EVSE Project at CAL TRANS District 2-Maintenance Station
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project at the Caltrans District 3 Maintenance Station in Quincy, California, entails the installation of Electric Vehicle Supply Equipment infrastructure to prepare for future dual port, pedestal-mounted Electric Vehicle Charging Stations, though the actual chargers are not included in this scope. Six parking stalls will be designated for electric vehicle use through specialized stenciling and restriping, accompanied by clear signage to ensure proper identification and compliance. The infrastructure work includes burying conduits, installing fixed bollards and wheel stops, and adding new electrical equipment with all necessary wiring, all powered by an existing on-site electrical source. The installation will require pavement saw cutting, trenching, backfilling, and complete restoration of the surface to its original condition post-construction. All activities, including waste disposal, will comply fully with local, state, and federal regulations. The point of contact for the project is Peter Hendrix, P.E., ZEVI Deputy Division Chief, reachable via email and phone provided.
General Info
Agency
NAICS
Place of Performance
1555 East Main Street, Quincy, CA, 95971Set-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
