This Solicitation opportunity from Saskatchewan Public Sector was posted on April 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Fill Station: Design Plan Tender
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Rural Municipality of McKillop No. 220 is soliciting proposals from qualified consultants or firms to develop a comprehensive design plan for a water-fill station. Located at Maple Grove/Bible Camp within Division 6, the project aims to establish a sustainable and reliable water source utilizing lake water. The selected provider will be responsible for evaluating water treatment needs and designing the overall infrastructure, including distribution systems, storage tanks, filling stations, access roads, fencing, and parking. The scope of work emphasizes the integration of green technologies, such as solar-powered pumps and advanced filtration systems, to ensure environmental sustainability. Additionally, the consultant must provide a detailed cost estimate covering the design, construction, operation, and maintenance of the facility. Interested parties must submit their responses by May 16, 2025, under solicitation number RM220-002-2025.
General Info
Place of Performance
SK, CANSet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Scope of Work The design plan should cover the following key aspects: • Site Selection: "Maple Grove/Bible Camp" located within Division 6 of the geographical boundaries of the Rural Municipality has been Identified as the location, considering accessibility, and proximity to water sources. • Water Supply & Treatment: Water source is identified as lake water and determination of the need for water treatment will have to be examined. • Infrastructure Design: Layout of the water fill station, including water distribution systems, storage tanks, filling stations, and any required supporting infrastructure such as access roads, fencing, and parking. • Sustainability Features: Integration of green technologies, such as solar-powered pumps or water filtration systems, to promote environmental sustainability. • Cost Estimate: Detailed breakdown of projected costs for design, construction, operation, and maintenance.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
