Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on April 30, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Filter media replacement for five filters located at the Nogales International Wastewater Treatment Plant (NIWTP)

Closed
IBM10R0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days

General Info

Agency

N/A

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Nogales International Wastewater Treatment Plant (NIWTP) 865 Rio Rico Industrial Park, RIO RICO, AZ, 85648, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline time changed from 10:00 PM UTC to 8:00 PM UTC on May 24, 2010. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Colleen J. ElliottContracting Officer
Ruben PinoContract Specialist

Full Description

Show more
The Nogales International Wastewater Treatment Plant (NIWTP) Filter Structure was initially commissioned in 1992; and further rehabilitated during 2000 - 2002. It consists of five 16-foot wide by 94-foot long filters receiving wastewater from the secondary clarifiers for further turbidity removal and subsequent discharging to the Ultra-Violet Disinfection Unit. Each filter has a bottom layer of coarse sand and a top layer of fine sand with a combined design thickness of approximately 22 inches. This project is for the renovation of the filters housing structure and the replacement of the filter media. Replacement of the existing backwash pumps with two new pumps shall be a possible option to be considered by United States Section International Boundary and Water Commission (USIBWC). The NIWTP is a restricted Facility; and access for delivery of construction materials or equipment shall be in accordance with existing USIBWC procedures. The Contractor shall provide all items, material, equipment, labor, supervision, operations or methods, and incidentals necessary for the rehabilitation of the existing five (5) sand filters at NIWTP. The NIWTP is located in Rio Rico, Santa Cruz County, just north of Nogales, Arizona. All responsible sources may submit a proposal which shall be considered by the USIBWC. The solicitation will be made available to interested parties through electronic data interchange, please provide any information necessary to obtain and respond to the solicitation electronically. This will be a small businesses 100% side aside solicitation. NAICS CODE: 236220.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS