Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maryland was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fall Protection Upgrades - CIP#130003

Closed
IFB-26-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The City of Frederick has initiated a project to upgrade fall protection systems at thirteen city-owned facilities, following a comprehensive Fall Protection Hazard Survey that identified existing hazards and areas for improvement. The project aims to enhance safety for employees and the public by implementing measures outlined in the Fall Protection Hazard Analysis Report and detailed 100% Design Drawings prepared by HWA Corporation. The city is seeking a qualified Prime Contractor through an Invitation for Bid (IFB-26-26) to provide all labor, materials, equipment, and project management necessary to complete the installation of fall protection systems in compliance with federal, state of Maryland, and local safety regulations. This solicitation was posted on May 14, 2026, with a response deadline of June 15, 2026. The work is overseen by the Department of Public Works in Frederick, Maryland, with primary contact Jonathan Whitting and secondary contact Raven Garver available for inquiries. The contract represents a critical effort by the city to mitigate identified fall hazards and ensure regulatory compliance, thereby improving overall safety across multiple city facilities.

General Info

City of Frederick seeks contractor to upgrade fall protection systems at thirteen facilities, ensuring safety compliance.

Place of Performance

MD, USA

Set-Aside

NONE

Documents

10

City of Frederick Labor and Materialmen's Bond

PDF, Low priority1 page · bond
Low

City of Frederick Maintenance Bond

PDF, Low priority1 page · maintenance-bond
Low

City of Frederick Performance Bond

PDF, Low priority1 page · performance-bond
Low

City_of_Frederick_-_Fall_Protection_Construction_Drawings.pdf

PDF

City_of_Frederick_-_Fall_Protection_Recommendations.pdf

PDF

City_of_Frederick_-_Fall_Protection_Report.pdf

PDF

City_of_Frederick_Specification_Document_100%_04272026-Final.pdf

PDF

Fall Protection Upgrades - CIP_130003.pdf

PDF

Pricing_Table.xlsx

XLSX

Scope_of_work-_Fall_Protection_Construction_Phase.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → Projects
Contacts2 people available
OfficeFrederick, MD, 21701, USA
Organization / AgencyMaryland → Projects
Office AddressFrederick, MD, 21701, USA
Contacts
Jonathan WhittingDPW Project Manager I
Raven GarverAssistant Manager of Purchasing

Interested Companies (16)

ConstructConnectCincinnati, OH
Axios IndustriesHaymarket, VA
Martin/MartinLakewood, CO

See All 16 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City Of Frederick has completed a Fall Protection Hazard Survey at various City-owned facilities to evaluate existing fall hazards and identify necessary improvements. Based on the findings of this survey, the City intends to implement recommended fall protection measures to enhance safety and regulatory compliance. Through this Invitation for Bid (IFB), the City seeks to engage a qualified Prime Contractor to furnish all labor, materials, equipment, and project management necessary to construct and install fall protection systems at thirteen (13) City facilities. The work shall be completed in accordance with the Fall Protection Hazard Analysis Report and 100% Design Drawings prepared by HWA Corporation. The objective of this project is to mitigate identified fall hazards, improve employee and public safety, and ensure compliance with all applicable Federal, and State of Maryland, and City of Frederick safety regulations.

More opportunities from Maryland → Projects

Same awarding agency

NAICS: 541330
SLED
Harry Grove Stadium Roof Design
Solicitation # RFP-27-16
The City of Frederick is soliciting proposals for the Harry Grove Stadium Roof Design project to ensure the durable, long-term renewal of the stadium's roofing systems. The scope of work requires a consultant to evaluate and design replacements or restorations for low-slope roofing, metal roofing, and various canopy structures, including those at the main concourse, ticket booth, and main entrance. Key technical challenges include addressing a significant access constraint at the press box roof, redesigning the drainage system to prevent water accumulation on roof surfaces and public areas, and creating an alternative mounting system for stadium speakers to eliminate roof penetrations. The selected consultant must provide complete construction documents and cost estimates, ensuring all designs meet code requirements and are resistant to foul-ball impacts. The project is estimated to have an eight-month design period and a six-month construction period. Proposers must submit a lump-sum professional services fee, while the City will maintain a separate 25,000 dollar allowance for testing and inspection. Evaluation is conducted in two phases, focusing on relevant project experience, work plans, and price. Submissions must be made via the OpenGov portal by October 29, 2026, consisting of a technical proposal limited to 40 pages and a separate price proposal. Requirements include professional licensure in the State of Maryland, adherence to MWBE subcontracting goals, and the use of Procore for invoicing and project administration.
Engineering Services

POSTED

19 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS