Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 14, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Area Meadow Restoration

Awarded
AG-9A14-S-09-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

2 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Fire Area Meadow Restoration project, managed by the San Bernardino National Forest under the Department of Agriculture, involves critical stabilization work across various locations on the Mountaintop Ranger District. The scope of work focuses on reshaping vertical banks to promote vegetative recovery and the mechanical placement of rocks and boulders in drainages and ephemeral channels to prevent seasonal scour. Key activities include excavation in meadows with a focus on topsoil conservation, the preservation and replanting of perennial grass sod, and the installation of erosion control blankets and rolled products to ensure vegetation survivability on slopes. Technical requirements for the project include the use of geotextile products as permeable separators to prevent soil piping beneath structures. This award notice, associated with solicitation number AG-9A14-S-09-0011 and NAICS code 237990, followed a competitive process with six total proposals received. The project is overseen by Contracting Officer David B. Hallen in San Bernardino, California.

General Info

Contract Value

$212,869.65

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CA, USA

Set-Aside

NONE

Award Issued Date

Documents

21
DOC, High priority: read this first14 pages · ifb
High
DOC, High priority: read this first1 page · amendment
High
DOC, High priority: read this firstamendment
High
DOC, High priority: read this first3 pages · amendment
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this firstspecifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, High priority: read this first1 page · specifications
High
DOC, Low priorityq-and-a
Low
DOC, Low priority1 page · contract-document
Low
DOC, Low priority1 page · contract-document
Low
DOC
DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from May 16, 2009 to May 15, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → San Bernardino National Forest
Contacts1 person available
OfficeSAN BERNARDINO, CA, 92408, USA
Office AddressSAN BERNARDINO, CA, 92408, USA
Contacts
David B. HallenContracting Officer

Full Description

Show more
Work required to stabilize these areas includes reshaping vertical banks to allow vegetative recovery, and machine placement of rock in drainages to prevent additional scour from seasonal flows. Specific work items include excavation in meadows often requiring conservation of topsoil, and preserving and re-planting living sod of perennial grasses. Excavation will also take place in steep and eroded ephemeral channels and existing gullies requiring trenching and mechanical placement of rocks and boulders. Work will also entail placement of erosion control blanket and rolled erosion control products to enhance vegetation establishment and survivability on slopes and in channels. Erosion control design requirements may include below grade placement of geotextile products as a permeable separator/stabilizer, to prevent piping of soil beneath new or existing structures. (b) Project location. Various locations on the Mountaintop Ranger District of the San Bernardino National Forest. 6 Total proposals received.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS