This Solicitation opportunity from California was posted on August 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Evergreen/Winchester/Templeton Sewer Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Evergreen/Winchester/Templeton Sewer Replacement Project is a public works solicitation issued by the North San Mateo County Sanitation District, a subsidiary of the City of Daly City, California. The project involves the open-cut construction and replacement of approximately 2,200 lineal feet of existing 14-inch, 18-inch, or 21-inch sanitary sewer with new 15-inch, 18-inch, and 21-inch polyvinyl chloride (PVC) pipe. Work will be performed in the public right-of-way at several key intersections, including Templeton and Mission, Winchester and Templeton, Templeton and Peroa, Evergreen and Mission, Evergreen and Brunswick, and Evergreen and Hanover. The scope includes soil excavation, shoring, backfilling, soil compaction, the reconnection of existing sewer laterals and storm drain fly lines, and the replacement of manholes. The contract will be awarded to the lowest responsible bidder based on factors such as experience, capacity, safety records, and past performance. Bids are due by September 25, 2026, at 2:00 p.m. and must be submitted in sealed envelopes to the City Clerk's Office. Required submission documents include a bid bond of at least 10% of the aggregate bid, a noncollusion affidavit, a Community Workforce Agreement, and a lobbying certification. The project is subject to California Labor Code prevailing wage requirements and strict quality standards, including video inspections where the camera must capture 90% of the internal pipe surface at a speed not exceeding 30 feet per minute. Liquidated damages for incomplete work are set at 1,000 dollars per working day. Project administration is led by Jeff Bastian, Project Development Coordinator.
General Info
Place of Performance
Daly City, CA, 94015, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
