This Solicitation opportunity from Massachusetts was posted on February 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Filed Subcontractor Prequalification - Clinton Middle School

Closed
BD-25-1706-ADM02-ADM02-113237State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
REPLACE THE GUTTERS AT THE DEFUNIAK COURTHOUSE
Solicitation # 05-27
Walton County is soliciting competitive quotations for the complete removal and replacement of the internal and concealed gutter system at the three-story DeFuniak Springs Courthouse in Florida. The selected contractor must provide all labor, supervision, equipment, and materials necessary to install a durable, watertight drainage system, including the removal of deteriorated flashing, sealants, and liners. Key requirements include performing a preconstruction assessment to verify dimensions, conducting a controlled water test upon completion, and ensuring all restoration materials are compatible with the existing building. The project requires a final walkthrough with the owner and a comprehensive site cleanup to return the area to its preconstruction condition. Qualified respondents must hold a valid Florida contractor license, such as a Certified General, Building, Roofing, or Sheet Metal Contractor license. Submissions must include a total lump-sum base quotation with an itemized breakdown, a proposed project schedule detailing mobilization and duration, warranty information for both workmanship and materials, and two professional references. The deadline for responses is November 19, 2026, at 12:00 pm, with all submissions and clarifications handled through the OpenGov Procurement portal. Award consideration will be based on price and the ability to meet technical and administrative requirements.
Facility Maintenance

POSTED

about 17 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Town of Clinton in Massachusetts is seeking prequalification submissions from qualified subcontractors for the Early Release Package #3B of the Clinton Middle School Building Project, which includes waterproofing, damp-proofing, and elevator work. The project team comprises Lamrouex Pagano Associates as the architect, Dore and Whittier Management Partners as the owners' project manager, and Fontaine Bros, Inc. as the construction manager. The solicitation was issued on February 26, 2025, with a deadline for responses set for March 19, 2025. The contract scope involves work valued between $500,000 and $1,500,000 and falls under NAICS code 238160, which pertains to roofing, siding, and sheet metal work. Interested parties can contact Michael J. Ward via email or phone for further details and access the solicitation documents through the provided online link.

General Info

Agency

Massachusetts → Town of Clinton, MA

Place of Performance

MA, USA

Set-Aside

NONE

Documents

1

Town of Clinton - Middle School Early Release Package #3B Prequalification

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Town of Clinton, MA
Contacts1 person available
OfficeN/A
Organization / Agency
Massachusetts → Town of Clinton, MA
Office AddressN/A

Full Description

Show more
The Town of Clinton is soliciting filed trade prequalification for the Early Release Package #3B: Early Waterproofing, Damp-proofing Pt.1, and Elevator of the Clinton Middle School Building Project. Lamrouex Pagano Associates | Architects, Inc (Designer), Dore and Whittier Management Partners (Owners Project Manager), and Fontaine Bros, Inc. (CM) are the project team.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS