Excavation and Subsurface Verification Contractor

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This small business set-aside subcontract for the Department of Justice at the FCI Sheridan facility involves providing non-destructive utility locating and excavation services for prime contractors. The scope of work focuses on vacuum potholing for electric, communication, gas, water, and security lines, with excavation depths reaching up to 5 feet. The contractor is responsible for delivering verified utility maps and safe, open excavation pits. Strict adherence to OSHA 29 CFR Part 1926 Subpart P is required, along with the maintenance of a 10-foot clearance from all perimeter security fences. The project is categorized under NAICS code 238910 and is located in Sheridan, Oregon. Responses for this opportunity are due by October 29, 2026.

General Info

Utility locating and vacuum excavation services for DOJ facility in Sheridan, Oregon.

NAICS

238910 - Site Preparation Contractors

Place of Performance

Sheridan, OR, 97378, USA

Set-Aside

SBA

Documents

This scope was carved out of 15B61227Q00000001.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FCI Sheridan Water Loop Repair

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fci Sheridan
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs non-destructive utility locating and excavation for pipe access for prime contractors on FCI Sheridan facility projects. Executes vacuum potholing of electric, communication, gas, water, and security lines. Performs excavation to 5 feet depth. Must comply with OSHA 29 CFR Part 1926 Subpart P and maintain 10-foot clearance from perimeter security fences. Delivers safe, open excavation pits and verified utility maps.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
International
Neebing-McIntyre Floodway Clearing Project
Solicitation # LRCA-2026-01
The Neebing-McIntyre Floodway Clearing Project (LRCA-2026-01), issued by the Lakehead Region Conservation Authority, involves vegetation clearing and sediment excavation between the Redwood Ave Bridge and the Diversion Channel Outlet. The scope of work includes the excavation of approximately 6,133 cubic meters of floodway sediment, hauling and disposal of 5,782 cubic meters of material, and the removal of trees 150 mm and greater in diameter. Additional requirements include the installation of geotextile and rip-rap, site dewatering in accordance with OPSS.MUNI 517, traffic control following Ontario Traffic Manual Book 7, and the implementation of environmental controls. The contractor must submit a Dewatering and Water Management Plan for approval prior to starting work and ensure side slope transitions maintain a minimum slope of 2H:1V. Tenders must be submitted digitally via the Bids and Tenders portal by 2:00 PM EDT on October 27, 2026, as a single PDF. Mandatory submission documents include the Tender Form, Agreement to Bond, a 10% bid bond on CCDC Form 220, a Certificate of Insurance, and Supplementary Forms A through D covering subcontractors, alternatives, experience, and supervisory staff. Failure to complete these forms may result in tender rejection. Upon award, the successful contractor must provide a performance bond for 100% of the work value and a labor and materials payment bond for 50%. Payment is processed via progress certificates, contingent upon the submission of a WSIB certificate of clearance and a statutory declaration confirming all liabilities and liens have been discharged. Notably, the owner is not liable for interest on any amount payable to the contractor, and time is strictly of the essence for completion.
bids&tenders

POSTED

about 20 hours ago

DEADLINE

in 11 days
View Details

More opportunities from Department Of Justice → Fci Sheridan

Same awarding agency

NAICS: 237110
New
Federal
FCI Sheridan Water Loop Repair
Solicitation # 15B61227Q00000001
The Federal Bureau of Prisons at FCI Sheridan is seeking firm-fixed-price quotations for the repair of an underground pre-insulated hot-water distribution loop located in Sheridan, Oregon. This project is a total small business set-aside and requires a turnkey solution to restore operational integrity at two specific leak locations: Location A in the Armory vicinity, involving approximately 100 linear feet of piping buried five feet deep, and Location B behind Housing Unit 2, which requires isolation, component replacement, and alignment corrections. The scope of work includes excavation, structural pipe lining using trenchless multi-layer epoxy resin, mechanical repairs, hydrostatic testing, and surface restoration. All work must adhere to strict technical standards, including ASME B31.1, ASME Section IX, the International Mechanical Code, and OSHA 29 CFR Part 1926 Subpart P for excavations. Due to the nature of the facility, the contractor must manage significant operational and security constraints, including a maximum hot-water outage limit of 30 minutes per housing unit and the provision of a temporary boiler contingency. Evaluation will be based on a best-value determination, where the technical approach and relevant experience are weighted more heavily than price. Quotations must include a detailed technical narrative, evidence of comparable past performance, and a firm-fixed price. Additionally, the government will require a virtual oral presentation from the proposed project manager or technical lead to discuss the repair sequence, outage management, and performance risks. Quotations are due by October 29, 2026, at 8:30 a.m. Pacific Time.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS