Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Island Inlet to Montauk Point (FIMP) Nonstructural Pilot Project

Closed
W912DS26RA007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 13 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 13 hours ago

DEADLINE

in about 17 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 13 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 18 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The Fire Island Inlet to Montauk Point (FIMP) Nonstructural Pilot Project, solicited under number W912DS26RA007 by the U.S. Army Corps of Engineers New York District (W2SD Endist New York), focuses on evaluating and implementing nonstructural risk reduction measures in the Suffolk County area, specifically in Montauk and surrounding locales. The solicitation issued on December 8, 2025, and with a response deadline of January 9, 2026, involves a complex scope centered on elevating existing residential structures to FEMA-designated flood elevations to mitigate coastal storm risks. The project includes detailed structural condition assessments of numerous houses across Babylon, Brookhaven, and Mastic Beach, incorporating comprehensive evaluations of foundations, walls, roofs, utilities, and signs of structural damage. These assessments inform design and construction requirements aimed at improving coastal resilience pursuant to the FIMP General Re-evaluation Report Study. The contract is organized as a design-build solicitation under FAR Part 36.3 with a best value trade-off award strategy, emphasizing performance capability, past experience, and technical merit alongside price considerations. Offerors must submit detailed proposals in multiple volumes, with strict formatting and size limitations, and submissions are accepted exclusively via the SAFE portal. Key elements of the solicitation include performance technical specifications, project program requirements, and mandatory compliance with environmental, safety, and permitting protocols. Evaluation criteria prioritize the most important technical factors, including specialized past experience and project management capability, along with demonstrated compliance with labor standards, safety, and quality control. The contract further requires adherence to standard government clauses related to subcontracting plans, labor laws, security, and sustainability, with provisions for ongoing performance assessment overseen by designated government representatives. Comprehensive structural and geotechnical data underpin contract requirements, supporting the development of effective foundation designs and ensuring constructions meet FEMA flood elevation standards and local zoning regulations.

General Info

Design-build contract to elevate Suffolk County homes to FEMA flood levels, emphasizing technical merit.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Montauk, NY, 11954, USA

Set-Aside

NONE

Documents

86

Amendment 0001 to Solicitation W912DS26RA007

PDF, High priority: read this first4 pages · amendment
High

FIMP Coastal Storm Risk Re-Evaluation Design Requirements Attachment B

PDF, High priority: read this first2 pages · design-requirements
High

Final DB RFP Table of Contents for Fire Island to Montauk Point Coastal Storm Risk Re-Evaluation

PDF, High priority: read this first3 pages · rfp
High

Geotechnical Data Report Fire Island to Montauk Point Contract 6 May 2025

PDF, High priority: read this first70 pages · geotechnical-report
High

Performance Assessment Plan Form for Nonstructural Pilot W912DS24F0073

PDF, High priority: read this first4 pages · performance-assessment-plan
High

Permits Record of Decision Form for FIMP Coastal Storm Risk Re-Evaluation

PDF, High priority: read this first13 pages · permit-record-of-decision
High

Solicitation W912DS26RA007 FIMP Pilot IFB

PDF, High priority: read this firstifb
High

Structural Condition Assessment Checklist - 109 Hickory Rd, Mastic Beach

PDF, High priority: read this first26 pages · structural-assessment
High

Structural Condition Assessment Checklist - 11 Mitchell Ave, Babylon

PDF, High priority: read this first30 pages · structural-assessment
High

Structural Condition Assessment Checklist - 15 Milton Rd, Babylon

PDF, High priority: read this first29 pages · structural-assessment
High

Structural Condition Assessment Checklist - 15 Sheridan Rd, Babylon

PDF, High priority: read this first30 pages · structural-assessment
High

Structural Condition Assessment Checklist - 16 Rosewood Rd, Mastic Beach

PDF, High priority: read this first35 pages · structural-assessment
High

Structural Condition Assessment Checklist - 21 W Harrison Ave, Babylon

PDF, High priority: read this first27 pages · structural-assessment
High

Structural Condition Assessment Checklist - 22 Babylon Rd, Mastic Beach

PDF, High priority: read this first26 pages · structural-assessment
High

Structural Condition Assessment Checklist - 22 Mitchell Ave, Babylon

PDF, High priority: read this first33 pages · structural-assessment
High

Structural Condition Assessment Checklist - 24 Babylon Rd, Mastic Beach

PDF, High priority: read this first30 pages · structural-assessment
High

Structural Condition Assessment Checklist - 25 Pershing Ave, Babylon

PDF, High priority: read this first33 pages · structural-assessment
High

Structural Condition Assessment Checklist - 25 W Harrison Ave, Babylon

PDF, High priority: read this first32 pages · structural-assessment
High

Structural Condition Assessment Checklist - 29 Milton Rd, Babylon

PDF, High priority: read this first31 pages · structural-assessment
High

Structural Condition Assessment Checklist - 2 Babylon Rd, Mastic Beach

PDF, High priority: read this first30 pages · structural-assessment
High

Structural Condition Assessment Checklist - 38 Montauk Dr, Mastic Beach

PDF, High priority: read this first30 pages · structural-assessment
High

Structural Condition Assessment Checklist - 46 Mitchell Ave, Babylon

PDF, High priority: read this first23 pages · structural-assessment
High

Structural Condition Assessment Checklist - 48 Mitchell Ave, Babylon

PDF, High priority: read this first24 pages · structural-assessment
High

Structural Condition Assessment Checklist - 4 Babylon Rd, Mastic Beach

PDF, High priority: read this first31 pages · structural-assessment
High

Structural Condition Assessment Checklist - 681 Riviera Dr, Mastic Beach

PDF, High priority: read this first31 pages · structural-assessment
High

Structural Condition Assessment Checklist - 70 S Bay Dr, Babylon

PDF, High priority: read this first34 pages · structural-assessment
High

Structural Condition Assessment Checklist - 739 Riviera Dr, Mastic Beach

PDF, High priority: read this first25 pages · structural-assessment
High

Structural Condition Assessment Checklist - 82 Huntington Dr, Mastic Beach

PDF, High priority: read this first27 pages · assessment-checklist
High

Structural Condition Assessment Checklist - 84 S Bay Dr, Babylon

PDF, High priority: read this first26 pages · structural-assessment
High

Structural Condition Assessment Checklist - 8 Bluepoint Rd, Mastic Beach

PDF, High priority: read this first31 pages · structural-assessment
High

Structural Condition Assessment Checklist - 96 Huntington Dr, Mastic Beach

PDF, High priority: read this first32 pages · structural-assessment
High

Structural Condition Assessment Checklist for 100 Hickory Rd, Mastic Beach

PDF, High priority: read this first26 pages · structural-assessment
High

Structural Condition Assessment Checklist for 100 Huntington Dr, Mastic Beach

PDF, High priority: read this first31 pages · structural-assessment
High

Structural Condition Assessment Checklist for 100 S Bay Dr, Babylon

PDF, High priority: read this first27 pages · structural-assessment
High

Structural Condition Assessment Checklist for 105 Bayview Dr, Mastic Beach

PDF, High priority: read this first28 pages · structural-assessment
High

Structural Condition Assessment Checklist for 10 Poplar Rd (Bldg 2), Mastic Beach

PDF, High priority: read this first22 pages · structural-assessment
High

Structural Condition Assessment Checklist for 10 Poplar Rd (Building 1)

PDF, High priority: read this first26 pages · structural-assessment
High

Structural Condition Assessment Checklist for 125 Hickory Rd (Bldg 1)

PDF, High priority: read this first27 pages · structural-assessment
High

Structural Condition Assessment Checklist for 17 Bayport Rd, Mastic Beach

PDF, High priority: read this first25 pages · structural-assessment
High

Structural Condition Assessment Checklist for 17 Montauk Dr, Mastic Beach

PDF, High priority: read this first29 pages · structural-assessment
High

Structural Condition Assessment Checklist for 20 Bayside Rd, Mastic Beach

PDF, High priority: read this first30 pages · structural-assessment
High

Structural Condition Assessment Checklist for 22 Blue Point Rd, Mastic Beach

PDF, High priority: read this first36 pages · structural-assessment
High

Structural Condition Assessment Checklist for 23 W Harrison Ave, Babylon

PDF, High priority: read this first32 pages · structural-assessment
High

Structural Condition Assessment Checklist for 24 Blue Point Rd, Mastic Beach

PDF, High priority: read this first25 pages · structural-assessment
High

Structural Condition Assessment Checklist for 28 Blue Point Rd, Mastic Beach

PDF, High priority: read this first24 pages · structural-assessment
High

Structural Condition Assessment Checklist for 2 Olive Rd, Mastic Beach

PDF, High priority: read this first31 pages · structural-assessment
High

Structural Condition Assessment Checklist for 37 Cranberry Dr, Mastic Beach

PDF, High priority: read this first27 pages · structural-assessment
High

Structural Condition Assessment Checklist for 39 W Harrison Ave, Babylon

PDF, High priority: read this first38 pages · structural-assessment
High

Structural Condition Assessment Checklist for 3 Quail Rd, Mastic Beach

PDF, High priority: read this first29 pages · structural-assessment
High

Structural Condition Assessment Checklist for 450 Riviera Dr, Mastic Beach

PDF, High priority: read this first29 pages · structural-assessment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Dec 27, 2025 to Jan 9, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New York
Contacts1 person available
OfficeNEW YORK, NY, 10278-0004, USA
Office AddressNEW YORK, NY, 10278-0004, USA
Contacts
Michael McCue

Full Description

Show more

See attached solicitation

More opportunities from Department Of Defense → W2SD Endist New York

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS