Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 21, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fiber Optic Cable

Closed
W91QVN20R0181Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price solicitation, number F3YCFA6173AC01, is a 100 percent Small Business set-aside under NAICS 335921 for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting Radar Approach Control to several critical facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The installation will utilize a combination of existing manhole and handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, labor, and supervision, as no government-furnished equipment will be provided. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, evaluated based on design, a quality control plan, and performance history via the Supplier Performance Risk System. Technical teams must be certified to EFI&T TC Comm FOTS, and supervisors must hold factory certification from equipment manufacturers. All work must comply with strict environmental guidelines regarding hazardous materials and lead-based paint, and personnel must adhere to Department of the Air Force security and base access protocols. Final acceptance is contingent upon successful OTDR and Optical Power Meter testing in accordance with TIA 526-7 and a final project walk-through.
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 335921
New
DIBBS
CABLE ASSEMBLY, FIBE
Solicitation # SPE7M1-27-T-0166
Solicitation SPE7M1-27-T-0166 is a fixed-price request for quotations issued by the DLA Weapons Support Maritime Supply Chain for the procurement of three fiber optic cable assemblies. The required items are identified as Scientific Research Corporation part number N513-128-30 with NSN 6020017266731. The need ship date and original required delivery date are both set for May 31, 2027, with a delivery lead time of 226 days. Inspection and acceptance will occur at the destination, and the items are to be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Specific fiber optic packaging requirements include the use of Method 10-Physical Protection, a non-injurious cleaning and drying process, and the use of neutral wraps on cable ends. Cables must be supplied on spools or reels with a minimum 6-inch diameter or in secured coils of at least 6 inches in diameter, placed in close-fitting boxes conforming to PPP-B-566, PPP-B-676, or ASTM-D5118. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Offerors must comply with the Buy American Act, the Berry Amendment, and various FAR and DFARS clauses regarding cybersecurity, trafficking in persons, and hazardous material labeling. Quotations were due by October 16, 2026, via the DLA Internet Bid Board System.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

4 days ago

DEADLINE

in 1 day

General Info

NAICS

335921 - Fiber Optic Cable Manufacturing

Place of Performance

AP

Set-Aside

NONE

Documents

6

W91QVN20R0181 Amendment 0001

PDF, High priority: read this firstamendment
High

01+SOLICITATION.pdf

PDF

02+Material+Description+Lists_REVISED_0827.pdf

PDF

02+Material+Description+Lists_REVISED.xlsx

XLSX

02+Material+Description+Lists.xlsx

XLSX

20R0181_FINAL.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Aug 19, 2020 to Aug 21, 2020. The notice description changed.

Notice updated

Response deadline changed from Aug 21, 2020 to Aug 31, 2020. The notice description changed.

Notice updated

Response deadline changed from Aug 31, 2020 to Sep 2, 2020. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → 0411 Aq Hq Contract Augmented
Contacts2 people available
OfficeAPO, AP, 96271-5289, USA
Office AddressAPO, AP, 96271-5289, USA

Full Description

Show more
The solicitation was uploaded. File Name_20R0181_FINAL _____________________________________________________________________________________________ Amendment 01_C The purpose of this amendment is to: 1. Provide responses/answers to questions received 2. The description for CLIN 0001 thru 0007 w as updated and reference in Revised Material Lists. 3. The closing date w as extended to 2 September 2020 at 1300 hrs (Korea Time) 4. All other terms and condition of this solicitation remains the same. Attachments 01 Amendment01C_20R0181 02 Material Description Lists_REVISED_0827 ________________________________________________________________________________________________ Amendment 01_B The purpose of this amendment is to: 1. The closing date was extended to 31 August 2020 at 1300 hours (Korean Time) 2. The answers against questions for this solicitation will be provided and the amendment, SF30 will be issued. 3. All other terms and condition of this solicitation remain the same. ____________________________________________________________________________________________ Amendment 01: The Purpose of this Amendment is to: 1. Provide responses/answers to questions received about the unit of issue for Item 0006 thru 0010. See 02 Material Description Lists_REVISED. 2. The due date was extended to 21 Aug at 1300 hrs (Korean Standard Time) 3. All other terms and condition of this solicitation remains the same. Note: The amendment will be uploaded. _________________________________________________________________________________________________ Title: Fiber Optic Cable Electronic quotation must be submitted by 1:00PM (Korean Standard Time) within the specified date in the solicitation at E-mail at namsun.kim3.ln@mail.mil. Please note the following attachments uploaded. 01 Solicitation 02 Material Description Lists

More opportunities from Department Of Defense → 0411 Aq Hq Contract Augmented

Same awarding agency

NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
This firm-fixed price non-personnel services contract, solicitation number W91QVN26QXXXX, provides communication tower and facility maintenance for the 41st Signal Battalion C4I mission support in South Korea. The scope of work includes physical and visual inspections of metal surfaces for structural integrity, maintenance of bonding, grounding, and lightning protection systems, LED replacement for beacon and side marker lights, and interior and exterior repairs for C4I communication shelters. Performance is required across multiple sites, including Papyongsan, Yongsan TCF, Osan Bucket, Highpoint, and CP Walker AFN FM. The base period of performance is 12 months from the date of award, with funding provided by the Republic of Korea Ministry of National Defense (ROK MND). Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price that is technically acceptable. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and compliance with the Performance Work Statement. All price proposals must be submitted in Korean Won. The contractor must provide key personnel, including an Information and Communication Engineer and a CQCSM/Safety Manager with specific education and experience requirements. Mandatory qualifications include an Information and Communication Construction License and an Electrical Construction License. The contractor is also required to adhere to strict security protocols, including AT/OPSEC compliance for foreign performance and the safeguarding of Controlled Unclassified Information.
Power and Communication Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 561720
Federal
Department of War Education Activity (DoWEA) Pacific West Region, in Camp Humphreys, Osan AB and Daegu
Solicitation # W91QVN27RA004
Solicitation W91QVN27RA004 is a small business set-aside for a firm fixed price contract to provide comprehensive custodial services for the Department of War Education Activity Pacific West Region in South Korea. The scope of work covers nine schools and one headquarters building located at Camp Humphreys, Osan Air Base, and USAG Daegu. Services are divided into two operational schedules: Schedule I for the approximately nine months schools are in session and Schedule II for summer, spring, and winter breaks, as well as federal holidays. The contractor is responsible for all personnel, equipment, and supplies to perform routine janitorial services for classrooms, offices, and outdoor areas, as well as unscheduled requests such as carpet shampooing and mold remediation. Award will be based on the Best Value to the Government, evaluating technical capability, past performance, and price. Mandatory requirements for offerors include a minimum of two years of experience as a prime contractor managing facilities of at least 1.1 million square feet and a valid Hygiene Management Permission license issued by the Republic of Korea government. Key personnel must demonstrate English proficiency via TOEIC scores. Proposals must be submitted via the PIEE Solicitation Module in three separate volumes: Technical Capability, Past Performance, and Price. Performance is monitored through a Quality Assurance Surveillance Plan, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
Janitorial Services

POSTED

12 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS