Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Extraction Well No. 2

Forecast
2022090402State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stockton East Water District is overseeing the Extraction Well No. 2 project, which involves the construction of a new groundwater well located at the Dr. Joe Waidhofer Drinking Water Treatment Plant in Stockton, California. The project requires drilling a well to a depth of approximately 460 feet with an estimated production rate of 3,000 GPM. This well is designed to function as a supplemental water supply during dry years to support the treatment plant. The project has received official approval and a Notice of Determination from the State Water Resources Control Board as of September 11, 2025. Under the California Environmental Quality Act, a Negative Declaration was prepared, concluding that the construction will not have a significant environmental impact within the board's jurisdiction, and no mitigation measures or monitoring plans are required. The project is categorized under NAICS code 237110 for heavy and civil engineering construction.

General Info

Construct new 460-foot groundwater well at Stockton plant for dry-year supply, up to 3,000 GPM, regulated by State Water Board.

Agency

California → Stockton East Water District

Place of Performance

East Main Street and New Water Road, Stockton, CA, 95215

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Stockton East Water District
Contacts2 people available
OfficeN/A

Full Description

Show more
The project involves the construction of a new groundwater well on the premises of the Dr. Joe Waidhofer Drinking Water Treatment Plant (WTP). The construction involves drilling a well approximately 460 feet deep, with an estimated production rate of 3,000 GPM. The well will serve as a dry year supplemental supply of water to the WTP.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 17 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS