Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FAN, VANEAXIAL

Closed
SPE8E7-26-T-2682Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
Federal
Dust Collector with Installation
Solicitation # FA488726Q0054
Solicitation FA488726Q0054 is a Firm-Fixed Price contract for the procurement and installation of a wood dust collection and ambient-air filtration system at Building 948, Luke Air Force Base, Arizona. The requirement consists of two primary line items: the provision of one 7.5 HP dust collector meeting specific salient characteristics, including NFPA 664 compliance and a 230-gallon dump bin, and the professional installation of the unit, including new galvanized ducting, a custom capture plenum, and electrical work. The project requires the removal of the old system and all new packaging, with a mandatory minimum 12-month parts and labor warranty. The required delivery and completion date is December 10, 2026. This is a total small business set-aside with a 10 percent price evaluation preference for HUBZone small business concerns. Award will be made to the technically acceptable offeror with a Green or better Supplier Performance Risk System rating and the lowest Total Evaluated Price. Technical acceptability is determined on a pass/fail basis covering delivery schedule, technical approach, and material specifications. Prospective contractors must coordinate base access through the contracting officer, providing REAL ID compliant identification and vehicle documentation. It is noted that funds are not presently available, and no award will be made until such funds are secured. All invoicing and payment processing must be conducted through the Wide Area WorkFlow system.
FA4887 56 Cons Cc

POSTED

about 20 hours ago

DEADLINE

in 2 days
NAICS: 333413
New
Federal
BOAST RFOP - Diffuser Assembly - NSN: 2540-01-200-5821
Solicitation # PANDTA-26-P-032936
The Army Contracting Command - Detroit Arsenal is soliciting proposals under the Basic Ordering Agreement Sustainment Track program for a firm-fixed-price order of 76 Diffuser Assemblies, part number 12324202, NSN 2540-01-200-5821. This is a total small business set-aside action under NAICS 333413. Eligibility is strictly limited to vendors with a fully executed BOAST Basic Ordering Agreement in place by the closing date. Per Amendment 002, the maximum option ceiling has been increased to 200 percent, allowing for a second option of 76 units within a 365-day period. The final proposal submission deadline is September 17, 2026, at 1600 hours EST. The award will be based on the Lowest Price Technically Acceptable method, with price as the sole evaluation factor. Delivery is required within 300 calendar days after receipt of order, with shipping terms as FOB Destination and inspection and acceptance occurring at the origin. The item is export-controlled, requiring vendors to be certified in the Joint Certification Program to access the Technical Data Package. Strict compliance is required for military packaging and preservation standards, specifically MIL-STD-2073-1D and Special Packaging Instruction AK12005821. Additionally, contractors must adhere to comprehensive security requirements, including NIST SP 800-171 for safeguarding covered defense information, OPSEC plan compliance, and mandatory Counterintelligence Awareness and Reporting training.
W6QK Acc- Dta

POSTED

2 days ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This contract specifies the procurement of five vaneaxial fans with National Stock Number 4140-00-554-8203 under solicitation SPE8E7-26-T-2682, with a delivery timeline of 334 days. The technical requirements are governed by modified provisions of MIL-F-18953B and incorporate numerous revisions to drawings, material specifications, and performance criteria. Key modifications include updating fan drawing numbers from 810-921784 to 803-921784 and 810-925368, revising coating sequences for castings and steel components to specify TT-P-645 primer and TT-V-119 phenolic varnish with precise dry film thickness ranges, and mandating corrosion-resistant 300-series stainless steel fasteners coated with zinc-rich anti-seize or ceramic coatings per MIL-C-81751. The contract also enforces strict QPL/QML compliance for components, prohibits intentional use of mercury except in designated applications with secondary containment, and requires adherence to MIL-STD-130N for identification marking of military property. Aerodynamic performance is tightly controlled, with flow rates restricted to within -2% to +5% of specified base curves on approved drawings, and stable operation is required throughout the defined pressure-volume range. Motor insulation must be Class F sealed with temperature rise not exceeding 55°C, and bearing requirements reference FF-B-171 (ABEC-1). Testing procedures are detailed with a strict sequence: balance, casing tightness, blade tip clearance, performance, noise, vibration, and high-impact shock, with retesting of performance after shock exposure and no repairs permitted between tests. Special provisions apply to fan types A, L, X-A, and X-L, with different qualification protocols based on size and configuration, and all testing must be conducted in the order specified unless prior test data approvals are granted. Packaging and handling follow DLA standards, with requirements for removal of government identification from non-accepted supplies, and all materials must comply with the DLA Master List of Technical and Quality Requirements referenced in RA001. The contract defines clear responsibilities for the offeror to supply only qualified components from approved QPL/QML sources, and the offeror’s submission constitutes agreement to these stringent standards. Performance testing includes comprehensive evaluations of noise, heat, speed, vibration

General Info

Five vaneaxial fans procured under strict MIL specs, with QPL/QML compliance, corrosion-resistant materials, and rigorous performance and testing protocols.

Agency

Department Of Defense → DDSP NEW CUMBERLAND FACILITYView Agency

NAICS

333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment ManufacturingView NAICS

Place of Performance

2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USA

Set-Aside

NONE

Documents

(1)

RFQ SPE8E7-26-T-2682 for DLA Troop Support Construction & Equipment

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Type Changed

Combined Synopsis → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → DDSP NEW CUMBERLAND FACILITY
Contacts1 person available
OfficeUSA
Organization / Agency
Department Of Defense → DDSP NEW CUMBERLAND FACILITY
View Agency Profile
Office AddressUSA

Full Description

Show more
FAN,VANEAXIAL
FAN, VANEAXIAL
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS
LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A
SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR
QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN
PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED
MANUFACTURERS LIST (QML)" APPLY.
RD002, COVERED DEFENSE INFORMATION APPLIES
MIL-STD-130N, 16 Nov 2012 IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST MEET QPL/QML REQUIREMENTS. BY SUBMITTING AN OFFER, THE OFFEROR AGREES TO PROVIDE QPL/QML COMPONENTS ONLY FROM SOURCES QUALIFIED ON THE APPLICABLE QPL(S)/QML(S).
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS; AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA. PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR MERCURY COMPOUND. (IAW NAVSEA 5100-003D). FOR NON-NUCLEAR APPLICATIONS 440 VAC, 60 HZ, 3 PH MIL-F-18953B REQUIREMENTS MODIFIED AS FOLLOWS; MIL-F-18953B(SH), DATED 22 OCTOBER 1990 SHALL BE MODIFIED AS FOLLOWS: PARA 2.1.1 (PAGE 2) CHANGE "TT-P-664 PRIMER COATING, ALKYD, CORROSION-INHIBITING, LEAD AND CHROMATE FREE, VOC COMPLIANT" TO READ "TT-P-645 PRIMER, PAINT, ZINC-MOLYBDATE, ALKYD TYPE." PARA 2.1.2 (PAGE 3) REVISE VANEAXIAL FAN DWG. "810-921784" TO READ "803-921784" AND DELETE "810-921984 PERFORMANCE CURVES, VANEAXIAL FANS." PARA 2.2 (PAGE 4) DELETE ASTM D 2092.
SPE8E7-26-T-2682
SECTION B
PARA 3.2, TABLE I (PAGE 5) UNDER "SAND
CASTINGS" AND COLUMN UNDER "REQUIREMENT" AFTER
"OR 713.0" ADD "; OR 356-T6."
PARA 3.2.1.1.A (PAGE 5) AFTER "ASTM B633, SC4"
DELETE REMAINDER OF SENTENCE AND SUBSTITUTE."
TYPE 2, FOLLOWED BY TWO (2) COATS (1 MIL MINIMUM
DRY FILM THICKNESS EACH) OF YELLOW PRIMER
CONFORMING TO TT-P-645 WITH THE COLOR NUMBER
BEING LEFT UP TO THE MANUFACTURER. ALL PARTS IN
CONTACT WITH AIR STREAM ARE TO BE GIVEN A FINAL
COAT (1 MIL MDFT) OF PHENOLIC VARNISH IN
ACCORDANCE WITH TT-V-119, TO SEAL PRIMER IN THE
AIR STREAM. TOTAL THICKNESS OF ALL COATS SHALL
BE BETWEEN 3 TO 4 MILS DRY FILM THICKNESS."
PARA 3.2.1.1.B (PAGE 5) AFTER "ASTM A 123"
INSERT "FOLLOWED BY TWO (2) COATS (1 MIL MDFT
EACH) OF YELLOW PRIMER CONFORMING TO TT-P-645
WITH THE COLOR NUMBER BEING LEFT UP TO THE
MANUFACTURER. ALL PARTS IN CONTACT WITH AIR
STREAM ARE TO BE GIVEN A FINAL COAT (1 MIL MDFT)
OF PHENOLIC VARNISH IN ACCORDANCE WITH TT-V-119,
TO SEAL PRIMER IN THE AIR STREAM. TOTAL
THICKNESS OF ALL COATS SHALL BE BETWEEN 3 TO 4
MILS DRY FILM THICKNESS."
PARA 3.2.1.1.C (PAGE 5) CHANGE THE PARAGRAPH
TO READ AS FOLLOWS: "ONE (1) COAT (2 TO 3 MILS
MDFT) OF EPOXY PRIMER CONFORMING TO MIL-P-24441,
FORMULA 150, FOLLOWED BY TWO (2) COATS (1 MIL
MDFT EACH) OF YELLOW PRIMER CONFORMING TO
TT-P-645 WITH THE COLOR NUMBER BEING LEFT UP TO
THE MANUFACTURER. ALL PARTS IN CONTACT WITH AIR
STREAM ARE TO BE GIVEN A FINAL COAT (1 MIL MDFT)
OF PHENOLIC VARNISH IN ACCORDANCE WITH TT-V-119,
TO SEAL PRIMER IN THE AIR STREAM. TOTAL
THICKNESS OF ALL COATS SHALL BE BETWEEN 5 TO 7
MILS DRY FILM THICKNESS."
PARA 3.2.1.1.D (PAGE 5) DELETE PARAGRAPH.
PARA 3.2.2.1 (PAGE 6) DELETE THE SECOND AND
THIRD SENTENCES AND SUBSTITUTE, "THE FASTENER
SHALL BE OF 300-SERIES CORROSION-RESISTANT STEEL
COATED WITH ZINC-RICH ANTI-SEIZE COMPOUND PRIOR
TO INSTALLATION. OTHERWISE, STEEL FASTENER WITH
CERAMIC COATING TO MIL-C-81751 SHALL BE USED."
PARA 3.2.3.2 (PAGE 6) LAST SENTENCE AFTER
"ASSEMBLY" ADD "TOTAL DRY FILM THICKNESS FOR
EACH COATING IS 2 TO 3 MILS. TOTAL OF ALL COATS
IS A NOMINAL 6 MILS DRY FILM THICKNESS."
PARA 3.3.2.2 (PAGE 7) LAST SENTENCE AFTER
"CASING" ADD "DIAMETER,".
PARA 3.3.2.6.4 (PAGE 9) CHANGE THE FOURTH
SENTENCE TO READ "FOR TYPE A AND X-A FANS, THE
OUTSIDE DIAMETER (OD) OF THE IMPELLER RIM SHALL
BE AT LEAST AS GREAT AS THE OD OF THE MOTOR
MOUNTING FLANGE. FOR TYPE L AND X-L FANS, THE OD
OF THE IMPELLER RIM SHALL BE NO GREATER THAN THE
OD OF THE MOTOR MOUNTING FLANGE."
PARA 3.3.2.7 TABLE III (PAGE 10) REVISE MIN.
FRAME COLUMN UNDER FAN TYPE L1 FROM "48" TO READ
"48/SPECIAL". UNDER COLUMN LOCK ROTOR CURRENT,
CHANGE "(56)1" TO READ "(48)1." UNDER FAN TYPES
"L1/2" AND "L1" AND COLUMN "MOTOR EFF.
(PERCENT)." DELETE "53" AND "46."
PARA 3.3.2.7.1.B (PAGE 11) AFTER "FOR SINGLE
PHASE POWER -" ADD "EITHER SPLIT PERMANENT
CAPACITOR OR."
PARA 3.3.2.7.1.D (PAGE 11) AFTER "INSULATION"
DELETE THE PARAGRAPH AND INSERT "CLASS F SEALED
INSULATION MOTOR TEMPERATURE RISE NOT TO
EXCEED 55 DEG C."
PARA 3.3.2.7.2 (PAGE 11) A. IN THE FIRST
SPE8E7-26-T-2682
SECTION B
SENTENCE, AFTER "BALL BEARINGS CONFORMING TO"
INSERT "FF-B-171 (ABEC-1) AS SPECIFIED IN
6.2.H." B. PARAGRAPH E. AFTER "25 DEG C" ADD
"FOR NUCLEAR APPLICATIONS, OR 35 DEG C FOR
NON-NUCLEAR APPLICATIONS,".
PARA 3.3.2.7.3 (PAGE 12) INSERT BETWEEN THE
THIRD AND FOURTH SENTENCES THE FOLLOWING:
"FRACTIONAL HORSEPOWER MOTORS DO NOT NEED TO
HAVE THE ROTOR TACK WELDED TO THE SHAFT IF THE
INTERFERENCE FIT BETWEEN THE ROTOR AND SHAFT IS
A MINIMUM OF .0008 INCH." DELETE "OD" IN THE
FOURTH SENTENCE AND INSERT "OUTER DIAMETER."
PARA 3.3.2.7.6 (PAGE 12) DELETE SECOND AND
THIRD SENTENCES AND ADD "FOR DRAINAGE IN THE
HORIZONTAL POSITION, APPLICABLE TO INTEGRAL AND
FRACTIONAL FRAME MOTORS, FOUR DRAINS IN ONE END
OF THE FRAME OR ON THE PERIPHERY IN ONE BRACKET
SHALL BE SPACED 90 DEGREES APART PLUS (+) OR
MINUS (-) 20 DEGREES USING THE CONDUIT
CENTERLINE OR STUFFING TUBE CONNECTION AS A
REFERENCE POINT.
PARA 3.3.3.1 (PAGE 13) REVISE TO READ AS
FOLLOWS: "3.3.3.1 AERODYNAMIC PERFORMANCE. THE
DESIGN POINT FOR EACH SIZE VANEAXIAL FAN SHALL
BE THE VOLUME-PRESSURE POINT AS SPECIFIED IN
TABLE IV. THE VOLUME SHALL BE THE VOLUME AT THE
FAN INLET AND THE PRESSURE SHALL BE THE TOTAL
PRESSURE (PT) IN THE WATER GAUGE (WG) AT THE FAN
DISCHARGE. THE VOLUMETRIC FLOW RATE SHALL NOT
EXCEED A RANGE OF -2% TO +5% OF THE APPLICABLE
BASE CURVE ON DRAWING 803-921784 AS MEASURED ON
A SYSTEM LINE. THE UPPER AND LOWER BOUNDS OF
THIS STABLE OPERATION REGION ARE AS INDICATED IN
FIGURE 1. THROUGHOUT THIS REGION, THE FAN SHALL
EXHIBIT STABLE OPERATION."
PARA 3.3.3.3.4 (PAGE 14) IN THIRD SENTENCE
DELETE "DRAWING 810-921784" AND ADD "DRAWING
803-921784."
PARA 3.3.4.1 (PAGE 16) CHANGE THE THIRD
SENTENCE TO READ "THE TP SHALL RISE CONTINUALLY
FROM FREE DELIVERY THROUGH THE DESIGN POINT TO
85% OF THE DESIGN VOLUME AS SPECIFIED IN TABLE
VI. REVISE DWG. NO. "803-921784" TO READ
"810-925368." AFTER LAST SENTENCE ADD "SEE
FIGURE 1."
PARA 3.6.1 (PAGE 19) UNDER "SYMBOL SEQUENCE 5
(LETTER)" AND COLUMN UNDER "MEANING" DELETE
"SUBMERSIBLE 15 FOOT" AND ADD "WATERTIGHT."
MIL-F-18953B QA PROVISIONS MODIFIED AS FOLLOWS:
MIL-F-18953B(SH), DATED 22 OCTOBER 1990 SHALL BE
MODIFIED AS FOLLOWS:
PARA 4.3.1 (PAGE 21) SAMPLES FOR
QUALIFICATION: CHANGE THIS PARAGRAPH TO READ AS
FOLLOWS "QUALIFICATION TESTS FOR TYPE A
FAN-MOTOR UNITS SHALL BE CONDUCTED AS FOLLOWS:
(1) A30, A28, A17, A8, A3-1/2, A2-1/2 OR A2 AND
A1/2 FOR SHOCK AND VIBRATION TESTS; (2) ALL
SIZES FOR BALANCE, PERFORMANCE, NOISE, HEAT, AND
SPEED TESTS; AND (3) CASING TIGHTNESS TEST IS
REQUIRED ONLY WHEN SPECIFIED IN CONTRACT OR
ORDER. PASSING QUALIFICATION TESTS FOR TYPE A
FAN-MOTOR UNITS WILL INCLUDE QUALIFICATION OF
ALL SIZES FOR TYPES L, X-A AND X-L FAN-MOTOR
UNITS. QUALIFICATION OF TYPES L AND X-L
FAN-MOTOR UNITS SUBMITTED WILL INCLUDE
QUALIFICATION FOR ONLY THESE TYPES AND SHALL BE
CONDUCTED AS FOLLOWS: (1) L3 AND L1 FOR SHOCK
AND VIBRATION TESTS; AND (2) EITHER ALL L SIZES
OR X-L SIZES FOR BALANCE, PERFORMANCE, NOISE,
HEAT AND SPEED TESTS. QUALIFICATION OF TYPE X-A
SPE8E7-26-T-2682
SECTION B
FAN-MOTOR UNITS SUBMITTED WILL INCLUDE
QUALIFICATION FOR THIS TYPE ONLY AND SHALL BE
CONDUCTED AS SPECIFIED AS TYPE A FAN-MOTOR
UNITS, EXCEPT FOR SHOCK TEST REQUIREMENT."
TABLE VII. TEST AGENDA (PAGE 21): (1) IN COLUMN
"TEST" CHANGE "CASING LIGHTNESS" TO READ "CASING
TIGHTNESS; (2) IN COLUMN "QUALIFICATION", ROW
"VIBRATION" CHANGE "A,L" TO READ "ALL"; ROW
"CASING TIGHTNESS" ADD "A, X-A4"; AND ROW
"SPEED" ADD "ALL"; AND (3) ON NOTE 1: CHANGE
"INDICATED" TO READ "AS SPECIFIED IN 4.3.1."
PARA 4.4. TYPE TESTS (PAGE 22): (1) IN SECOND
SENTENCE DELETE "PRIOR TO PRODUCTION"; (2) AFTER
"BY NAVSEA" ADD "(SEE 6.2.I)"; (3) CHANGE "A
SIMILAR UNIT" TO READ "A UNIT HAVING GREATER OR
EQUAL HORSEPOWER AND FAN-MOTOR WEIGHT" AND (4)
CHANGE "OF SIMILAR CONSTRUCTION" TO READ "A UNIT
HAVING GREATER OR EQUAL HORSEPOWER AND FAN-MOTOR
WEIGHT."
PARA 4.5 PERIODIC TESTS (PAGE 22): CHANGE "A
SIMILAR UNIT" TO READ "A UNIT HAVING GREATER OR
EQUAL HORSEPOWER AND FAN-MOTOR WEIGHT."
PARA 4.8.1 HIGH-IMPACT-SHOCK (PAGE 22): DELETE
"THE HIGH-IMPACT SHOCK ... AND VIBRATION
REQUIREMENTS." AND INSERT "THE HIGH-IMPACT SHOCK
TEST SHALL MEET THE REQUIREMENTS SPECIFIED IN
4.10."
PARA 4.8.2 VIBRATION TEST (PAGE 24): DELETE "THE
EXPLORATORY VIBRATION TEST ... PRIOR TO THESE
TESTS." AND INSERT "THE EXPLORATORY VIBRATION
TEST SPECIFIED IN MIL-STD-167-1 SHALL INCLUDE
FREQUENCIES FROM 4 HZ UP TO AND INCLUDING 33 HZ
AT THE TABLE AMPLITUDE SPECIFIED THEREIN. THE
VIBRATION TEST SHALL MEET THE REQUIREMENTS
SPECIFIED IN 4.10."
ADD PARA 4.10 TEST SCHEDULE AS FOLLOWS: "4.10
TEST SCHEDULE. THE TESTING FOR THE FAN SHALL BE
PERFORMED IN THE FOLLOWING ORDER UNLESS
EXTENSIONS FROM PREVIOUS TEST RESULTS HAVE BEEN
APPROVED:
A. BALANCE (4.8.3)
B. CASING TIGHTNESS (4.8.8)
C. BLADE TIP CLEARANCE MEASUREMENT (4.9)
D. PERFORMANCE (4.8.4), STALL AND RECOVERY
(4.8.4.1), SPEED (4.8.9) AND HEAT (4.8.6).THESE
TESTS SHALL BE CONDUCTED CONCURRENTLY.
E. NOISE (4.8.5)
F. VIBRATION TEST (4.8.2). THE CORRECTION OF
DAMAGE, WHICH MAY HAVE OCCURRED DURING THE
VIBRATION TEST, SHALL NOT BE PERFORMED PRIOR TO
TEST SPECIFIED IN 4.8.1.
G. HIGH-IMPACT SHOCK (4.8.1). AFTER CONDUCTING
THE HIGH-IMPACT SHOCK TEST, TESTS SPECIFIED IN
4.8.4 AND 4.8.4.1 SHALL BE AGAIN CONDUCTED
WITHOUT CORRECTION OF DAMAGES WHICH MAY HAVE
OCCURRED DURING THE SHOCK TEST. DATA FOR TESTS
SPECIFIED IN 4.8.4 AND 4.8.4.1, ONE BEFORE AND
ONE AFTER THE HIGH-IMPACT SHOCK TEST SHALL BE
SUBMITTED FOR NSN/Part Number: 4140-00-554-8203 Quantity: 5 EA Purchase Request: 7016769389QTY: 5 Delivery: 334 days ADO

More opportunities from Department Of Defense → DDSP NEW CUMBERLAND FACILITY

Same awarding agency

NAICS: 335931
New
DIBBS
POWER SUPPLY
Solicitation # SPE7L7-26-T-4330
The contract entails the procurement of eight power supply units identified by NSN 6130-01-553-7134 and part number LT-3103-4 under solicitation SPE7L7-26-T-4330, issued as a Service-Disabled Veteran-Owned Small Business Set Aside with a NAICS code of 335931. Delivery is required within 57 days after order placement to the DDSP New Cumberland Facility in Pennsylvania, with FOB Origin terms mandating that pricing includes transportation to a contiguous U.S. destination selected by the offeror. The unit of issue is each (EA), with zero variance allowed in quantity, and inspection and acceptance occur at the destination. Packaging must comply with ASTM D3951 and MIL-STD-129 for marking and labeling, though the DLA Master List of Technical and Quality Requirements supersedes any conflicting ASTM requirements. Palletization must conform to DLA's RP001 guidelines, and all items must be prepared for shipment using the specified parcel post address. The contract includes mandatory cybersecurity compliance via CMMC Level 2 self-assessment and adherence to NIST SP 800-171 requirements for safeguarding covered defense information, with flow-down obligations to subcontractors. Hazardous materials require labeling consistent with OSHA’s Hazard Communication Standard and MIL-STD-129, while items containing radioactive materials above specified thresholds must be marked in accordance with the same standard. Quality assurance protocols mandate sampling under MIL-STD-1916 or an equivalent zero-based plan, with critical, major, and minor attributes assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 respectively. No pricing information is provided within the solicitation, and the contract value remains unestablished; however, payment will be processed exclusively through WAWF using required documentation such as invoices and receiving reports. Offerors must hold a valid Unique Entity Identifier and CAGE code, certify their SDVOSB status, and comply with all representations and certifications regarding socioeconomic eligibility, employee eligibility verification, trafficking in persons, sustainable products, and whistleblower protections. The contract prohibits the use of covered telecommunications equipment from designated foreign adversaries, restricts compensation of former DoD officials to prevent organizational conflicts of interest, and requires timely reporting of cyber incidents. All proposals must be submitted electronically via DIBBS by the stated response deadline
Current-Carrying Wiring Device Manufacturing

POSTED

about 15 hours ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS