Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

EXPRESSION OF INTEREST FOR FABRICATION OF THE WASTE TRANSFER LINE FOR THE WEST AREA RISK MANAGEMENT (WARM) PROJECT

Open
H2C-391121-26-001

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Hanford Tank Waste Operations & Closure LLC (H2C) is conducting market research through Expression of Interest No. H2C-391121-26-001 to identify qualified suppliers for the West Area Risk Management (WARM) Project. The scope involves the procurement, build-to-print fabrication, assembly, testing, and delivery of approximately 5,000 feet of safety-significant pipe-in-pipe waste transfer lines. The system features a stainless steel primary carrier pipe concentrically located within a carbon steel secondary encasement. All work must adhere to strict industry standards, specifically ASME B31.3 Process Piping and ASME B&PVC Sections V and IX, with a requirement for commercial grade dedication of safety-significant components and the submission of a complete Fabrication, Inspection, and Test Report including hydrostatic testing. Interested firms must submit their EOI letters by December 7, 2026, including a statement of capability, a Quality Assurance Program Manual, past performance references, and a signed confidentiality agreement. Applicants must be registered in the Federal System for Award Management (SAM) and the H2C vendor portal. While this EOI is not a request for proposal, it serves as the precursor to a formal RFP anticipated in December 2027, with a projected subcontract award in June 2027 and final project completion by September 12, 2028. The final contract is expected to be a Firm Fixed Price agreement, with finished assemblies delivered to the 2355 Stevens Drive Warehouse and the Hanford Site.

General Info

H2C seeks suppliers for fabricating and delivering safety-significant waste transfer pipe lines.

Place of Performance

Not specified

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstrfi
High
ZIP

Read all 2 documents

Due in 21 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 21 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 2 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy
Contacts1 person available
OfficeN/A

Full Description

Show more
EXPRESSION OF INTEREST No. H2C-391121-26-001, WARM Waste Transfer Line Hanford Tank Waste Operations & Closure LLC (H2C), a prime contractor to the U.S. Department of Energy (DOE), Hanford Field Office (HFO), is the Integrated Tank Disposition Contractor (ITDC) at the Hanford Site. This Expression of Interest (EOI) is a means of conducting market research to identify parties having an interest in, and the resources to perform, build-to-print fabrication, assembly, testing, inspection, packaging, and delivery of Safety Significant Waste Transfer Line piping in support of the West Area Risk Management (WARM) Project. EOI WARM Waste Transfer Line Fabrication EOI Letters ae due: Monday, December 7, 2026 - 4:00 p.m. Pacific Time

Similar Contracts

Same NAICS industry code

NAICS: 332996
New
DIBBS
NUT, TUBE COUPLING
Solicitation # SPE7M3-27-T-1303
This contract, issued by the DLA Weapons Support Fluid Handling Division, is a small business set-aside solicitation for the procurement of 1,559 tube coupling nuts (NSN 4730-01-543-0356). The items must be manufactured from cadmium-plated 15-5PH stainless steel with .4375-20 UNJF-3B threads. Due to previous customer issues, the DCMA is required to perform a mandatory inspection to verify the presence of threads. The product is classified as a critical application commercial item and must be supplied by a manufacturer or distributor accredited and listed on the Performance Review Institute (PRI) Qualified Manufacturer List (QML) or Qualified Products List (QPL). Technical compliance is governed by standards SAE AS21921D and SAE AS18280H. The procurement is split into two delivery locations: 1,237 units to DLA Distribution Warner Robins and 322 units to DLA Distribution San Diego. The required delivery date is September 29, 2028, with a delivery window of 424 days after order. Shipping is designated as FOB Origin, and packaging must adhere to MIL-STD-2073-1E and MIL-STD-129. Environmental restrictions prohibit the use of Class I ozone-depleting chemicals and the intentional addition of mercury. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and adherence to various FAR and DFARS clauses regarding cybersecurity, hazardous material labeling, and the Buy American program.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 11 days
View Details
NAICS: 332996
New
DIBBS
BUSHING, PIPE
Solicitation # SPE7M3-27-T-1307
Solicitation SPE7M3-27-T-1307, issued by the DLA Weapons Support Fluid Handling Division, is a small business set-aside for the procurement of pipe bushings under NSN 4730-00-580-7417. The requirement is for 276 packages (PG), with each package containing 5 units, totaling 1,380 individual bushings. The items must comply with the SAE J514-3 standard (Revision 12/01/2023) and are designated as critical application items. Delivery is required within 41 days after the order, with a need ship date of January 8, 2027, and a final required delivery date of April 26, 2027. The shipping terms are FOB Origin, with inspection and acceptance occurring at the destination, specifically the DLA Distribution Depot at Hill AFB, Utah. The contract mandates strict adherence to environmental and safety standards, prohibiting the use of Class I ozone-depleting chemicals and the intentional addition of mercury or mercury-containing compounds. Packaging must follow MIL-STD-2073-1E and RP001 requirements, while marking must comply with MIL-STD-129. Administrative processing for payments and receiving reports must be handled electronically via the Wide Area WorkFlow (WAWF) system. Key regulatory clauses include the Buy American Act, DFARS cybersecurity requirements for safeguarding covered defense information, and specific prohibitions against covered defense telecommunications equipment.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 11 days
View Details
NAICS: 332996
New
DIBBS
TEE, TUBE TO BOSS
Solicitation # SPE7M4-27-T-3274
Solicitation SPE7M4-27-T-3274, issued by the DLA Weapons Support Fluid Handling Division, is for the procurement of 21 steel Tee Tube to Boss components with a 3/8 inch OD tube size. This is designated as a critical application item and a commercial item that requires manufacture by an accredited manufacturer and/or assembly by an accredited distributor as listed in the Performance Review Institute Qualified Manufacturer List (QML) or Qualified Products List (QPL). The manufacturing process must utilize forging, and the items must adhere to Class 3 thread standards and technical specifications SAE AS1032H (Revision H) and SAE AS4875/1A (Revision A). The use of Class I ozone depleting chemicals is strictly prohibited. The contract specifies a delivery lead time of 165 days after order, with a need ship date of May 12, 2027, and an original required delivery date of June 18, 2028. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, the DLA Distribution Depot Oklahoma at Tinker AFB. Packaging must comply with ASTM D3951 and MIL-STD-129, with DLA Master List of Technical and Quality Requirements taking precedence. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with various FAR and DFARS clauses, including the Buy American and Balance of Payments Program and NIST SP 800-171 cybersecurity standards.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 11 days
View Details

More opportunities from Department Of Energy

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS