Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Excavation, Trenching, and Backfilling

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Excavation, Trenching, and Backfilling supports prime contractors on City of Chicago Department of Water Management projects. The scope of work includes saw cutting pavement, excavating, disposing of spoils, and installing necessary excavation protection systems. To ensure proper compaction, the contractor is required to use Flowable Fill Backfill or Controlled Low Strength Material. All operations must strictly comply with OSHA 29 CFR Part 1926 safety standards regarding excavations. The contract focuses on the delivery of fully excavated trenches and professionally compacted backfill. Interested parties should note the response deadline of January 15, 2027, for this utility installation support project.

General Info

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of 78421.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

1338903: Term Agreement for Block Level Lead Service Line Replacement: Dist 3

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 60 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom 1338903: Term Agreement for Block Level Lead Service Line Replacement: Dist 3
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Department of Water Management
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs trenching and backfilling for utility installation for prime contractors on City of Chicago Department of Water Management projects. Saw cuts pavement, excavates and disposes of spoils, and installs excavation protection systems. Uses Flowable Fill Backfill / Controlled Low Strength Material (CLSM) for compaction. Requires compliance with OSHA 29 CFR Part 1926 (Excavations). Delivers excavated trenches and compacted backfill.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
RRUMC 4th Floor Patient Care Reconfiguration – BP 11 – Demolition, Concrete, Framing And Drywall
Solicitation # 907518.01
The Ronald Reagan UCLA Medical Center 4th Floor Patient Care Reconfiguration project, specifically Bid Package 11, focuses on the conversion of Behavioral Health spaces into Medical/Surgical spaces to expand inpatient bed capacity by up to 103 beds. The scope involves renovating approximately 67,400 square feet of the 115,600 square foot fourth floor, with work extending to the third and fifth floors, outdoor decks, and along Charles Young Drive. Key deliverables include complete selective demolition, concrete repair, metal stud framing, and the installation of level 4 drywall. Additionally, the contractor must provide design-build services for modifications to the existing pneumatic tube system and ensure all alterations meet ADA compliance, sustainability, safety, and security standards. The contract is a lump sum base bid awarded to the lowest responsive bidder, with the final sum calculated based on the base bid, unit prices, compensable delay rates, and any included alternates. Performance is subject to strict quality standards, including CBC/CFC and NFPA regulations, with final acceptance requiring a Letter of Completion from the University Representative after successful testing and submission of as-built diagrams. Bidders must be licensed California contractors and provide a UCIP Form 1-B regarding safety qualifications. The project requires adherence to prevailing wage laws, the provision of performance and payment bonds, and participation in a University Controlled Insurance Program. Bids are due by 2:00 p.m. on December 3, 2026.
The Regents of the University of California

POSTED

about 16 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Illinois → Department of Water Management

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS