Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nevada was posted on October 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Exhaust Fan Replacement & Direct Digital Control System Upgrade, Nevada Youth Training Center (21-M02-28 & 23-M02-10)

Closed
9369625State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
41--FAN,VANEAXIAL
Solicitation # SPE8E9-27-T-0554
This contract is a Request for Quotations (RFQ) issued by DLA Troop Support, Construction & Equipment MRO SVC I for the procurement of nine vane axial fans, identified by NSN 4140-00-289-8885 and part number M18953-AA02WA4W6NANANA. The hardware must meet specific technical requirements, including a 440V AC three-phase power supply, a nominal air flow rate of 2000 cubic feet per minute, and clockwise rotation with outward flow. The item is designated as a critical application item and must comply with basic specification MIL-PRF-18953C(1) and quality assurance provision QAP 13873 QAP-EQ003. Additionally, the manufacturer must be Qualified Products List (QPL) approved at the time of award. Delivery is required within 318 days after order, with an original required delivery date of November 16, 2026, shipped FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality inspection will occur at the destination using sampling methods per MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Environmental restrictions prohibit the intentional use of mercury or Class I ozone-depleting chemicals. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, sustainable products, and small business representations.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

1 day ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract involves replacing exhaust fans and upgrading temperature controls at the Nevada Youth Training Center, in accordance with specified plans and technical requirements. The project has a completion timeline of 32 calendar days, with liquidated damages set at $680 per day for delays beyond the deadline. It is mandated that prevailing wages be paid to all workers involved. The contract value is estimated to range between $50,000 and $150,000, and the project is managed by Nevada Public Works, a State and Local Government Entity. Interested contractors can respond by November 21, 2024, with primary contact details provided for further inquiries. The project emphasizes timely completion and adherence to wage standards, ensuring quality upgrades to the facility’s ventilation and climate control systems.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FILTER, ELEMENT, AIR,Open now, due in 7 days
  • POWER, BREEZEROpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNevada Public Works
Contacts1 person available
OfficeN/A

Full Description

Show more
Base Bid Description: Replace exhaust fans and temperature controls per plans and specifications.
Contract Time: 32 calendar days.
Liquidated Damages: $680.00 per day.
Prevailing Wages must be paid on this project.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS