Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on November 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Station No. 23 Drain Field

Closed
24/F25-029State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Clay County Board of County Commissioners is initiating a project to upgrade and remediate the drainage system at Fire Station No. 23 in Florida. The scope involves removing a failing drain field and responsibly disposing of contaminated materials, followed by excavating and replacing the compromised soil with clean, uncontaminated soil. To improve system reliability and capacity, the project includes constructing two new drain fields—one to replace the existing one and another on the opposite side of the septic tank. An additional septic tank will be installed, equipped with two effluent pumps, each with control panels and four floats, allowing independent management of each drain field. The design incorporates trench layouts to optimize waste flow and system durability. After completing the structural work, the site will be landscaped with seeding and hay to stabilize the area and restore its appearance. The project aims to ensure the operational safety and efficiency of the station’s wastewater management system, with a budget estimated between $200,000 and $500,000. The solicitation for this project was posted on November 15, 2024, with a response deadline of December 6, 2024. The project is managed under the NAICS code 238910, which pertains to site preparation contractors, and is overseen by the Florida Public Safety agency. The primary point of contact is Jessika Buzzelli, reachable via email or phone. The project details and procurement process are accessible through the county’s online portal. Additionally, an EFT authorization form is included in the documentation, indicating that payments will be processed electronically, with the necessary banking information provided for secure transactions. This comprehensive upgrade is essential for maintaining the station’s operational readiness and ensuring environmental compliance.

General Info

Agency

Florida → Public Safety

Place of Performance

FL, USA

Set-Aside

NONE

Documents

6

24/25-029 Fire Station No. 23 Drain Field

PDF, High priority: read this firstrfq
High

Certificate of Final Payment

PDF, Low priority1 page · certificate-of-final-payment
Low

Certificate of Partial Payment

PDF, Low priority1 page · payment-certificate
Low

Clay County Contractor Warranty Letter

PDF, Low priority1 page · contractor-warranty
Low

Clay County EFT Authorization Form

PDF, Low priority1 page · other
Low

IRS Form W-9 Request for Taxpayer Identification Number (2024)

PDF, Low priority6 pages · tax-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Safety
Contacts1 person available
OfficeN/A
Organization / Agency
Florida → Public Safety
Office AddressN/A
Contacts

Full Description

Show more
Project Description:The Clay County Board of County Commissioners (County) is seeking to undertake a crucial upgrade and remediation project for the drainage system at Fire Station No. 23. This initiative involves the removal and environmentally responsible disposal of a failing drain field. In its place, comprehensive remediation efforts will be conducted which include excavating the compromised soil and replacing it with new, uncontaminated soil. Additionally, the project includes the construction of two new drain fields: one to replace the original and another newly added on the opposite side of the existing septic tank.To further enhance the system, the installation of an additional septic tank is planned, which will be equipped with two (2) effluent pumps, each with a control panel and four (4) floats, designed to independently manage each drain field. The design of the new system will incorporate a trench layout to ensure effective waste management and infrastructure longevity.Upon completion of the structural installations, the site will undergo final landscaping touches, including seeding and the application of hay to aid in area stabilization and aesthetic restoration. This project is vital for maintaining the operational readiness and safety standards.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS