Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Figarden Elementary School Multipurpose Room Roof Replacement

Closed
24-80State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

24 minutes ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
Gatesville ISD Intermediate Campus Roof Repair
Solicitation # RFP2026-1030
Gatesville Independent School District is soliciting sealed proposals under RFP 2026-1030 for comprehensive roof repairs at the Intermediate campus, with an expanded scope via addendum to include a portion of the High School campus facility. The project requires a qualified contractor to provide all labor, supervision, equipment, and materials for a commercial roofing layover. Key technical specifications include the removal of existing gravel, installation of 2.2 inch ISO board for the main area and 1 inch ISO board for the addendum area, and the application of 60mil GAF-TPO or an equivalent system. The scope also encompasses the installation of ten GAF speedtite drains with 4 inch piping, tapered ISO boards at drains, steel deck system patching for caved-in areas, and the installation of proper flashing and pipe boots according to manufacturer specifications. The contract will be awarded based on a competitive solicitation process rather than low price alone, considering factors outlined in the Texas Education Code. Successful bidders must provide a five-year workmanship warranty, general liability insurance, and a standard manufacturer warranty. Proposers must submit a complete packet including mandatory certifications such as the SB 9 Criminal History Record, House Bill 89 Verification, and Senate Bill 252 Certification. All proposals must be submitted in sealed envelopes by October 30, 2026, at 2:30 p.m., with the final award scheduled for November 16, 2026. Bids must remain firm for 60 days following the award date.
GATESVILLE ISD

POSTED

about 6 hours ago

DEADLINE

in 2 days

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

2

Bid No. 24-80: Figarden Elementary School Multipurpose Room Roof Replacement

PDF, High priority: read this firstitb
High

Bid 24-80 Figarden Elementary School Multipurpose Room Roof Replacement Bidders List

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno Unified School District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Join in to the bid opening here:Microsoft Teams Need help? Join the meeting now Meeting ID: 229 735 488 507 Passcode: eTxcaw Dial-in by phone +1 (555) 000-0000,,983960729# United States, Fresno Find a local number Phone conference ID: 983 960 729# FRESNO UNIFIED SCHOOL DISTRICT00 11 00 NOTICE TO BIDDERSNOTICE INVITING BIDS PURSUANT TO PUBLIC CONTRACT CODE 22000, ET SEQ.(THE UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING ACT)Notice is hereby given that the Fresno Unified School DISTRICT (“DISTRICT”) will receive sealed bids for Bid No. 24-80, Figarden Elementary School Multipurpose Room Roof Replacement, to repair and replace existing roof on the Multipurpose Room.Notice is hereby given pursuant to the provisions of Section 1770 et seq of the California Labor Code, each worker of the contractor and any of its subcontractors engaged in work on the Project shall be paid not less than the prevailing wage rate. The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR). Pursuant to Labor Code Section 1725.5, the DIR established a Contractor Registration Program, in which no contractor or subcontractor shall bid on, be listed in a bid, or engage in the performance of any public work contract without being registered. Prime Contractor must have a valid Class “C-39” Contractor’s License.The time allowed for completion for the project shall be 45 Calendar days.The Architect/Engineers’ estimate for this project is around $300,000. A MANDATORY pre-bid conference has been scheduled at 10:00 AM, April 11, 2024 in front of the Administration Office at Figarden Elementary School, 6235 N. Brawley, Fresno CA 93722.  Contractors bidding as a Prime Contractor for the project must attend in order for their bid to be “responsive”.  Immediately following the pre-bid conference will be a mandatory job-walk of the site(s). School sites are using the Raptor visitor management system that requires all visitors to show either a government-issued identification card or driver’s license to receive a badge and enter the campus. Bidders may arrive earlier than the scheduled time to obtain their badge.Sealed Bids must be received prior to 2:00 P.M. on April 25, 2024  on Procureware, the DISTRICT’s online bidding portal, after which time the bids will be opened and bid results posted.Bids shall be accompanied by a certified check, cashier’s check, or a bidder’s bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. The substitution of appropriate securities in lieu of retention amounts from progress payments in accordance with Public Contract Code Section 22300 is permitted.  The Bid documents are on file at Fresno and Tulare Builders Exchanges; and Fresno Reprographics.Pursuant to Public Contract Code 3400(c)(2), Fresno Unified School DISTRICT finds that it is in the best interest of the DISTRICT to standardize the products, equipment, and materials listed in Exhibit A-1 and Exhibit A-2 in order to match other products/equipment in use on a particular work of improvement either completed or in the course of completion. Where a specific brand, trade name, material, or product identified in the bid documents is also listed in Exhibit A-1 or Exhibit A-2, it shall be deemed to be followed by the words “No Substitutions,” and CONTRACTOR shall not make or request substitutions regarding any such product, equipment or material. Exhibit A-1 and Exhibit A-2 may be obtained from DISTRICT Purchasing Department web page under public works CUPCCAA menu: https://purchasing.fresnounified.org/cupccaa/.In accordance with AB 635 for roofing projects, Bidders shall comply with all requirements, submittals, and substitutions described in the provisions of Public Contract with Public Contract Code 3000 thru 3010.Copies of the bid documents may be downloaded at no charge: https://fresnousdpurchasing.procureware.com/home  Refer questions to Edward Van Patten +1 (555) 000-0000.Published: April 3, 2024

More opportunities from California → Fresno Unified School District

Same awarding agency

NAICS: 238220
New
SLED
Farber Educational Campus Buffer Tank Installation
Solicitation # 1561-00017
The Fresno Unified School District is soliciting bids for the installation of a new Wessels Co. model CBTH-1500-8F buffer tank in the chilled water return piping at the Farber Educational Campus in Fresno, California. This mechanical project includes all labor, materials, and equipment necessary for the installation, as well as the construction of a new reinforced concrete pad. The scope encompasses demolition, installation, and a comprehensive commissioning process involving functional testing, start-up execution, and the provision of record drawings. The project has an estimated value of approximately 140,000 dollars and must be completed within 90 calendar days. Eligible bidders must hold a valid Class C-20 Contractor's License and adhere to strict safety protocols, including OSHA standards and student safety fingerprinting requirements. The contract will be awarded to the lowest responsive and responsible bidder. Key compliance requirements include adherence to prevailing wage laws, registration with the Department of Industrial Relations, and a Disabled Veteran Business Enterprise participation goal of 3 percent. Required submissions include a 10 percent bid bond, with the successful contractor providing performance and payment bonds for 100 percent of the contract amount. Bids are due by November 17, 2026, via the Procureware portal.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 238210
New
SLED
Intrusion Security Upgrades At Various Sites Phase 7
Solicitation # 27-16
The Fresno Unified School District is soliciting bids for project 27-16, which entails intrusion security upgrades across ten school sites, including specific work at Wilson and Cooper buildings. The scope of work involves the removal of obsolete alarm equipment and the installation of new contractor-provided infrastructure, including control panels, power supplies, zone expanders, keypads, motion detectors, door contacts, and glass break detectors. The contractor is responsible for selective demolition, electrical work, conduit and surface raceway installation, low voltage cabling, and necessary patching and painting. While the contractor provides the hardware, the district will handle the programming of the control panel and network configuration. The contract will be awarded to the lowest responsive and responsible bidder based on the price total of Base Bids per Section, with Sections A and B awarded separately. Eligible prime contractors must possess a Class C-10 California State Contractors license and be registered with the Department of Industrial Relations. Bids are due by November 17, 2026, via the Procureware online portal and must include a bid bond equal to 10 percent of the total bid. The project is subject to California prevailing wage laws and includes a Disabled Veteran Business Enterprise goal of 3 percent. Payment terms are set at 95 percent of the unpaid balance, payable within 30 days of approval. Final acceptance is contingent upon the delivery of signed certificates of inspection and the use of UL-listed materials.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

7 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS