Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Fiber Optic Cable Supply (48F, 72F, 24F)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W7NE Uspfo Activity Maang 102View Agency

NAICS

335921 - Fiber Optic Cable ManufacturingView NAICS

Place of Performance

Gulfport, MS, 39507, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NE Uspfo Activity Maang 102
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W7NE Uspfo Activity Maang 102
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of single-mode fiber optic cables (MiniXtend® with SMF-28® Ultra, G.652.D/G.657.A1, OS2) in 48F, 72F, and 24F configurations.

Similar Contracts

Same NAICS industry code

NAICS: 335921
New
DIBBS
CABLE ASSEMBLY, FIBEThe contract is for the supply of one unit of a fiber optic cable assembly identified by NSN 6020-01-699-6772 and part number 617-819133-000, under solicitation SPE7M1-26-T-234E. Delivery is required within 20 days of contract award to Camp Pendleton, California, with FOB origin terms and zero variance allowed in quantity. The item must be packaged in strict accordance with MIL-STD-2073-1E and marked per MIL-STD-129, including physical protection packaging Method 10, cleaning and drying procedures that do not damage the cable, and end protection using a neutral wrap extending at least four inches. Cables must be supplied on spools or reels with a minimum six-inch diameter, or if too short, coiled with a minimum six-inch center diameter and secured at three points. The coil must be placed in a close-fitting box meeting PPP-B-566, PPP-B-676, or ASTM-D5118 standards with adequate cushioning and proper closure. All packaging must be labeled as specified, and shipment must be sent via traceable freight, explicitly prohibiting parcel post. The delivery address and freight point of contact are clearly defined, with a required delivery date of July 22, 2026. Technical and quality requirements referenced via R and I numbers are controlled by the DLA Master List as of the solicitation issue date, and the contractor must comply with all DLA packaging directives, including palletization standards. The contract identifies Michael Reese as the primary point of contact with contact details provided for inquiries.
MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 335921
New
DIBBS
CABLE ASSEMBLY, FIBEThis contract pertains to the procurement of a fiber optic cable assembly identified by NSN 6020-01-530-8042 and part numbers 13623136-4 and 950-0430-4, with a total quantity of nine units to be delivered under solicitation SPE7M1-26-T-234D. The item must meet stringent technical and quality standards referenced from the DLA Master List of Technical and Quality Requirements, with packaging and marking strictly governed by MIL-STD-2073-1E and MIL-STD-129, including Method 10 physical protection, end caps secured with neutral wrap, and spooling or coiling requirements to prevent damage. Each unit must be packaged in accordance with specified box standards, cushioned appropriately, and labeled with exact marking protocols, including the use of Item Unique Identification (IUID) per MIL-STD-130 and DFARS 252.211-7003. The contractor is also required to maintain Cybersecurity Maturity Model Certification (CMMC) Level 2 self-assessment compliance and adhere to DLA packaging and government identification removal policies. Delivery is scheduled FOB origin with a 164-day lead time, and the final delivery must be completed by January 21, 2027, with no tolerance for variance in quantity. The delivery destination is the DLA Distribution San Joaquin warehouse in Tracy, California, and all transport logistics must follow DLAD Procurement Notes C19 and C20. The contract price is $9.00 per unit, totaling $81.00, and the solicitation was issued on July 27, 2026, with responses due by August 7, 2026. The item falls under NAICS code 335921 and is procured by the Department of Defense through the Maritime Supply Chain, with Michael Reese listed as the primary point of contact.
MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 335921
New
DIBBS
Fiber Optic Cable Assembly ManufacturingThe contract calls for the manufacture and delivery of two units of a fiber optic cable assembly identified by NSN 6020-01-699-1071, with strict adherence to Department of Defense technical and quality standards established by the Defense Logistics Agency. The work is to be performed under a subcontract arrangement, with the place of performance specified as Tracy, California, 95304-5000, and must meet all applicable performance and compliance requirements set forth by the contracting agency. The solicitation was posted on July 24, 2026, and responses are due by July 29, 2026, with the North American Industry Classification System code 335921 indicating the industrial category for fiber optic cable manufacturing. The contracting organization is the Maritime Supply Chain under the Department of Defense, and the procurement is focused on securing a specialized component critical to defense communications infrastructure. While no set-aside designation or specific point of contact is provided, the contract requires full compliance with DLA specifications and is likely intended for a qualified supplier with proven experience in high-reliability fiber optic assemblies. The online solicitation link indicates that formal submission and documentation must be processed through the DIBBS system, and timely response within the five-day window is essential for consideration.
MARITIME SUPPLY CHAIN

POSTED

4 days ago

DEADLINE

in about 24 hours
View Details
NAICS: 335921
New
DIBBS
REPAIR KIT, FIBER OPThe contract pertains to the procurement of 44 units of a Fiber Optic Repair Kit, identified by NSN 6080015276964 and part number 0831-9010 from KITCO Fiber Optics Inc, under solicitation SPE7M1-26-T-208J issued by the Department of Defense’s Defense Logistics Agency through its Maritime Supply Chain office. The delivery is required within 66 days after order issuance, with a firm delivery date of July 21, 2026, and FOB Origin terms apply. All items must be packaged in strict compliance with MIL-STD-2073-1E, Appendix D, for kits, utilizing a unit pack code U, with preservation methods designated as ZZ under cold and dry conditions, and no chemical preservation materials. Marking and labeling must adhere to MIL-STD-129, including mandatory 2-D Data Matrix barcodes on all container levels, with special marking code ZZ indicating additional contract-specific requirements. Inspection and acceptance occur at the destination warehouse located in Tracy, California, with the government retaining full authority over these processes. The contract incorporates a comprehensive set of FAR and DFARS clauses covering cybersecurity safeguards, hazardous material handling, trafficking in persons, equal opportunity, employment verification, sustainable products, whistleblower protections, and restrictions on procurement from communist Chinese military companies. Compliance with NIST SP 800-171 for safeguarding controlled defense information is mandatory, and contractors must implement cyber incident reporting procedures under DFARS 252.204-7012. The packaging and preservation environment must support long-term storage integrity without degradation. Invoicing must occur electronically through Wide Area WorkFlow, and the contractor must provide full representation of small business status, UEI, and CAGE codes as required. All hazardous materials require prior submission of Safety Data Sheets compliant with OSHA’s Hazard Communication Standard, and any radioactive components must be disclosed in writing prior to delivery. The contract does not include options or indefinite delivery terms, and no key personnel or organizational conflict of interest provisions are specified. Payment will be processed under fixed-price terms with no cost-type line items, and pricing reflects a unit cost of $44.00, though the total contract value remains unconfirmed due to incomplete pricing data in the clause structure.
MARITIME SUPPLY CHAIN

POSTED

4 days ago

DEADLINE

in about 24 hours
View Details
NAICS: 335921
New
DIBBS
CABLE ASSEMBLY, FIBEThe contract pertains to the procurement of a fiber optic cable assembly identified by NSN 6020-01-542-8331 and part number FODST-SC-01, with a quantity of 32 units priced at $32.00 each for a total of $1,024.00. Delivery is required within 168 days from the contract date, with shipment FOB origin, and the final delivery point is the DLA Distribution facility in New Cumberland, Pennsylvania. The item must be packaged in strict compliance with MIL-STD-2073-1E, using Method 10 for physical protection, and marked according to MIL-STD-129. Cable ends must be covered with a neutral wrap extending at least four inches and secured with tape. The cable must be supplied on spools or reels with a minimum six-inch diameter unless the length is too short, in which case it must be coiled with a minimum six-inch center diameter and secured at three equally spaced points within a box meeting PPP-B-566, PPP-B-676, or ASTM-D5118 standards with proper cushioning and closure. The contract mandates adherence to DLA’s Master List of Technical and Quality Requirements referenced by R and I numbers, and prohibits the intentional addition of mercury or mercury-containing compounds to the item, except for specific functional uses in batteries, fluorescent lamps, sensors, weapon systems, or chemical reagents authorized by NAVSEA, with portable mercury-containing devices requiring shockproof design and a secondary containment boundary per NAVSEA 5100-003D. The contractor must complete a Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-Assessment and comply with all applicable defense packaging and marking standards. The solicitation number is SPE7M1-26-T-228G, with a response deadline of August 3, 2026, and the original required delivery date is December 19, 2026, though the ship date is set for January 19, 2027. No variance in quantity is permitted, inspection and acceptance occur at destination, and freight shipping instructions follow DLAD Proc Note C19 and C20.
MARITIME SUPPLY CHAIN

POSTED

5 days ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of Defense → W7NE Uspfo Activity Maang 102

Same awarding agency

NAICS: 335929
New
Federal
Copper Cable and Accessories for South Carolina (PSTE)This procurement is a presolicitation notice for a Total Small Business Set-Aside under FAR 19.5, targeting qualified small business sources to supply a bundled kit of copper communication cables and accessories for delivery to Eastover, South Carolina. The requirement is structured around commercial items acquired under FAR 12.201-1(c)(2), with brand-name or equal products mandated for all components listed in the attachments, including 2-pin connector cables, LCD monitors with part number VG-110-30-C, and headphone jacks from Audio-Technica or JBL. The award will be determined through a trade-off approach considering price and other factors, primarily delivery date, with technical capability and past performance also evaluated, making it distinct from a Lowest Price Technically Acceptable process. The anticipated award date is September 2, 2026, with responses due by August 10, 2026, and the government will inspect and accept the completed kit at the specified shipping address. No formal contract clauses, packaging or marking requirements, inspection standards beyond brand-name compliance, or payment and invoicing details are provided in this presolicitation, as these will be detailed in the subsequent solicitation. The contracting office is located at OTIS ANGB, Massachusetts, but the performance and delivery point is clearly defined as Building 258 at 1325 S Carolina Road, Eastover, South Carolina, with point of contact information provided for inquiries regarding the procurement.
Other Communication and Energy Wire Manufacturing

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 335929
New
Federal
Other Communication and Energy Wire Manufacturing for Wisconsin (YAQF)The solicitation W50S8026Q0027 is a presolicitation notice issued by the 102IW Contracting Office under the Department of Defense for a Total Small Business Set-Aside pursuant to FAR 19.5, targeting qualified small business vendors for the supply of a comprehensive fiber optic communications kit. The requirement encompasses a detailed list of 47 physical materials including loose-tube single-mode OS2 fiber optic cable, PVC conduits, splice closures, termination hardware, cabling accessories, sealing compounds, marking tapes, and test kits, all specified as brand name or equal to ensure compatibility and performance standards aligned with industry norms such as ITU-T G.652.D and riser-rated fire safety codes. The award will be determined through a trade-off process considering price, past performance, and delivery date, with no preference given to the lowest technically acceptable bid. The full kit is to be delivered as a single unit to 100 Independence Drive, Camp Douglas, Wisconsin 54618-5001, with an anticipated award date of September 2, 2026, following responses due by August 10, 2026. While the notice explicitly requires direct solicitation to at least three qualified small business sources and satisfies public posting obligations under FAR 12.201-1(c)(2) and RFO 5.1, it does not include formal contract clauses, pricing data, packaging or marking specifications, invoicing methods, accounting codes, or detailed inspection criteria. The procurement leverages commercial item acquisition policies, with no references to military standards like MIL-STD-129 or electronic submission portals, indicating a logistical procurement focused on physical material delivery rather than complex service performance or technical integration.
Other Communication and Energy Wire Manufacturing

POSTED

1 day ago

DEADLINE

in 13 days
View Details