Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Fair Oaks Substation Professional Design Services

Active
20260724007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Pasadena, through its Water & Power Department, is soliciting professional engineering services for the Fair Oaks Substation Project, a two-phase infrastructure initiative requiring comprehensive design and bridging documentation. Phase One involves a design-bid-build approach to demolish Fair Oaks Unit 3 and construct new 20 MVA 34/17-kV and 7.5 MVA 34/4-kV substations, while Phase Two adopts a design-build method to install a new 4-kV unit at Brookside Substation, demolish Brookside Unit 2, and remove Fair Oaks Units 1 and 2, alongside installing new high-side switchgear at both locations. The selected firm will provide full design services for Phase One and design-build bridging documents—including preliminary studies, bid assistance, and construction-phase engineering—for Phase Two. The contract emphasizes compliance with ADA Title II, 2010 ADA Standards, WCAG 2.1 Level AA, Section 508, PROWAG, California Building Code Title 24, and Pasadena Municipal Code Chapter 4.08, requiring accessibility documentation such as VPAT/ACR reports, record drawings in AutoCAD and PDF, relay programming with protective curve calculations, arc flash labeling, and Masterspec-formatted specifications. The work must also adhere to prevailing wage laws, EEO requirements, and environmental regulations including the Clean Air Act and Federal Water Pollution Control Act, with a mandate for a minimum of 30% recycled content in paper products per SB 1383. The proposal must be submitted electronically by 3:00 p.m. Pacific Time on August 27, 2026, through the City’s eProcurement portal, with no paper submissions accepted. Proposals must be divided into a Technical Proposal and a Price Proposal, with the Technical Proposal combined with the Statement of Qualifications and Additional Data not exceeding 50 pages in 12-point font on standard 8½ × 11-inch paper, and the Cover Letter limited to a single page. Required attachments include an IRS Form W-9, California DGS Small or Micro Business certification if applicable, a Pasadena Business License, a DHS Contract Disclosure Form if relevant, a Conflict of Interest Disclosure with Mitigation Plan, insurance documentation, and a Declaration of Non-Collusion. The evaluation is based on a best-value trade-off process, with 45% of the score allocated to Project Understanding and Approach and significant weight given

General Info

Pasadena seeks engineering services for Fair Oaks and Brookside substations, Phase One design-bid-build, Phase Two design-build, due August 27, 2026.

Agency

California → City of Pasadena, Water & Power Department, Power DeliveryView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Pasadena, CA, 91103, USA

Set-Aside

NONE

Documents

(2)

RFP Fair Oaks Substation Professional Design Services

PDFrfp

RFP Fair Oaks Substation Professional Design Services

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pasadena, Water & Power Department, Power Delivery
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Pasadena, Water & Power Department, Power Delivery
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #2026-RFP-0359: The City of Pasadena seeks a qualified engineering firm for the Fair Oaks Substation Project. The project involves two phases. Phase One is a design-bid-build to demolish Fair Oaks Unit 3 and add a new 20 MVA 34/17-kV substation and a 7.5 MVA 34/4-kV substation. Phase Two is a design-build approach to install a new 4-kV unit at Brookside Substation, demolish Brookside Unit 2, and demolish Fair Oaks Units 1 and 2, along with installing new high-side switchgear at both locations. The consultant will provide complete design for Phase One and design-build bridging documents for Phase Two, including preliminary studies, bid assistance, and engineering services during construction.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified firms, specifically targeting Disadvantaged Business Enterprises (DBE), to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, mechanical, electrical, and instrumentation design, as well as the equipping, testing, and commissioning of the groundwater production well. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water standards, Riverside County, and California State Water Resources Control Board regulations. The solicitation is open to various small business set-asides, including SDB, WOSB, and VOSB. Proposals must be submitted by September 1, 2026, and must include a cover letter, a detailed project approach, staff qualifications, a five-year representative project list, and three professional references. Award selection is based on the most advantageous proposal, considering both price and other factors. Selected consultants must maintain active SAM registration, provide a 100 percent performance and payment bond, and adhere to California prevailing wage laws. Payment is processed via monthly itemized statements with a 45-day review period, though federal award reimbursements must be made within 30 calendar days. The contract also mandates strict adherence to Cal/OSHA safety standards and requires a dedicated Project Manager to coordinate all communications with the District.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details