Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on June 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EVA QQ - Structural Steel Fabricated - Culpeper District VDOT

Closed
A501VDOT:70271State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
SLED
Corpyard Phase II - Connex Structural Anchoring & Welding: (REBID)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids for the Corpyard Phase II project to provide all labor, materials, equipment, and specialized tooling required to anchor 14 existing shipping containers to a cement-treated asphalt surface at 4300 West Capitol Avenue. The scope of work includes container pre-checks, drilling and cleaning holes, installing Bolthold asphalt anchors, bolting down plates, performing AWS welding for angle connections, and applying zinc-rich cold galvanizing spray for rust protection. All work must be performed according to PSE stamped drawings and structural calculations, with a total project duration of 90 working days from the Notice to Proceed. The estimated project value is 35,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid security of at least 10 percent of the total bid price, and the successful contractor must furnish performance and payment bonds for 100 percent of the contract price. Compliance with California prevailing wage requirements and registration with the California State Department of Industrial Relations is mandatory. Proposals must be submitted electronically via the OpenGov portal by November 17, 2026, at 1:00 PM. Payment terms include 95 percent payment of progress estimates within 30 days, with a 5 percent retention held until final acceptance by the Engineer.
Capital Projects - Construction

POSTED

1 day ago

DEADLINE

in 3 days
NAICS: 238120
New
SLED
Midlothian Mines Headstock Replacement
Solicitation # IFB27000129
Chesterfield County is soliciting bids for the Midlothian Mines Headstock Replacement, a project to construct a headstock replica at Midlothian Mines Park. The scope of work includes field verification of existing foundations, removing and welding new steel knife plates, fabricating and erecting a new heavy timber headstock with custom steel connection plates, and installing copper flashing. Additionally, the contractor must refurbish and reinstall existing winder wheels and apply specific wood-preservative treatments. All steel components must be hot-dipped galvanized according to ASTM standards, and timber must be kiln-dried Southern Pine with UC5C pressure preservative treatment. The contract will be awarded to the lowest responsive and responsible bidder based on a lump sum bid. Bids are due by December 17, 2026, and must be submitted via hard copy or the County's eProcurement system. A non-mandatory pre-bid conference is scheduled for November 19, 2026. Bidders must provide a bid bond equal to 5% of the total bid price, and if the bid exceeds $500,000, both performance and payment bonds of 100% of the contract price are required. Payment is typically made within 30 days of receiving an accurate invoice, with a 5% retainage applied to monthly estimates. The project is subject to various regulatory compliances, including federal, state, and local environmental and safety regulations, as well as Equal Employment Opportunity requirements.
Chesterfield County

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

Place of Performance

VA, USA

Set-Aside

Small Business Set-Aside

Documents

2
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 26, 2024 to Jun 27, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia Department of Transportation
Contacts1 person available
OfficeN/A

Full Description

Show more
Furnish, fabricate and deliver Structural Steel per attached Steel Material List to the Culpeper District Bridge Section, 1601 Orange Road, Culpeper, VA.

More opportunities from Virginia Department of Transportation

Same awarding agency

NAICS: 324121
New
SLED
804_2027 PLANT MIX - PRIMARY
Solicitation # IFB-131588
The Virginia Department of Transportation is soliciting bids for the 804_2027 Plant Mix - Primary contract (Solicitation IFB-131588), with a response deadline of December 16, 2026. The project is located in Highland County, Virginia, specifically on Route 250 within the Staunton District. The contract will be awarded to the lowest responsive and responsible bidder, with tie bids decided by lot. Prequalification is required for all applicants, and bids must be filed electronically through the Bidx portal. The scope of work involves the production of asphalt concrete conforming to specific mix types and VDOT Road and Bridge specifications. Key deliverables include the submission of a job mix formula for Engineer approval and the integration of hydrated lime at a minimum rate of 1% by weight of total dry aggregate. Quality control is stringent, requiring the contractor to perform gradation and asphalt binder content tests every 500 tons of production and report flat and elongated particles. Acceptance is based on nuclear density measurements and visual examinations conducted by the Engineer. Administrative requirements include strict adherence to the Davis-Bacon Act, the Build America, Buy America Act, and various non-discrimination laws including Title VI of the Civil Rights Act and the Americans with Disabilities Act. Contractors must provide one hour of paid sick leave for every 30 hours worked. Payment is processed via monthly progress estimates scheduled by the first letter of the contractor's company name. Performance and payment bonds are required, and contractors without a payment bond must provide certification from suppliers and subcontractors that all previous bills have been settled.
Asphalt Paving Mixture and Block Manufacturing

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS