F--Vegetation Removal and Herbicide Treatment, Cochiti Dam, NM

Awarded
W912PP-15-T-0167Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
FAC 120 - Firebreak Maintenance and Hazard Tree Removal in Nickserson State Park FY27
Solicitation # BD-27-1020-DCRFC-DC366-134921
The Massachusetts Department of Conservation and Recreation is soliciting bids for firebreak maintenance and hazard tree removal at Nickerson State Park for fiscal year 2027. The scope of work is divided into two primary tasks: the maintenance of the firebreak along Ober Road through tree removal, mulching, and mowing, and the mitigation of hazard trees throughout the park's campgrounds, internal roads, and bike paths. All work must comply with OSD Statewide Contract FAC 120, and the contractor is required to ensure that tree stumps protrude no more than two inches from the ground. Qualified bidders must provide a completed Bidder Response Form, three relevant references, and certified insurance policies for all subcontractors. Evaluation is based on the best value to the Commonwealth, considering price, equipment, safety programs, and the qualifications of onsite staff. Key requirements include a superintendent with a valid Massachusetts Certified Arborist or International Society of Arboriculture certification and machine operators holding a current Massachusetts Timber Harvester License. All equipment must meet ANSI specifications and current safety inspections. The project is subject to Department of Labor Standards Prevailing Wage Rates. Work must be performed Monday through Friday between 7:00 am and 6:00 pm, commencing within ten business days of the Notice to Proceed. Responses are due by 4:00 PM on November 17, 2026. Bidders may apply for a single task or both, though the agency reserves the right to award tasks separately. The primary point of contact for the solicitation is Casey Duggan, with Paul Gregory serving as the task manager for firebreak maintenance.
Department of Conservation and Recreation

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 561730
New
SLED
SNOW PLOWING AND/OR HEAVY DUTY SNOW REMOVAL WITH WHEEL LOADERS 2026-2027
Solicitation # 8968
The City of Waterbury is soliciting qualifications from multiple operators to provide citywide snow removal services for the 2026-2027 fiscal year. The scope of work is divided into two primary categories: snow plowing and sanding of city roads, and heavy duty trucking and snow removal utilizing wheel loaders. Services must be available from November 1, 2026, through April 30, 2027, under the direction of the Public Works Department and the Bureau of Streets. All equipment must undergo city inspection by November 20, 2026, to ensure it meets minimum standards. Plowing equipment is categorized by gross vehicle weight ranging from light duty (11,500 to 19,500 lbs) to heavy duty (33,001 lbs or greater), with established hourly rates between 90 and 250 dollars depending on the equipment type and service provided. The selection process involves a two-stage approach consisting of short-listing based on technical and managerial capabilities, equipment quality, and prior performance, followed by interviews and negotiations. Awarding is at the sole discretion of the City. Successful vendors must comply with the Federal Davis-Bacon Act, the American Recovery and Reinvestment Act of 2009, and HUD Section 3 clauses. Additionally, vendors must obtain approval from the City Risk Manager for all insurance before commencing operations and are required to use city-issued magnetic plates on all vehicles. Responses were due by November 13, 2026, and required the submission of a vendor qualification statement, vehicle information sheets, and a non-collusive affidavit.
DAS Procurement

POSTED

about 8 hours ago

DEADLINE

in 15 days
NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. This public works project involves a comprehensive scope of work including demolition, site and soil preparation, irrigation installation using 2-inch Schedule 40 PVC, planting, concrete work, lighting, and low-voltage electrical work. The contract will be awarded to the lowest responsive and responsible bidder on a firm-fixed fee basis, with a required project completion timeline of 45 working days. Bids must be submitted electronically via the OpenGov portal, with the final deadline extended to November 5, 2026, at 5:00 pm. Qualified contractors must possess a Prime B license and comply with various regulatory requirements, including the Living Wage Ordinance, Equal Employment Opportunity regulations, and DIR registration for prevailing wage compliance. Bidders are required to provide a bid security of at least 10 percent of the bid amount, and the successful awardee must provide a 100 percent performance bond and a payment bond of at least 50 percent if the contract is under 1 million dollars. Evaluation factors include the complete submission of the bid form and available local business preferences, offering a 2 percent preference for businesses with a local office and an additional 4 percent for those with local ownership. All work must adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and applicable ADA and ABA accessibility standards.
Economic Development and Housing

POSTED

about 11 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This sole source contract, awarded under the 8(a) Program to the Department of Defense, requires the contractor to provide all personnel, equipment, and materials for vegetation removal and herbicide treatment at the Cochiti Dam in New Mexico. The scope of work involves cutting woody vegetation primarily with hand tools, mulching herbaceous materials, and applying aquatic-approved herbicides to stumps and remaining vegetation to prevent regrowth. The project is divided into a base bid for Area 1 and five optional tasks for Areas 2 through 6, covering a total of approximately 430 acres. The contractor must adhere to strict environmental and safety regulations, including the submission of a Pesticide Management Plan, a Contaminant Prevention Plan, and a Spill Control Plan. All herbicide applications must be performed by a State of New Mexico Certified Herbicide Applicator in compliance with EPA and federal laws. Performance will be verified through a joint inspection with the government after treatment, and the contractor is responsible for restoring any damaged government property and re-treating any missed vegetation.

General Info

Contract Value

$460,171.76

NAICS

561730 - Landscaping Services

Place of Performance

NM, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Albuquerque
ContactsNo contacts available
OfficeALBUQUERQUE, NM, 87109-3435, USA
Office AddressALBUQUERQUE, NM, 87109-3435, USA
ContactsNo contact information available

Full Description

Show more
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform vegetation removal and herbicide treatment for the Cochiti Dam. 1 Basic Services: The Contractor shall provide all personnel, equipment, supplies, materials, facilities, transportation, tools, supervision, and any other items and non-personal services necessary to perform vegetation removal and herbicide treatment in the designated areas at Cochiti Dam. 5.2 Vegetation Removal for Areas 1-6 (described below at sections 5.12 - 5.18) 5.2.1 Vegetation shall be removed primarily using hand tools. The Contractor shall cut all woody vegetation with a trunk diameter of greater than two (2) inches at the base. For trunk diameters greater than six (6) inches, the Contractor shall leave a 12 quote mark inch high stump for future excavation. All woody vegetation shall be stacked and removed from vegetation-free zone and placed in a designated area. 5.2.2 The remaining vegetation should be cut to the base (using chain saws or other hand equipment - no mechanical equipment shall be used on the dam face or groin for this work). After cutting the vegetation, the remaining woody vegetation shall be treated with an aquatic approved herbicide to prevent re-growth. The herbicide application requirements are described below in this PWS. 5.2.3 The Contractor shall coordinate with the USACE POC for exact location of the disposal areas. The herbaceous (non-woody) vegetative material shall be mulched and mulched material will be placed per direction of the COR; mulched material may not be left on the dam face or in the vegetation-free zone. Material that cannot be mulched will be piled in the designated disposal areas. The Contractor shall coordinate with the USACE POC for exact locations of the disposal areas. Multiple chipping stations will be allowed per area; at a minimum it is expected that one upstream of the embankment and one downstream of the embankment will be established for each Area such that hauling distances will be minimized for the Contractor. Additional hauling and disposal details are discussed in sections 5.12-5.18. 5.3 Herbicide Application for Areas 1-6 (described below at sections 5.12 - 5.18): Within twenty-one (21) days of the contract award, the Contractor shall prepare a Pesticide Management Plan and submit the plan for Contracting Officer approval. Include in the plan: sequence of treatment, dates, times, locations, pesticide trade name, EPA registration numbers, authorized uses, chemical composition, formulation, original and applied concentration, application rates of active ingredient (i.e. pounds of active ingredient applied), equipment used for application, Safety Data Sheets (SDS), calibration of equipment and departures from the manufactures specifications. Federal, State, Regional and Local pest management record keeping and reporting requirements as well as any additional Project Office specific requirements shall be fulfilled. 5.3.1 Contractor shall provide treatment of all cut stumps within 10 minutes to prevent regrowth. All remaining vegetation within the project area shall be treated. This shall be accomplished by spraying with appropriate herbicide mixture (based on the vegetation type, the time of year, as well as efficacy) at the base of the vegetation remaining after cutting. The herbicide should contain a dye so that treated areas and stumps may be visible. Herbicide application shall be conducted with power operated sprayers attached to tractors or other approved vehicles and/or hand sprayers where applicable by a state-certified applicator. Applications within 50 feet of surface water shall be conducted with an herbicide approved for aquatic use, specifically a drinking water source. 5.3.2 Herbicide application should follow all applicable guidelines. 5.3.2.1The Contractor shall comply with Federal Insecticide, Fungicide, and Rodenticide Act (Title 7 U.S.C. Section 136) for requirements on contractor's licensing, certification and record keeping. Herbicides shall be applied by a State of New Mexico Certified Herbicide Applicator. The Contractor shall provide their current certification in the Pesticide Management Plan. The Certified Applicator shall follow the EPA approved label(s) and State of New Mexico requirements. Empty containers shall be disposed of as solid waste offsite and in accordance with Federal, State, Regional and Local laws and regulations. 5.3.2.2 Herbicide formulations shall be mixed or poured into spray equipment within designated staging areas. These staging areas must be located away from the floodplain, irrigation canals or locations where groundwater, irrigation water or drinking water could potentially become contaminated. 5.3.2.3 The Contractor shall not allow equipment to overflow. Prior to application of herbicide, all equipment shall be inspected for leaks, clogging, wear, or damage and shall be repaired prior to being used. The equipment operator shall keep a spill kit on within the immediate area, including pads that can be used to contain any drips or spills that may result from filling or operating the equipment. Any equipment in disrepair shall be removed from the site immediately. 5.3.2.4 For applications of pesticides which results in a discharge to Waters of the United States the Contractor shall comply with the U.S. EPA National Pollutant Discharge Elimination System (NPDES) Pesticide General Permit (PGP) for Discharges from the Application of Pesticides. The Contractor shall comply with the Albuquerque District's Pesticide Discharge Prevention Plan (PDPP) and shall provide all information required for necessary updates to the PDPP and annual reporting, as identified in Section 7 of the PGP by the end of each calendar year or before contract termination. 5.4 The areas targeted for herbicide application have the potential for difficult access and tripping or falling hazards. Large rocks and a steep grade may require the Contractor to implement appropriate safety precautions. No cutting or spraying should occur beyond the limits of the dam face and groin and vegetation-free zone defined in this contract. Boundaries will be reviewed on site with the USACE Point of Contact (POC), Mr. Mark O. Rosacker +1 (555) 000-0000. 5.6 Work shall be performed in a manner that will limit disturbance to the dam face and groin. Areas that are disturbed shall be restored to its existing condition as approved by the USACE POC. 5.7 The Contractor shall re-treat stumps that are missed during initial herbicide treatment following site inspections by the Government. Contractor shall perform follow-up herbicide treatment of any root sprouts that occur after the first growing season. 5.8 All employees shall read and comply with all Safety Data Sheet(s) (SDS) and work related materials before usage. SDS information shall remain on site. 5.9 Additional environmental protection requirements 5.9.1 Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and evaporation. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed in accordance with Federal, State, and local laws and regulations. 5.9.2 All project materials shall be recycled to the extent possible. Solid waste generation shall be minimized throughout the duration of the project. 5.9.3 Since there is no construction ground disturbance, there will be no stormwater control required for this project. If at any time there is ground disturbance over one acre in size, a Storm Water Pollution Prevention Plan (SWPPP) shall be required for Government approval and a Notice of Intent (NOI) shall be filed with the State of New Mexico. 5.9.4 No hazardous waste or petroleum product releases have been associated with this project area. The Albuquerque District Office Environmental Engineering Section shall be contacted and a plan for remediation or removal shall be prepared if any unknown solid wastes or any hazardous, toxic, or radioactive wastes are identified during the execution of the Cochiti Dam Vegetation Removal project. a. The Contractor shall provide a Contaminant Prevention Plan that identifies potentially hazardous materials and substances to be used on the job site, and details provisions for compliance with Federal, State, and local laws and regulations for storage and handling of these materials. In accordance with EM 385-1-1, a copy of the Safety Data Sheets (SDS) and the maximum quantity of each hazardous material to be on site at any given time shall be included in the contaminant prevention plan. As new hazardous materials are brought on site or removed from the site, the plan shall be updated. b. The Contractor shall provide a Spill Control plan shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations. The Spill Control Plan supplements the requirements of EM 385-1-1. This plan shall include as a minimum: (1) The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual shall immediately notify the Contracting Officer and Cochiti Lake Project Manager in addition to the legally required Federal, State, and local reporting channels (including the National Response Center +1 (555) 000-0000) if a reportable quantity is released to the environment. The plan shall contain a list of the required reporting channels and telephone numbers. (2) The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup. (3) Training requirements for Contractor's personnel and methods of accomplishing the training. (4) A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified. (5) The methods and procedures to be used for expeditious contaminant cleanup. (6) Disposal of all project related wastes shall be off-site and in accordance with all Federal, State, Regional and Local laws and regulations. c. All construction materials shall be recycled to the extent possible. Solid waste generation shall be minimized throughout the duration of the project. d. Any leftover materials shall be managed in accordance with the Safety Data Sheet (SDS). Empty containers shall be disposed of as solid waste in accordance with Federal, State, Regional and Local laws and regulations. e. No concrete or concrete like materials will be used for this project. f. No waste water is expected to be generated from the project activities. g. In the case that any non-native soils, discolored soil, soil with an odor, or any debris are discovered, stop work immediately and notify the District Office, Environmental Engineering Section. If the material is determined to be free of contamination and unregulated, work will proceed without change. h. If any material, not indicated, that may be hazardous to human health upon disturbance during work activities is encountered, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the District Office Environmental Engineering Section will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to quote mark FAR 52.243-4, Changes quote mark and quote mark FAR 52.236-2, Differing Site Conditions quote mark . i. All equipment that shall be used at the site shall be inspected prior to being mobilized to the site to ensure that there are no leaks or drips. There shall be no fueling of the equipment or maintenance work performed at the project site. The equipment operator shall keep a fuel and fluids spill kit on board including absorbent pads that can be used to contain any drips or spills that may result from operating the equipment. Any equipment in disrepair shall be removed from the site immediately. j. Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and contamination of the environment. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed off-site in accordance with State, and local laws and regulations. k. Pesticides shall be delivered to the site in the original, unopened containers bearing legible labels indicating the EPA registration number and the manufacturer's registered uses. Store pesticides according to manufacturer's instructions and under lock and key when unattended. l. The Contractor shall submit a Pesticide Treatment Plan to the Contracting Officer for review and approval, and shall include: sequence of treatment, dates, times, locations, pesticide trade name, EPA registration numbers, authorized uses, chemical composition, formulation, original and applied concentration, application rates of active ingredient (i.e. pounds of active ingredient applied), equipment used for application, calibration of equipment and departures from the manufactures specifications. This Plan shall be updated to include actual treatment dates and use. Federal, State, Regional and Local pest management record keeping and reporting requirements are required. m. Apply pesticides using a State Certified Pesticide Applicator and in accordance with EPA label restrictions and recommendation. The Certified Applicator must wear clothing and personal protective equipment as specified on the pesticide label. All equipment shall be filled in a designated area, do not allow the equipment to overflow. The equipment operator shall keep a spill kit on within the immediate area, including absorbent pads that can be used to contain any drips or spills that may result from filling or operating the equipment. Any equipment in disrepair shall be removed from the site immediately. Copies of the applicator's certification shall be submitted to the Contracting Officer with the Pesticide Treatment Plan. n. It is required that land scarring during these activities be kept at a minimum. Any wheel ruts or land damage caused by vehicles used during these activities shall be leveled and repaired immediately or after vegetation removal activities are complete. o. Provided that the disturbance is less than one acre in size, there will be no stormwater control required for this project. If at any time the disturbance is one acre in size, there will be stormwater controls required for this project and the following requirements apply. The contractor shall prepare a Storm Water Pollution Prevention Plan (SWPPP) for Government approval. The Contractor shall file a Notice of Intent (NOI) with the US Environmental Protection Agency, install and maintain the required controls, and inspect the controls, document their condition, and make any required repairs or changes in accordance with the 2012 National Pollutant Discharge Elimination System General Permit for Discharges from Construction Activities and the Project SWPPP. Templates for the required SWPPP documentation are available at the EPA website: http://water.epa.gov/polwaste/npdes/stormwater/Stormwater-Pollution-Prevention-Plans-for-Construction-Activities.cfm p. Since the disturbance is limited only to the existing roadways there will not be stormwater controls required for this project. If at any time the scope of this project changes to include widening the existing roads or constructing a new road, the Contractor shall immediately notify the Contracting Officer. Depending on the size of the ground disturbance that will be needed, the Contracting Officer may require the Contractor to prepare a Storm Water Pollution Prevention Plan (SWPPP) for Government approval and file a Notice of Intent (NOI) with the US Environmental Protection Agency. 5.10 The Contractor shall contact the POC within 20 days after completion of herbicide application. A joint inspection of treated areas will be conducted to determine performance. If treatment requirements are met and application documentation required in Section 5.3.2.4 has been provided, the Contractor may submit an invoice for payment at that time. If requirements are not met as determined by the inspection, the Contractor shall return within 3 working days, weather permitting, and re-spray unaffected vegetation prior to submitting invoices for the original application. 5.11 The Contractor shall notify the POC immediately of any damage to Government or private property and injury to any person resulting from Contractor operations. The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of Contractor operations. Reasonable care shall be taken to avoid damage to existing structures and equipment. Any such damage shall be repaired or replaced as directed by the Contracting Officer, or their authorized representative, at no cost to the Government. If the Contractor does not make such repair or replacement, the cost thereof will be deducted from payments made to the Contractor. The Contractor shall advise the POC of any damage to the facilities due to vandalism or other causes on the day he/she first notices such damage. Upon completion of the work, the Contractor shall leave existing works in a condition equal to that which existed when work started. There are a total of six areas identified for vegetation removal and herbicide treatment; each area will be bid separately as an option for this contract. Equipment can access all areas via established paths and roads at several access points along the alignment; access in restricted areas shall be coordinated with the COR to reduce Contractor commute times. 5.12 Base Bid: Area 1; The base bid for this contract will be Area 1 as identified in Appendix A. This area is bounded by the centerline of the dam, 50 `feet past the downstream toe, and Stations 37+50 to 102+50. The area is approximately 80 acres. 5.13 (Optional Task 1): Area 2 is approximately 50 acres, and is bounded by the centerline of the dam, the upstream lake water surface or 50' past the upstream heel, whichever is less, and Stations 37+50 to 102+50. Woody vegetation cut in this area can be placed along the shoreline and will be removed via boat by USACE. 5.14 (Optional Task 2): Area 3 is approximately 82 acres, and is bounded by Stations 2+50 and 37+50. The area extents upstream and downstream are defined by quote mark groin quote mark (15' past the toe/heel) and by quote mark embankment area quote mark (50' past the toe/heel). This groin/embankment delineation will be at Station 9+50 for all intents and purposes. This area includes the dam crest. 5.16 (Optional Task 3): Area 4 is approximately 75 acres, and is bounded by Stations 102+50 and 157+50, to include the dam crest and extending 50' upstream and downstream of the heel and toe, respectively. Additional access is available to this area by removal of a section of guardrail. This will be accomplished in close coordination with the COR. 5.17 (Optional Task 4): Area 5 is approximately 90 acres, and is bounded by Stations 157+50 and 241+00, to include the dam crest and extending 50' upstream and downstream of the heel and toe, respectively. Cut vegetation in this area shall be mulched/chipped and placed outside the vegetation-free zone in as many piles as is practical for the Contractor, the exact locations of which will be at the discretion of the COR. 5.18 (Optional Task 5): Area 6 is approximately 53 acres, starting at Station 241+00 and extending through to the southern end of the spillway. This area includes the dam crest and extends 50' upstream and downstream of the heel and toe, respectively. This area also includes vegetation removal/control in areas adjacent to the spillway training walls of the spillway, extending 15' from the walls, as well as areas including and within 15' of the upstream channel walls as shown in the figure in Appendix A. Cut vegetation in this area shall be mulched/chipped and placed outside the vegetation-free zone in as many piles as is practical for the Contractor, the exact locations of which will be at the discretion of the COR.

More opportunities from Department Of Defense → W075 Endist Albuquerque

Same awarding agency

NAICS: 237310
New
Federal
Special Notice - Announcement of Industry Day - Progressive Design-Build (PDB) Other Transaction (OT) for FY28 High Speed Test Track, Holloman Air Force Base, Otero County, Mexico
Solicitation # W912PP27Z1CUU
The U.S. Army Corps of Engineers, Albuquerque District, is issuing a special notice for a Progressive Design-Build Other Transaction agreement under the authority of 10 U.S.C. 2808a for the FY28 High Speed Test Track at Holloman Air Force Base in Otero County, New Mexico. This Firm-Fixed-Price project focuses on the repair and upgrade of critical infrastructure, including girder repair and restoration, the replacement of 3,963 linear meters of track connection tie-down points, the widening and replacement of STAPP East and West access roads, and repairs to the Camera Pad Road. The completed track must maintain an operational lifespan of at least ten years beyond construction. The procurement will follow a streamlined, two-step competitive selection process to identify the most qualified progressive design-build entity. In the first step, interested parties must submit a Statement of Qualifications, and up to three selected companies will proceed to the second step, which consists of pitch meetings. The project is structured into two phases: Phase 1 covers design and pre-construction services, while Phase 2 encompasses final design and construction. Cybersecurity Maturity Model Certification requirements will be determined based on guidance available during the first step of the request. Interested parties are advised to monitor sam.gov for the official solicitation announcement and complete proposal instructions.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 14 days
View Details
NAICS: 236220
Federal
REQUEST FOR INFORMATION/SOURCES SOUGHT
Solicitation # W912PP27RA003
The U.S. Army Corps of Engineers Albuquerque District is conducting a sources sought market survey for the construction of the Space Rapids Capabilities Office at Kirtland Air Force Base in New Mexico. This preliminary planning effort seeks to identify qualified industry sources for a competitive, firm-fixed-price, design-bid-build contract. The project involves the construction of a 67,833 square foot, two-story facility featuring controlled office spaces, a 200-seat auditorium, and specialized infrastructure including reinforced foundations and secure communications. The estimated construction value is between 50 million and 100 million dollars, with an anticipated solicitation issuance date around April 22, 2027. Key requirements for the project include compliance with Department of Defense antiterrorism and force protection standards, as well as Unified Facilities Criteria for permanent construction. The facility must support controlled networks and accreditation with physical and electronic security measures. Prospective prime contractors must demonstrate experience with ICD 705 and AV/ESS requirements, the design-bid-build process, and federal antiterrorism provisions. Additionally, the scope includes the installation of a LenelS2 OnGuard alarm system, requiring all contracted personnel to hold a Secret security clearance and adhere to DD Form 254 specifications. The government is also soliciting feedback on the potential use of Project Labor Agreements for this large-scale effort.
Commercial and Institutional Building Construction

POSTED

11 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
Federal
Combined Synopsis/Solicitation for; W912PP25RA009 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR CIVIL WORKS PLANNING STUDIES AND ASSOCIATED DESIGN ARCHITECT-ENGINEER (A-E) SERVICES, ALBUQUERQUE DISTRICT, N
Solicitation # W912PP25RA009
Solicitation W912PP25RA009 is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Civil Works planning studies and associated Architect-Engineer (A-E) services supporting the U.S. Army Corps of Engineers (USACE) Albuquerque District. The contract covers a regional area of operations spanning New Mexico, Southern Colorado, and Southwest Texas. With a shared capacity of 49.9 million dollars, the government intends to award contracts to five to seven firms across unrestricted and small business reserve pools. The scope of work includes interdisciplinary design, hydrologic and hydraulic analysis, river modeling, and construction support for water resource structures such as dams and levees. Selection is based on professional qualifications per the Selection of Architects and Engineers Statute, with a primary focus on specialized experience in flood control studies within the Albuquerque District. Evaluation criteria include professional qualifications, past performance over the last seven years, capacity to execute simultaneous task orders, and knowledge of the locality. Minimum requirements include proficiency in AutoCAD Civil 3D, ESRI products, and familiarity with USACE Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE). Offerors must submit a complete SF330 via the Procurement Integrated Enterprise Environment (PIEE) portal by November 6, 2026.
Engineering Services

POSTED

14 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS