Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Field Instrumentation Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Field Instrumentation Supply involves providing essential field instruments and sensors for prime contractors working on City of Conroe water facility projects. The scope of work includes the delivery of flow indicating transmitters, temperature indicating transmitters, and pressure switches, all of which must be supplied in accordance with manufacturer-specific technical data and shop drawings to support the overall control system. The opportunity was posted on September 2, 2026, with a response deadline of September 17, 2026. Classified under NAICS code 334517, the contract is managed by the Engineering agency within Texas. Interested parties can find further details through the provided procurement portal link.

General Info

Subcontract for supplying field instruments and sensors for City of Conroe water facilities.

Agency

Texas → EngineeringView Agency

NAICS

334517 - Irradiation Apparatus ManufacturingView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 2025-35.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Replacement Well No. 5 & Control Building

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies field instruments and sensors for prime contractors on City of Conroe water facility projects. Provides flow indicating transmitters, temperature indicating transmitters, and pressure switches. Supplies components based on manufacturer-specific technical data and shop drawings. Delivers the required field instrumentation components for the control system.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Engineering

Same awarding agency

NAICS: 237110
New
SLED
US 90A at Circle Drive/John Sharp Drive Utility Casings CST2003
Solicitation # 2026-ITB-043
Solicitation 2026-ITB-043 involves the installation of two 24-inch steel utility casings at the intersection of US 90A and John Sharp Drive/Owens Road in Sugar Land, Texas. The project requires the use of trenchless methods to install approximately 360 linear feet of casing for a future water line and 303 linear feet for a future wastewater force main. The scope of work includes the construction of bore and receiving pits, capping and marking casing ends, utility coordination, traffic control, dewatering, excavation, backfill, and the restoration of all disturbed pavement, sidewalks, and landscaped areas. The contractor is responsible for providing all labor, materials, equipment, and supervision, and must coordinate with the City of Sugar Land, TxDOT, Union Pacific Railroad, and other utility owners. Note that the actual carrier water line and force main are not part of this contract and will be installed under a separate project. The procurement process is managed by the City of Sugar Land Engineering department, with a response deadline of September 24, 2026. Bidders must submit a comprehensive proposal package including a signed bid, financial statements, pricing forms, bid bonds, and insurance agreements. The project is governed by the City of Sugar Land Standard Contract for Civil Engineering Construction Projects, which includes provisions for liquidated damages, performance and payment bonds, and compliance with Texas government codes. The contract framework also provides standardized templates for change order requests, addendums, and a final Contractor's Affidavit of Bills Paid to ensure all subcontractors are paid before final settlement.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 18 days
View Details