Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on April 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FDC-015-103795.1

Closed
46650State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 9 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

This contract involves the provision and installation of three prefabricated vault toilet restrooms at separate ATV trailhead parking areas within Susquehannock State Forest, located across Sweden, Summit, and Stewardson Townships in Potter County, Pennsylvania. The scope includes obtaining the necessary Pennsylvania Labor & Industry Building Permits for each restroom installation, ensuring compliance with local regulatory requirements. The project specifically targets small businesses certified under the Department of General Services (DGS) Small Business Certification program. The contract, issued by the Commonwealth of Pennsylvania's Department of Conservation and Natural Resources, has a substantial budget estimate ranging from $100,000 to $500,000. The solicitation was posted in mid-April 2026, with a response deadline set for mid-May 2026. The work is categorized under a state and local government entity (SLED) procurement, and the installation sites are situated within Pennsylvania, emphasizing the state's commitment to improving facilities for outdoor recreation and enhancing the infrastructure supporting ATV trail users in the forest.

General Info

Supply and install three prefabricated vault toilets at ATV trailheads in Susquehannock State Forest.

Documents

4

FDC-015-103795.1 General Specifications for Three Vault Toilet Restrooms

PDF, High priority: read this firstspecifications
High

General Conditions for Construction 2022 Edition - Pennsylvania DCNR

PDF, High priority: read this first97 pages · general-conditions
High

FDC-015-103795.1 Anti-Collusion Affidavit

PDF, Low priorityaffidavit
Low

FDC-015-103795 Three Vault Toilet Restrooms Drawings

PDF, Low prioritydrawings
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCommonwealth of Pennsylvania - Department of Conservation and Natural Resources
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Three Vault Toilet Restrooms Susquehannock State Forest Sweden, Summit & Stewardson Townships, Potter County, Pennsylvania.
Provide & install prefabricated vault toilet restrooms and acquire Pennsylvania Labor & Industry Building Permits for three prefabricated vault toilet restrooms at three separate ATV trailhead parking areas in Susquehannock State Forest.
DGS Small Business Certification Required
Engineer's Estimate: $100,000-$500,000

More opportunities from Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

Same awarding agency

NAICS: 237110
SLED
FDC-305-100166.1
Solicitation # FDC-305-100166.1
Solicitation FDC-305-100166.1 is a lump sum contract issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources for the rehabilitation of the sewage treatment plant at Cowans Gap State Park in Todd Township, Fulton County. The project scope encompasses general construction and electrical work, including the construction of a headworks structure, repair and maintenance of the clarifier tank, replacement of blower electric motors, treatment pond evacuation and re-lining, and chlorination tank improvements. Electrical requirements include wiring and panel installation for aeration equipment, a blower control timer, and an influent screw screen. Key deliverables include the installation of a stainless steel tablet chlorinator with a 280 GPM flow capacity and the submission of record drawings prior to substantial completion. The contract is estimated to exceed 1 million dollars and will be awarded to the lowest responsible and qualified bidder. Bidders must meet specific socioeconomic goals, including a 20 percent Small Diverse Business and a 3 percent Veteran Business Enterprise participation target. Required financial securities include a bid guaranty, 100 percent performance and payment bonds, and a 50 percent maintenance bond. All work must comply with the PA DEP Water Quality Management Permit and the National Electrical Code. Payments are processed via Automated Clearing House, and contractors must provide a detailed breakdown of their lump sum bid and a utilization report with each application for payment.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS