-010 to improve the efficiency, safety, and consistency of its transformer maintenance. The project scope includes performing visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices to ensure safe collection, and conducting comprehensive oil testing analysis. Key deliverables include condition assessment reports, annotated IR images, the development of standard operating procedures for sampling, and on-site training for agency staff. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with IR inspections performed by ASNT Level 1 certified technicians. This is a prevailing wage contract subject to the California Labor Code, requiring contractors to be registered with the Department of Industrial Relations. The contract is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals must be submitted electronically via PlanetBids by December 23, 2026. Evaluation is based on the offeror's past performance, specifically requiring at least two similar projects within five years, one of which must be for a utility or industrial facility. The agency intends to make a single award to the most capable and cost-effective offeror, though it reserves the right to make multiple awards.
Inland Empire Utilities Agency

POSTED

about 5 hours ago

DEADLINE

in 29 days
View Details
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves engaging a qualified electrical contractor to inspect, test, repair, and certify emergency lighting systems to ensure full compliance with the National Life Safety Code (NFPA 101, 2024 Edition). Key deliverables include the inventory of all fixtures, functional testing via simulated utility outages, and the integration of recurring maintenance requirements into the operator's Computerized Maintenance Management System. The estimated contract value ranges from $25,000 to $100,000, and the award will be based on overall best value. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Bids are due by December 1, 2026, and must include a signed bid form and a detailed cost breakout on company letterhead. For bids of $25,000 or more, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds. The contractor must adhere to Davis-Bacon Act wage determinations, OSHA safety regulations, and provide a one-year guarantee of workmanship. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details
NAICS: 238210
New
Joliet Job Corps- Replacement of Water Damaged Transformer
Solicitation # joliet-job-corps-replacement-water-damaged-transformer
Management & Training Corporation is soliciting bids for a subcontracting opportunity to replace a water-damaged 30KVA transformer at the Joliet Job Corps center in Illinois. The scope of work includes the de-energizing, removal, and off-site disposal of the existing damaged transformer, and the installation of a new 30KVA transformer (480V primary, 120/208V secondary). The contractor must perform insulation resistance testing, continuity verification, and phase rotation confirmation, while adhering to National Electrical Code, OSHA, and local building codes. This is a fixed-price, single lump sum contract with an estimated value between $0 and $25,000. The opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Bids are due by November 25, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prior to bidding. Awards are based on overall best value, and the contractor must provide a one-year guarantee for workmanship. The project is subject to Construction Wage Rate Requirements, requiring compliance with prevailing wage rates and the submission of weekly certified payroll reports. Performance and payment bonds are required for bids equal to or greater than $25,000. Payment is handled via pay applications using AIA documents, with a ten percent retainage withheld until substantial completion and final acceptance.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in 2 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS