Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Fiber-Optic Network Design & Engineering

Open
State & Local
Response DeadlineDue in 21 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of SE-26-02.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

On-Call Fiber-Optic Network (FON) Enhancements and Repairs

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 21 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 13 documents on the prime contractFrom On-Call Fiber-Optic Network (FON) Enhancements and Repairs
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Long Beach, acting by and through its Board of Harbor Commissioners
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs detailed design and engineering for fiber-optic network enhancements and repairs for prime contractors on City of Long Beach (Board of Harbor Commissioners) projects. Prepares detailed construction plans depicting locations and depths of trenching, installation, equipment layout, and work areas. Requires plans to be signed and stamped by a Professional Engineer (PE). Delivers signed/stamped construction plans, electronic project implementation schedules, and labor cost schedules.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency (IEUA) is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project (Project No. EN25022.02). The scope of work focuses on the design of groundwater recharge injection wells and associated monitoring wells, organized into seven primary tasks including project initiation, data gathering, basis of design (30 percent level), detailed design, and engineering services during the procurement, bid, and award phases. Key deliverables include a Basis of Design Report, detailed design documents, and procurement packages for well drilling and construction. The project aims to start construction of injection and monitoring wells by May 2028 and injection wells equipping by July 2029. This is a small business set-aside opportunity open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. Proposals must be submitted via PlanetBids by January 26, 2027, and must be limited to 35 pages using at least a 10-point font. The selection process is based on a ranking of qualifications, with fee envelopes opened only for the top three ranked consultants. The final contract will be a not-to-exceed agreement, with payments made via ACH following monthly electronic invoicing. Compliance with the Buy America Preference, 2 CFR Part 200, and various federal grant requirements is mandatory.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in 2 months
View Details
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project. The scope of work involves developing a purified water conveyance system to transport water from the Advanced Water Purification Facility to injection wells. Key responsibilities include conducting utility research and field investigations, establishing a basis of design across multiple disciplines, and developing detailed design drawings at 30, 60, 90, and final design levels. The consultant will also provide engineering services during the bid award process and deliver final design reports, specifications, and AutoCAD files. This solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by January 26, 2027, via PlanetBids. The selection process is based on a ranking of proposals evaluated on factors such as project implementation plans, technical challenges, and cost control, with the top three ranked consultants proceeding to fee envelope review and potential interviews. The contract is a not-to-exceed agreement paid on a time and material basis. Consultants must maintain comprehensive insurance, including Commercial General Liability, Professional Liability, and Workers' Compensation. Because the project is supported by federal and state grants, the consultant must comply with 2 CFR Part 200, the Davis-Bacon Act, and Buy America preferences. Additionally, the consultant must meet Disadvantaged Business Enterprise (DBE) requirements, including the Six Good Faith Efforts for sub-consulting services.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in 2 months
View Details
NAICS: 541330
New
SLED
Wastewater Treatment Plant Zinc Mitigation Evaluation And Design Services
Solicitation # 20261124055
The City of Shasta Lake is soliciting a Professional Services Agreement for the evaluation and design of a metals (zinc) mitigation facility at its existing Wastewater Treatment Plant. The primary objective is to achieve permanent permit compliance by mitigating zinc in effluent flow, adhering to NPDES and WDR regulatory requirements. The scope of work includes project management, environmental compliance, assistance with the Division of Financial Assistance (DFA) construction application, and engineering design, including bench-scale testing and a 20% conceptual design. Key deliverables include monthly progress reports, a final geotechnical report, a project report meeting CWSRF policies, and conceptual plans and estimates. The contract is expected to be awarded in March 2027, with all work completed by June 2031. The selection process is based on obtaining the most qualified Consultant Team, with evaluation factors focusing on the team's understanding of the work, technical ability with similar projects, experience with DFA funding and NPDES permits, and expertise in CEQA and NEPA-like clearances. The total estimated cost for the project is divided among project management ($150,000), the project report ($401,200), environmental documentation ($96,000), the CWSRF construction application ($40,000), and engineering design ($120,000). Consultants must maintain GAAP-compliant project accounts and submit reimbursement requests with supporting documentation. This solicitation is not set aside for any specific socioeconomic category.
City of Shasta Lake

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → City of Long Beach, acting by and through its Board of Harbor Commissioners

Same awarding agency

NAICS: 237130
New
SLED
On-Call Fiber-Optic Network (FON) Enhancements and Repairs
Solicitation # SE-26-02
The Port of Long Beach is seeking a qualified contractor for solicitation SE-26-02 to provide on-call design, procurement, construction, and installation services for its Fiber-Optic Network (FON). The scope of work involves performing enhancements and repairs, providing materials such as fiber-optic cable, microduct, conduit, vaults, and hubs, and integrating these components into the existing network. The contractor is required to use microduct and air-blown fiber as the standard installation methodology, conduct quality assurance testing, and provide training to Port staff on operation and maintenance. All work is performed on a turnkey basis under the direction of the Port’s Security Division Project Management Team and is managed through the issuance of specific task orders. This is an on-call contract with a rate sheet covering a three-year period, utilizing both prevailing and non-prevailing wage rates. Proposals are evaluated on a 100-point scale focusing on team organization, technical approach, and a 10% combined SBE/VSBE participation goal. The selection process involves a written evaluation and potential interviews, with the Port not bound to accept the lowest bid. Key requirements include the provision of performance and payment bonds, adherence to ANSI/ICEE/NEMA/UL standards, and a maximum 15% markup on third-party materials. Proposals must be submitted via the PlanetBids portal by December 16, 2026. There is no specific set-aside status for this solicitation.
Power and Communication Line and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS