Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on January 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fabrication & Delivery of Weathering Steel Poles for the South County Trans

Closed
26-011-IFBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332312
New
Federal
Steel and Other Metal Materials for the Marietta Repair Station: Stamford De-Watering Box Material PH 1
Solicitation # W9123727QA011
Solicitation W9123727QA011 is a firm-fixed price commercial supply contract issued by the US Army Corps of Engineers, Huntington District, for the procurement of various steel and metal materials to support the Stamford De-Watering Box project at the Marietta Repair Station in Ohio. This procurement is a 100 percent small business set-aside under NAICS code 332312. The required materials include a wide array of ASTM standard products, specifically ASTM 1018 CR round bars, ASTM A434 CL bc, ASTM A53 seamless pipe, ASTM 1026 seamless tubing, ASTM A36 plates and bars, ASTM A709 Gr 50 plates, T-beams, and flat bars, as well as ASTM A325 fasteners. Specialized fabrication is required for certain ASTM 709 Gr 50 plates, including 1/8 inch tolerances and 45-degree double bevels as specified in the technical drawings. The selected vendor is responsible for arranging shipping to the Marietta Repair Station, with the government handling the unloading of materials upon arrival. All deliveries must be completed within eight weeks of the award date and must be accompanied by traceable mill certifications and testing reports. To be eligible for award, firms must be registered in the System for Award Management and comply with DFARS clauses 252.225-7001 and 252.225-7002 regarding the Buy American and Balance of Payments Program and Qualifying Country Sources as Subcontractors. The contract will be awarded using simplified acquisition procedures, and final invoicing is to be submitted via email once all materials are delivered onsite.
W072 Endist Huntington

POSTED

about 14 hours ago

DEADLINE

in about 18 hours

AI Contract Overview

Show more

The contract involves the fabrication and delivery of weathering steel poles for the South County Transmission project managed by the Lewis County Public Utility District in Washington. The contractor is responsible for providing all labor, equipment, and materials necessary to fabricate and deliver the poles according to specific design specifications outlined in the contract exhibits. The work will be performed primarily in Lewis, Washington, and must adhere closely to the requirements detailed in Exhibit A and Exhibit D, which include design and drawing specifications. This solicitation, identified under number 26-011-IFB, was posted on January 20, 2026, with a response deadline of February 11, 2026. The contract is managed by the Lewis County Public Utility District, a SLED organization, and prospective contractors can direct inquiries to the primary point of contact, Marc Ripley, via email or phone. The contract requires compliance with all outlined design criteria to ensure the delivery of high-quality fabricated poles suitable for the transmission infrastructure project.

General Info

Fabrication and delivery of weathering steel poles for Lewis County transmission project, meeting design specs.

Documents

1

Webs Place Holder for documents

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Lewis County Public Utility District
Contacts1 person available
OfficeWA, USA
Office AddressWA, USA
Contacts

Interested Companies (15)

D'Ewart Representatives
Northern Garden Supply

See All 15 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Contractor shall provide labor, equipment, materials for fabrication and delivery of Weathering Steel Poles in accordance with the design specifications listed in Exhibit A: Requirements & Exhibit D: Drawings.

More opportunities from Washington → Lewis County Public Utility District

Same awarding agency

NAICS: 332311
SLED
Substation Control Enclosure for Jackson Highway Substation
Solicitation # 26-057-IFB
Public Utility District No. 1 of Lewis County has issued solicitation 26-057-IFB for the purchase, fabrication, delivery, offloading, and installation of a prefabricated control enclosure and associated equipment for the Jackson Highway Substation in Lewis, Washington. The project requires the enclosure to be designed according to the 2018 International Building Code Risk Category III and utilizes new, top-quality materials. All deliverables must be delivered, placed on the pad, and finally installed no later than October 1, 2027. The contract is governed by the terms in the solicitation and a sample purchase order, with shipping terms set as F.O.B. destination and a requirement that the vendor warrants all deliverables are fit for purpose. The contract will be awarded to the responsive and responsible bidder offering the lowest total bid price, following a non-scored pass/fail evaluation of administrative compliance and bidder responsibility. Bidders must be licensed to do business in Washington State and provide certifications regarding wage law compliance. For bid amounts of 1.2 million dollars or more, a 5 percent bid guarantee is required, and a 100 percent performance bond is mandatory for contracts involving progress or milestone payments. Bids must be submitted as physical, sealed packages to the district office in Chehalis, Washington, by the November 19, 2026, deadline, as electronic submissions are considered supplemental only.
Prefabricated Metal Building and Component Manufacturing

POSTED

14 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS