This Solicitation opportunity from Department Of Defense was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fiber Optic Cable B230 to B9511

Closed
FA302226Q0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract requires the engineer, furnish, install, and test of approximately 3,100 feet of 12-strand single mode fiber optic cable from Infrastructure Transfer Building 230 to Building 9511 at Columbus Air Force Base, Mississippi, with termination points in a new 12-port Fiber Optic Distribution Panel at each location. All materials must be new and not refurbished, and installation must comply with TIA-606-B, TIA-758-B, RUS 7 CFR 1755.900, and TIA-526-7 standards, including bi-directional testing at 1310 nm and 1550 nm using OTDR and Optical Power Meter methods. Cable labeling must be permanent, corrosion-resistant, and visible, with tags placed at all vaults, pull boxes, entrance terminals, and maintenance holes, identifying cable count, number, type, and size. The contractor must provide reel test results prior to installation and submit a final test report within 10 business days after government witness testing, followed by a formal acceptance process per AFTO 747, including a scheduled walk-through five days prior to acceptance. Performance must be completed within 120 days of contract award, with work typically restricted to normal duty hours unless mission-critical interruptions necessitate nights or weekends. The acquisition is a total small business set-aside under NAICS code 238210, evaluated on a lowest price technically acceptable basis, with offerors required to submit a ten-page technical volume in PDF format with both redacted and unredacted copies. Compliance with CUI safeguarding requirements, including training and form submission, is mandatory, along with adherence to base access procedures, security protocols, and OSHA 29 CFR 1910.146 for confined spaces. Contractors must provide personnel identification details, vehicle documentation for base access, and ensure all government-provided laydown areas are restored to original condition. Invoicing must be submitted electronically through WAWF, and all activities are subject to federal, state, and Air Force safety and security regulations. A mandatory site visit occurred on June 2, 2026, and proposals were due by June 16, 2026.

General Info

Install and test 3,100 feet fiber optic cable at Columbus AFB, mandatory site visit May 25.

Agency

Department Of Defense → FA3022 14 Cons LgcaView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

MS, 39710, USA

Set-Aside

SBA

Documents

(12)

DAFFARS Clauses Attachment 4

PDFcontract-document

Attachment 3 - Provisions and Clauses

PDFclauses

Safeguarding Controlled Unclassified Information (CUI) Acknowledgment Memorandum

PDFspecial-notice

SOW Fiber Installation ITB 230 to B9511 Columbus AFB

PDFsow

Amendment 0003 to Solicitation FA302226Q0009

PDFamendment

Contractors+CUI+Training+Slides+1+%28002%29++-++Read-Only.pptx

PPTX

Solicitation FA302226Q0009 Fiber Optic Cable Installation Columbus AFB

PDFrfq

SOW Fiber Installation ITB 230 to B9511 Columbus AFB

PDFsow

FA302226Q0009 Fiber Installation Q&A

PDFq-and-a

Amendment 0001 to Solicitation FA302226Q0009

PDFamendment

Wage Determination No. 2015-5157 Revision 29 for Mississippi

PDFwage-determination

Amendment 0002 to Solicitation FA302226Q0009

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3022 14 Cons Lgca
Contacts2 people available
OfficeCOLUMBUS, MS, 39710-0001, USA
Organization / Agency
Department Of Defense → FA3022 14 Cons Lgca
View Agency Profile
Office AddressCOLUMBUS, MS, 39710-0001, USA

Full Description

Show more

Engineer, furnish, install and test (EFI&T) 12-strand single mode (SM) fiber optic cables (FOC) from Infrastructure Transfer Building (ITB) 230 to Building (B) 9511 at Columbus AFB, MS.


The Contractor shall install approximately 3,100 feet (maintenance loop included) of 12-strand SM FOC from ITB 230 to B9511.  Terminate 12 strand SM FOC in the new 12-port FODP in ITB 230, and outdoor FODP in B9511.


A site visit will be held on 2 June, 2026 at 10:00 AM CST. Vendors shall meet at the Main Gate Visitors Center, 108 Simler Blvd, Columbus AFB, MS, 39710. Vendors will then walk/drive to the actual site of contract performance. Vendors are encouraged to inspect the site in order to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance to the extent that information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Those wishing to participate in the site visit shall provide all information specified in the attached Base Access Procedures. Site visit attendees shall respond no later than 28 May, 2026 at 2:00 PM CST.


Once you have reviewed the CUI Training slides, sign the CUI Safeguard document and return to both 2d Lt. Jackson Basil and TSgt Micah-James Carley. Once you have completed these items, you may request the EAL.


Amendment 0003 issued 4 June 2026. SOW drawing page added. Q&A date and quote due date amended.


June 11, 2026 Q&A attachment posted.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS