Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Fire Hydrant Replacement Project GW-2505

Forecast
GW-2505State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fire Hydrant Replacement Project GW-2505 is a forecast project managed by the Marina Coast Water District in California. The primary objective is to ensure the operational readiness of fire hydrants and valves during emergencies within the Fitch Park community, located in the Ord Military Community in Monterey County. The scope of work includes the installation and replacement of up to 45 fire hydrant check valves and branch valves, 35 water mainline isolation valves, and 13 fire hydrants. The project is classified under NAICS code 237110 and is exempt from the California Environmental Quality Act under State CEQA Guidelines Class 1(b) for existing public utility facilities, with a Notice of Exemption filed on July 2, 2025. Remleh Scherzinger, the General Manager of the Marina Coast Water District, serves as the lead agency contact. While the project was posted on July 30, 2025, there are currently no specified contract values, formal delivery schedules, or detailed evaluation factors provided in the available documentation.

General Info

Replace fire hydrants and valves in Fitch Park to improve emergency water access with no federal procurement or cost details.

Agency

California → Marina Coast Water District

Place of Performance

Algeria Road and Tunisia Road, CA, 93955

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Marina Coast Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Marina Coast Water District
Office AddressN/A

Full Description

Show more
This project will replace and install up to forty-five (45) fire hydrant check valves and branch valves, thirty-five (35) water mainline isolation valves, and thirteen (13) fire hydrants within the Fitch Park Community. This project will ensure Fitch Park hydrants and valves are operational in the case of an emergency.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS