This Solicitation opportunity from California was posted on November 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
EXT MOH | Renaissance Ent. Ctr - Fire Alarm System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This procurement involves the complete replacement of the fire alarm system at the Renaissance Entrepreneurial Center located at 275 5th Street, San Francisco. The project scope includes designing, permitting, installing, testing, and commissioning a new addressable, code-compliant fire alarm system that meets the requirements of the 2025 California Fire Code, NFPA 72, and San Francisco Fire Department standards. The system will feature a Silent Knight or equivalent control unit, along with new addressable devices, notification appliances, wiring, conduit, and power supplies. The contractor, a licensed C-10 and UL-certified firm, is responsible for all aspects of the project, including submittals, permits, inspections, and coordination with the owner and SFFD. The process culminates in pre-testing, owner acceptance, and final approval by the fire department. While there is no set subcontracting goal for local businesses, a 10% bid discount is available for qualified Local Business Enterprises, encouraging local participation. The solicitation, issued by the City of San Francisco, is scheduled for bid submission from November 5, 2025, through December 4, 2025, with a submission deadline of December 10, 2025. Bidders are instructed to submit their proposals electronically via a designated Google Drive link. The project value is estimated to be between 300,000 and 600,000 dollars, though specific pricing details are not provided in the documents. The contract emphasizes compliance with relevant standards and regulations, including the California Fire Code and NFPA 72, and mandates that the contractor holds appropriate licensing and certifications. The project requires thorough testing and inspection at the site, with final acceptance contingent upon approval from the SFFD. The procurement process does not specify FAR clauses or detailed evaluation criteria but indicates that price may be the primary factor in award decisions. Overall, this project aims to upgrade the fire alarm infrastructure to enhance safety and ensure regulatory compliance for the four-story commercial building.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- FRSMP277009/JLM-Lighting Phase 2Open now, due in 14 days
- 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 2 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Link to bid docs: https://drive.google.com/drive/folders/1SyrvVpW3OvzNfO8kWmeffa9WNAjEsxLB
Contacts: Steve Gallagher +1 (•••) •••-••••Sign up to see this detail •••••@•••••.•••Sign up to see this detail
or
Damien Chacona +1 (•••) •••-••••Sign up to see this detail •••••@•••••.•••Sign up to see this detail
---------------------------------------------
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 750+ contractors already using CLEATUS
