Fairfax Capacity and Creek Crossings Project (#957)

Forecast
Project #957State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ross Valley Sanitary District (RVSD) Fairfax Capacity and Creek Crossings Project #957 involves the construction and rehabilitation of sanitary sewer mains, manholes, and related appurtenances within the Town of Fairfax and unincorporated Marin County. The project aims to prevent sewer overflows, replace aging infrastructure, and reduce system inflow and infiltration. Key technical deliverables include the rehabilitation of 3,300 linear feet of 6-inch sanitary sewers using PVC or HDPE pipe through a combination of open-cut replacement, pipe bursting, guided jack and bore, and aerial crossings. Additionally, the project will increase capacity by upsizing 400 linear feet of 15-inch gravity sewer to 18-inch and installing 2,000 linear feet of new 18-inch gravity main as a relief sewer along Broadway and Merwin Avenue. The scope also includes four Fairfax Creek crossings, utilizing trenchless methods such as horizontal directional drilling and guided jack and bore, with two crossings remaining above ground. Construction is scheduled to take place from June 2026 through November 2026, with standard working hours from 8 a.m. to 5 p.m. The project site covers approximately 0.3 acres with a total disturbed area of 13,300 square feet. Environmental compliance is managed through a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program (MMRP) in accordance with the California Environmental Quality Act (CEQA), ensuring the protection of biological and cultural resources. The project is administered by the Ross Valley Sanitary District, with Senior Engineer Philip Benedetti serving as the primary point of contact.

General Info

RVSD project to rehabilitate and expand Fairfax sanitary sewers from June to November 2026.

Agency

California → Ross Valley Sanitary District

Place of Performance

See below in 'Other Location Information', Fairfax, CA, 94901

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Ross Valley Sanitary District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Ross Valley Sanitary District
Office AddressN/A
Contacts
Philip BenedettiSenior Engineer

Full Description

Show more
The Ross Valley Sanitary District (RVSD) Fairfax Capacity and Creek Crossings Project #957 (Project) entails the construction and rehabilitation, within the existing alignment, of sanitary sewer mains, manholes, and related appurtenances within unincorporated Marin County and the Town of Fairfax within the County of Marin. The primary goals of this project are to provide adequate capacity to convey wet weather flows preventing sewer overflows and replace aging RVSD infrastructure and reduce inflow and infiltration into the system. The Project would rehabilitate approximately 3,300 linear feet (LF) of 6-inch sanitary sewers with new polyvinyl chloride (PVC) or high-density polyethylene (HDPE) pipe via open-cut removal and replacement (988 LF), pipe bursting (2,200 LF), guided jack and bore (140 LF), and aerial crossing (96 LF). Existing private sewer laterals would be reconnected to the sanitary sewers and rehabilitated as necessary. The Project would also increase wet weather capacity by upsizing approximately 400 LF of 15-inch gravity sewer to 18-inch gravity sewer and installing approximately 2,000 LF of new 18-inch gravity main as a relief sewer throughout downtown Fairfax along Broadway and Merwin Avenue. The Project would cross Fairfax Creek at four intersections. All work crossing Fairfax Creek would involve trenchless methods such as guided jack and bore and horizontal directional drilling. Two of the Creek Crossings are above ground and would not require excavation. The Project site encompasses approximately 0.3 acres and the total area disturbed would be approximately 13,300 square ft. Construction is expected to begin in June 2026 and is anticipated to be completed in November 2026. Work hours will generally be 8 a.m. to 5 p.m.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, piping and fittings, traffic control, demolition, and preconstruction video services. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the project bid documents and specifications provided via the Inland Empire Utilities Agency bidding website.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS