Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ext Prt | Pier 80 Mooring & Berthing Improvements

Closed
SFGOV-0000010517State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423710
Federal
Replace Exterior Cipher Locks and Exit Hardware Retrofit, Hawaii
Solicitation # W912CN27QA010
The US Army is requesting quotes for the replacement of exterior cipher locks and the retrofit of exit hardware at Building 768, Schofield Barracks, in Honolulu, Hawaii. This project involves the removal of obsolete hardware and the installation of 17 DoD-approved standalone electronic 10-PIN pushbutton cipher locks, heavy-duty vertical rod panic exit hardware, and high-security Small Format Interchangeable Cores (SFIC). The scope includes specialized conversion trim for both standard and bullet-resistant door assemblies, ensuring all installations meet DoD physical security requirements and NFPA 101 Life Safety egress regulations. Key deliverables include the fully operational hardware, master override and control keys, DPW key custody documentation, programming guides, and a two-year warranty on workmanship and hardware. This solicitation is a total set-aside for Women-Owned Small Businesses under NAICS 432710. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation method, requiring offerors to provide detailed technical specifications, a compliance crosswalk, and proof that installation personnel are GSA-certified and manufacturer-authorized. The period of performance is 30 calendar days from the date of award, with shipping terms set as FOB Destination. Invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. Quotations are due by November 24, 2026, and must include a firm-fixed-price proposal and a comprehensive technical approach.
0413 Aq Hq Contract Augmented

POSTED

7 days ago

DEADLINE

in 7 days

General Info

Place of Performance

CA, USA

Set-Aside

lbe

Documents

2
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstrfp
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Industrial Piping and Valve SupplyOpen now, due in 13 days
  • Proprietary Door Parts SupplyOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Francisco
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
PROJECT BACKGROUND AND SCOPE
The current fendering infrastructure serving Pier 80 requires improvements to maintain cargo vessel operations and to increase the flexibility to serve multiple types of vessels and industry. The Port will replace its existing makeshift fender system of oversized tires hung from aging and deteriorating marine hardware with a new fendering system. Additional mooring bollards will also be installed at select locations to supplement existing mooring points.
The type of fendering and their locations were designed to maximize the type of vessels able to berth. It will be able to accommodate the current Roll-on-Roll-off ship types and future larger cargo vessels. They will also be able to support cruise ship berths. The scope of work includes: • Remove deteriorated fendering system from pier deck; • Remove dilapidated timber fender piles • Installation of a new fendering system and associated hardware; and • Installation of mooring bollards and associated hardware
Copy and paste the following link to your browser for the Registration Page: https://www.sfport.com/business/contract-opportunities/contract-no-2871-pier-80-mooring-and-berthing-improvements

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS