Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on January 28, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Supression Inspections

Closed
FireSuppressionInspections01Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561621
New
Centennial Fire Alarm & CO Detection Upgrade and Maintenance Services
Solicitation # centennial-fire-alarm-co-detection-upgrade-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to provide fire alarm and carbon monoxide (CO) detection upgrade and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The primary objective is to restore the central Simplex 4020 Fire Alarm Control Center Panel and connected systems across nine campus facilities to full operational status. The scope of work includes diagnosing and clearing system trouble statuses, upgrading the control panel motherboard or firmware if necessary, and integrating CO detection into the men's and women's dormitories by installing intelligent multi-criteria detectors and sounder bases. All work must adhere to NFPA 101 (2024), NFPA 72 (2025), IFC (2024), and local building and fire codes. Bids are due by December 1, 2026, and must be submitted following a mandatory physical site visit. Evaluation is based on overall best value, and bidders must provide a detailed cost breakout and proof of insurance. For bids equal to or exceeding $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety company. This project is subject to the Davis-Bacon Act and Construction Wage Rate Requirements, necessitating the submission of weekly certified payroll reports for payment processing. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications, and requires a Unique Entity ID (UEI) for all bidders. Final acceptance is contingent upon a successful on-site inspection and the delivery of operation and maintenance manuals and NFPA 72 certification.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 561621
New
Federal
J012-- Fire Alarm Suppression Maintenance & Repair Services
Solicitation # 36C25627Q0041
Solicitation 36C25627Q0041 is a Request for Quotation issued by the Department of Veterans Affairs for fire alarm and fire suppression monitoring, detection, testing, maintenance, and repair services at the Southeast Louisiana Veterans Health Care System medical campus in New Orleans, Louisiana. The scope of work covers 17 buildings and a concourse, including the Administration Building, Central Energy Plant, Inpatient Building, and two Community Based Outpatient Clinics. The contractor is required to provide monthly monitoring, annual, semi-annual, and quarterly preventative maintenance, and unlimited 24/7 emergency services with a required on-site response time of two hours following notification of system trouble. All work must comply with NFPA 72 and other applicable standards, and technicians should be NICET III certified. This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 561621. The contract will be awarded using the lowest price, technically acceptable (LPTA) methodology, evaluating offers based on price fairness, a minimum of five years of relevant experience, and technical capabilities on a pass/fail basis. The base period of performance is from December 1, 2026, through November 30, 2027. Electronic quotes must be submitted to Marcus Sidney by November 4, 2026, at 10:00 a.m. CDT, and must be organized into three volumes: Price, Experience, and Technical Capabilities.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 22 hours ago

DEADLINE

in 15 days

General Info

NAICS

561621 - Security Systems Services (except Locksmiths)

Place of Performance

Nellis AFB, Creech AFB, Point Bravo, LAS VEGAS, NV, 89191, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jan 28, 2009 to Jan 29, 2009. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4861 99 Cons Lgc
Contacts2 people available
OfficeNELLIS AFB, NV, 89191-7063, USA
Office AddressNELLIS AFB, NV, 89191-7063, USA

Full Description

Show more
This is a combined synopsis/solicitation for a commercial item and is prepared in accordance with the format in FAR Subpart 12.6, as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Fire Suppression Systems Inspection & Repairs, is issued as a Request for Quotation (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-28. This Request for Quotation is a small business set-aside. The NAICS code applicable to this solicitation is 561621. The small business size standard under this NAICS code is 100 employees. The performance work statement is (attached below). Structure Contract Line Item Numbers (CLIN) as follows: BASE YEAR (Period of Performance: 1 Feb 09 - 31 Jan 10) CLIN 0001 - 1 Lot Annual Inspections Wet/Dry Chemical & Halon Fire Supression Systems, CLIN 0002 1 Lot Semi-Annual Inspections Wet/Dry Chemical & Halon Fire Supression Systems CLIN 0003 1 Lot - Emergancy Repairs Wet/Dry Chemical & Halon Fire Supression Systems OPTION YEAR 1 (Period of Performance: 1 Feb 10 - 31 Jan 11) CLIN 1001 -1 Lot Annual Inspections Wet/Dry Chemical & Halon Fire Supression Systems, CLIN 1002 - 1 Lot Semi-Annual Inspections Wet/Dry Chemical, Halon Fire Supression Systems CLIN 1003 - 1 Lot Emergancy Repairs Wet/Dry Chemical & Halon Fire Supression Systems OPTION YEAR 2 (Period of Performance: 1 Feb 11 - 31 Jan 12) CLIN 2001 - 1 Lot Annual Inspections Wet/Dry Chemical & Halon Fire Supression Systems, CLIN 2002 1 Lot Semi-Annual Inspections Wet/Dry Chemical & Halon Fire Supression Systems CLIN 2003- 1 Lot Emergancy Repairs Wet/Dry Chemical & Halon Fire Supression Systems OPTION YEAR 3 (Period of Performance: 1 Feb 12 - 31 Jan 13) CLIN 3001 - 1 Lot Annual Inspections Wet/Dry Chemical & Halon Fire Supression Systems, CLIN 3002 1 Lot Semi-Annual Inspections Wet/Dry Chemical & Halon Fire Supression Systems CLIN 3003 - 1 Lot Emergancy Repairs Wet/Dry Chemical & Halon Fire Supression Systems, OPTION YEAR 4 (Period of Performance: 1 Feb 13 - 31 Jan 14) CLIN 4001 -1 Lot Annual Inspections Wet/Dry Chemical & Halon Fire Supression Systems, CLIN 4002 - 1 Lot Semi-Annual Inspections Wet/Dry Chemical/Halon Fire Supression Systems CLIN 4003 - 1 Lot Emergancy Repairs Wet/Dry Chemical & Halon Fire Supression Systems Quotes should be in the following format; price each CLIN independently. Award Basis: Low Price Technically Acceptable, Past Performance, and Best Value. Federal Acquisition Regulation (FAR) provision 52.212-1, Instructions to Offerors-Commercial, applies to this solicitation - Submit quotation on company letterhead utilizing the format structure above and format outlined in FAR 52.212-1(b). Provide documents verifying your company's ability to meet the qualification standards stated in Section 1.1.1 of the PWS and provide copies of certification for suggested instructor(s). The following provisions apply to this solicitation: FAR provision 52.212-2 Evaluation-Commercial Items. The following factors will be used to evaluate the offer: Technical Capability (copies of certificates), Price, and Past Performance. In addition to the price list, offerors shall submit with their offer a completed copy of FAR provision 52.212-3, Offeror Representations and Certifications-Commercial Items with Alternate I, or have a current ORCA registration. The following clauses apply to this solicitation and resulting award: FAR 52.202-1 Definitions; FAR 52.203-3 Gratuities, FAR 52.203-7 Anti-Kickback Procedures, FAR 52.212-4, Contract Terms and Conditions-Commercial Items; FAR 52.212-5 (Deviation), Contract Terms and Conditions Required to Implement Statues or Executive Orders-Commercial Items [Defense Federal Acquisition Regulation Supplement (DFARS) Deviation]; FAR 52.219-6 Notice of Total Small Business Set-Aside, FAR 52.222-3, Convict Labor; FAR 52.222-21 Prohibition of Segregated Facilities, FAR 52.222-26, Equal Opportunity; FAR 52.222-35,Affirmative Action for Disabled Veterans and Veterans; FAR 52.222-36, Affirmative Action for Workers with Disabilities; FAR 52.222-37, Employment Reports on Special Disabled Veterans on the Vietnam Era, FAR 52.222-39 Notification Of Employee Rights Concerning Payment Of Union Dues Or Fees (Dec 2004), FAR 52.222-41 Service Contract Act of 1965, as Amended (Jul 2005), FAR 52.222-42 Statement of Equivalent Rate of Federal Hires, FAR 52.225-13, Restriction on Foreign Purchase; FAR 52.232-33, Mandatory Information for Electronic Funds Transfer Payment; FAR 52.233-1, Disputes; FAR 52.233-3, Protest After Award; FAR 52.233-4 Applicable Law for Breach of Contract Claim; FAR 52.237-2 Protection of Government Buildings, Equipments and Vegetation, FAR 52.247-34, FOB Destination; FAR 52.252-1, Provisions Incorporated by Reference; FAR 52.252-2, Clauses Incorporated by Reference; FAR 52.252-5, Authorized Deviations in Provisions; FAR 52.252-6, Authorized Deviations in Clauses; DFARS 252.203-7001, Prohibition on Persons Convicted of Fraud or Other Defense-Contract Felonies; DFARS 252.204-7003, Control of Government Personnel Work Product; DFARS 252.204-7004 Alt A, Required Central Contractor Registration; DFARS 252.212-7001 Dev, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items; DFARS 252.223-7001, Hazard Warning Labels; DFARS 252.225-7000, Buy American Cert; DFARS 252.225-7001, Buy American Act; DFARS 252.225-7002, Qualifying Country Sources as Subcontractors; DFARS 252.232-7003; Electronic Submission of Payment Request; DFARS 252.232-7010, Levies on Contract Payments; DFARS 252.243-7001, Pricing of Contract Modifications; DFARS 252.247-7023 Alt III, Transportation of Supplies by Sea, AFFARS 5352.201-9101 Ombudsman, AFFAR 5352.242-9000 Contract access to Air Force Installations. All contractors must be registered in the Central Contractor Registration (CCR) database to receive a DOD award or payment. Lack of registration in CCR will make an offeror ineligible for award. Information concerning clauses and provision incorporated by reference may be obtained at http://farsite.hill.af.mil. Quotes are due on or before 12:00 p.m., Pacific Daylight Time, on 29 January 2009. PERFORMANCE WORK STATEMENT FOR FIRE SUPPRESSION SYSTEMS INSPECTIONS & REPAIRS WET & DRY CHEMICAL & HALON FIRE SUPPRESSION SYSTEMS. 1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment and labor necessary to perform Fire Suppression and Protection Systems Inspections at Nellis Air Force Base for Wet & Dry Chemical & Halon Systems in a manner that will ensure their serviceability and operation. The systems are described in Technical Exhibit 1. 1.1. INITIAL STATUS REPORT. The contractor and the Quality Assurance Personnel (QAP) shall review the current inspection, test, and maintenance status of all installed fire suppression and protection systems included in this contract at the initial inspection. The contractor shall submit a documented report to the QAP on all installed fire extinguishing or automatic fire alarm system's Wet & Dry Chemical & Halon Systems inspections, test or maintenance work, noting discrepancies, system impairments and recommendations, within (5) calendar days after the inspection. 1.2. INSPECTIONS. The contractor shall inspect installed fire suppression and protection systems inspections IAW applicable NFPA Standards and manufacturer's instructions. Any discrepancies or impairments to an installed fire suppression systems discovered during a scheduled inspection and any repair required will be presented to the quality assurance person with quotes of repair cost for items discovered during inspections. All repair cost will be verified and evaluated by the Quality Assurance Person (QAP), after approval, the repair cost will be paid with the Government Purchase Card (GPC) upon completion. Any repairs exceeding the GPC approval limit, would be billed under the contract emergency repair CLIN. 1.3. TESTING. The contractor shall perform functional operation tests on installed fire suppression and protection systems IAW applicable NFPA Standards and manufacturer's instructions. 1.4. REPORTS. The contractor shall submit to the QAP a complete report of all inspection and testing accomplished under this contract within ten (10) work days. The reports shall include a record of conditions found, repairs, recharging, and all replacement parts used. All records, documents, and associated papers provided to the Government or generated during the period of this contract become government property and will be returned to the government upon contract termination or completion. During the contract period, all records, documents, and associated papers will be available for Government review. 1.5. EMERGENCY SERVICES. The contractor shall be required to return the fire suppression system (Wet & Dry Chemical & Halon System ) to an operational status, to include, but not limited to replacing fusible links, detection systems and releasing devices, after a discharge (accident or system failure) or leakage of the fire suppression system. All fire emergency system must be repaired and returned to normal operating condition within a six (6) hour time frame after the contractor receives the authorization to proceed with the noted repair cost. 1.6. ENVIRONMENTAL PROTECTION. The contractor shall ensure that the purchase, use, handling, storage, and disposal of all toxic, hazardous and special materials and wastes are in accordance with federal, state, and local environmental protection regulations 1.6.1 A close recovery system is required for recovery of HALON 1301 fire extinguishing agent . 1.7. GENERAL. The contractor shall provide fire suppression and protection systems inspection services to meet the completeness, quality, and frequency requirements set forth in this PWS. The fire suppression and protection systems protect critical range support and communications computers, and personnel. Technical Exhibit 1 describes each system. SERVICES SUMMARY FOR FIRE SUPPRESSION SYSTEM INSPECTIONS & REPAIR WET & DRY CHEMICAL & HALON FIRE SUPPRESSION SYSTEM. Performance Objective PWS Para Performance Threshold Perform Initial Status Check and Inspections. (Wet & Dry Chemical & Halon Systems). All reports accurately submitted on time. Inspections are performed and submitted within the 5 or 10 calander days. 1.1. & 1.2. Every fire protection system must be checked and inspected 100% of the time. Perform Operational Tests, Preventive, and Corrective Maintenance of Fire Protection Systems, (Wet & Dry Chemical & Halon Systems.) Operational tests are performed and recorded. Recharging is performed when necessary. Discrepancies are noted. Repairs are made IAW para 1.2 in the PWS. 1.2 1.3. 1.4. Fire protection systems are operational 100%of the time. Emergency Services. (Wet & Dry Chemical & Halon System.) 1.5. Repairs are completed within six (6) hours, after approval is given by the QAP to proceed. Any additional repair time must be approved by the QAP, 100 % of the time. 2. GENERAL INFORMATION. 2.1. QUALITY CONTROL. The Contractor shall develop, maintain, submit a quality control plan that ensures maintenance and repair services are performed in accordance with the NFPA Standards 11 through 17 and 72 and the manufacturer's instructions. The contractor shall develop and implement procedures to identify and prevent defective services from reoccurring, this plan must be submitted to the government for acceptance thirty (30), days after contract award date. 2.2. QUALITY ASSURANCE. The government shall evaluate the contractor's performance by appointing a representative(s) to monitor performance to ensure services are received as specified. The government representative will evaluate the contractor's performance through accompanied on-site inspections of the contractor's quality control program and receipt of complaints from base personnel. 2.3. HOURS OF OPERATION. 2.3.1. Normal Hours of Operation. The contractor shall perform the services required under this contact during the following hours: 7:00 AM - 4:00 PM, Monday through Friday. (See par. 2.3.1.1. for possible exceptions.) 2.3.1.1. Holidays. The contractor is not required to provide service and shall not be scheduled on the following days: New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran's Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December 2.3.1.2. Performance Schedule. The Initial inspections shall be performed during the months of February 2009 and in February 2010 of subsequent option years. The semiannual inspection shall be performed during the month of August in the basic year and all options years. 2.3.1.3. The 99th CEOESS Contract Quality Assurance Person and The Base Fire Department's Technical Service Office Quality Assurance Person (QAP) will be notified of the work schedule produced by the contractor not later than fifteen (15) days prior to performance of inspections. The schedule will list building number, description of installed equipment, date, and time service. The contractor shall coordinate with the Fire Department Technical Service Office (99 CES/CEFB) QAP's a minimum of 24 hours prior to commencement of any inspection or repair of any fire suppression system. 2.3.1.4 Work shall be scheduled on continual days during the week to cause the least impact to building occupants. All Wet & Dry Chemical & Halon Systems shall be inspected IAW: par 1.1 & par 1.2., and all repairs will be approved by the Quality Assurance Person, however the schedule may be altered due to security or mission requirements. Changes to the schedule may be requested by either party at least twenty-four (24) hours in advance except work scheduled in restricted areas, Restricted area work schedules changes require forty-eight (48) hours notice.. 2.3.1.5. Re-performance Schedule. Any re-performance shall be scheduled with the QAP, subject to the approval of the building manager, to occur as soon as possible and cause minimal disruption to building occupants. 2.4. SECURITY REQUIREMENTS. 2.4.1. Contractor shall obtain a Visitor/Vehicle Pass and employee ID through the base contracting office at the time of the contract award date. 2.4.2. Restricted Area Entry. Some systems are located in restricted areas and require advanced notice to gain entry. The contractor shall provide on company letterhead the full name (with middle initial and no nick names) and social security number (SSAN) of the individual(s) performing the work, driver's license number and state where issued, make, model, color, license number of the vehicle used and company phone number. This information shall be provided to the Contracting Officer / and the 99 CES/CEOES Quality Assurance Person or his/her designated representative not later than 2 weeks prior to scheduled work so that the Contracting Officer or the Quality Assurance Person can request access to restricted areas. Personnel are required to have at least (2) forms of identification in their possession: both must list the individual's SSAN and at least one must include the individual's picture. Some delays may be encountered in gaining access and leaving these areas even with prior coordination. Contractor personnel and vehicles will be under armed escort in restricted areas and are subject to being "frisked" or searched before and after entry to restricted area upon leaving restricted area. 2.5. SPECIAL QUALIFICATIONS. 2.5.1. The contractor shall make sure employees have the following current and valid professional certification before starting work under this contract. Nevada State Fire Marshal license to inspect fire suppression systems and Nevada State Fire Marshal certificate of registration shall be presented to the Contracting Officer at the Post Award Conference. Each technician performing work on this contract shall be licensed by the Nevada State Fire Marshall. Technician(s) must be able to read, write, speak, and understand English. 2.5.2. Individuals working on installed systems shall have successfully completed technical training covering the theory and operation of the systems. Training may be conducted by the manufacturer or nationally recognized training institution. Training shall cover all aspects of the system, including, but not limited to, electrical system operation, troubleshooting, and maintenance procedures. Individuals should be able to establish that he/she has read and understands all National Fire Protection Association Code (NFPA) sections that pertain to work performed on this contract. NFPA sections include but are not limited to 12A, 17 and 17A. The contractor shall provide certification that individual(s) are currently licensed with the state in which the work is to be performed. 2.5.3. Individuals performing work on this contract shall be proficient in the operation of all equipment including special measuring devices (calibrators) used to determine the weight of agent in containers. All equipment shall be used in accordance with manufacturers specifications. 2.5.4. For certification and licensing, the Nevada State Fire Marshall requires the contractor and employees to pass an examination. The contractor is also required to be properly equipped to inspect fire suppression and protection systems. 2.5.5. Certifications and licenses issued by Nevada State Fire Marshal, or any other state fire certifications and license issue, are requirements to perform fire suppression and protection systems inspections. GOVERNMENT FURNISHED PROPERTY AND SERVICES. 3.1. GOVERNMENT- FURNISHED SERVICES. 3.1.1. Government Furnished Halon Agent / Chemicals. The government will be responsible for providing the contractor with HALON 1301 fire extinguishing agent / chemicals for all Halon fire suppression systems. 3.1.2. Government-Furnished Utilities. The government shall provide the following utilities to the contractor in order to perform services in accordance with this Performance Work Statement (PWS); electricity, water and sewage. 3.1.3. Telephone Services. "Class C" telephone service (local calls only) shall be provided for official business pertaining to this contract. 3.1.4. Security Police and Fire Protection. Emergency Phone numbers: Security Police 116, Fire 117, Civil Engineering 652-1856 (between 4:30 PM and 6:00 AM), Fire Department Technical Services 652-9627, 99th CES Quality Assurance Personnel 652-9178. CONTRACTOR FURNISHED PROPERTY AND SERVICES 4.1. GENERAL. Except for those items or services specifically stated in paragraph three (3) as government furnished, the contractor shall furnish everything in this contract according to all its terms. 4.2. EQUIPMENT. 4.2.1. All electrical equipment used by the contractor shall be Underwriter's Laboratories approved. This equipment must operate using existing building circuits. It shall be the responsibility of the contractor to prevent the operation or attempted operation of the electrical equipment, or combinations of equipment that require power exceeding the capacity of existing building circuits. 4.2.2. All equipment shall comply with applicable safety standards. All equipment not meeting safety standards shall be replaced, modified and/or repaired by the contractor at his/her expense and be acceptable to the government before work commences. 4.2.3. Calibrating devices(s) shall be NFPA approved. 4.3. UNIFORMS. The contractor shall provide a standard uniform for contractor employees with name of employee and company logo clearly spelled out. 4.4. CONTRACTOR FURNISHED MATERIALS / REPLACEMENT PARTS, WET & DRY CHEMICALS SYSTEM 4.4.1. Fusible Links, Current year fusible links (National Fire Protection Association) NFPA 17A, par. 5.3.2.) shall be furnished and installed by the contractor as required per (NFPA 17 A, par, 5.3.2.) at no additional cost to the government. 4.4.2. O-Rings. Replacements for worn out o-rings shall be furnished and installed by the contractor, at no additional cost to the government. 4.4.3. Nozzle Caps and Cables. Replacements for worn, deteriorated or missing nozzle caps and attachment cables shall be furnished and installed by the contractor, at no additional cost to the government. 4.4.4. Replacement Chemical. Replacement wet / dry chemical and Halon suppressant shall be in accordance with NFPA and manufacturer requirements whichever is more stringent. It is essential to use only the chemical for which the system was designed. Competitive brand of the same dry chemical agent may not be interchangeable. Also, different types of wet / dry and halon chemical agents shall not be mixed since that may cause adverse chemical reactions. Contractor shall furnish all Wet & Dry Replacement Chemicals. 5. 1. CONTRACTOR RESPONSIBILITIES. 5.1.2. Electric service shall not be interrupted without prior coordination with the QAP and building occupants. 5.1.3. Damage. The contractor assumes full responsibility for any and all government property damaged in whole or part from negligent acts or omissions by the contractor, subcontractor or any employee, agent or representative of the contractor. The contractor shall repair or reimburse the government for any and all damage of whatever kind to any and all government property associated with the performance of this service. For example, if the contractor, during a work performance causes a system to discharge, he/she shall perform all tasks necessary to repair all damages associated with the discharge at no cost to the government. All repairs shall be in accordance with NFPA and manufacturer requirements. 5.1.4. Service Certification 5.1.4.1. Systems Inspection Reports. The contractor shall provide and submit the following written reports to the Contracting Officer or his/her designated representative within 48 hours after completion of each inspection. The report shall list the contract number and identify each system by contract line number, building number. The report shall include the date of inspection, bottle serial number nomenclature, components tested/checked, tests performed, results of tests listing all unit defects and recommendations for repair. A. Dry Chemical System Service report (NFPA 17, 9-3.1) B. Wet Chemical System Service Report (NFPA 17A, 5-3.1) C. Halon System Service Report (NFPA 12A,4-1.1) 5.1.4.2. Service Tags. Upon completion of all work, the contractor, shall attach a tag at his / her expense, indicating the name of the company, name and certificate number of technician performing service, date work was completed, month and year when next service shall be performed, and frequency of service for the system (i.e., semiannual). The contractor shall attach the tags so that it is readily visible. 5.1.5. Hydrostatic Testing. The contractor shall hydrostatically test extinguishers as specified in the manufacturer's recommendations at no extra cost to the government. The contractor shall attach a sticker/plate identifying pertinent information on all extinguishers that pass the test. Extinguishers that fail the hydrostatic test shall be identified and shall be returned to the Government. 5.5.1. Warranty. Contractor shall offer the government a minimum of a 90-day warranty period for all work accomplished under this contract. 5.6. WET AND DRY CHEMICAL EXTINGUIISHING SYSTEMS. Are located in food service facilities. Each system is described in Technical Exhibit 1. 5.6.1. HALON FIRE EXTINGUISHING SYSTEMS , are located in Technical Exhibit 1. Bldg 61637 and Bldg 61663 5.6.2. Annual Inspections. Wet & Dry Chemical annual inspections performed during the month of February 2009 and in February 2010 of all subsequent option years. Annual inspections shall include as a minimum, all requirements by the NFPA 17,9-3-2. Semi -Annual Inspections Wet & Dry Chemical, will be scheduled in August 2009 of all subsequent option year. 5.6.3. Annual Inspections: Halon Fire Systems annual inspections performed during the months of February 2009 and in February 2010 of all subsequent option year. Annual inspections and testing shall include all suitable test to ensure the system is in full operational conditions, as indicated in (NFPA 12A, 4-1-3). 5.6.4. Semiannual Inspections. Halon Fire Systems Inspections performed during the month of August 2009. Semiannual inspections shall include as a minimum requirements of (NFPA 12A, 4-1-3 ). 6. APPENDICES Appendix A: Technical Exhibit 1. Type of Wet & Dry Chemical fire suppression equipment installed & bldg locations. 2. Type of Halon Fire Suppression System equipment & bldg location. Appendix B: Locations and Site Plan APPENDIX A TECHNICAL EXHIBIT 1 WET & DRY CHEMICAL FIRE SUPPRESION SYSTEM. TYPE AND MODEL OF FIRE SUPPRESSION EQUIPMENT INSTALLED AND BUILDING LOCATION. BUILDING: 300 ORGANIZATION: BOWLING ALLEY Control Panel: Simplex 4001 Cylinder Make: Ansul Co/R-102 Chemical Type: Wet Cylinder Size: 3 Gal Serial Number: 97782 Hydro: 1987 Number of Nozzles: 3 Fusible Links #Temp: 3/500 Cylinder Location: Storage room right side of hood Appliance Arrangement: Griddle-Char broiler-Fryer Manual releases: 1 Remarks: None BUILDING: 324 ORGANIZATION: ENLISTED CLUB Control Panel: Monaco FCI Cylinder Make: Ansul Co/R-101 Chemical Type: Dry Cylinder Size(s): 30 Lbs Each Serial Number: 41567 Hydro: 1992 Serial Number: No Cover Hydro: 1986 Number of nozzles: 4 for Char broiler + 6 others Fusible Links #/Temp: 2/360 Cylinder Location: Inside kitchen hood Appliance Arrangement: Fryer-Range-Broiler-Griddle-Oven Manual Releases: 1 Remarks: 1 System with 2 Cylinder BUILDING: 324 ORGANIZATION: ENLISTED CLUB Control Panel: Monaco FCI Cylinder Make: Ansul Co/R-102 Chemical Type: Wet Cylinder Size(s): 3 Gal Serial Number: 73571 Hydro: 1986 Number of nozzles: 6 Fusible Links #/Temp: 2/360 Cylinder Location: Right side of serving line hood Appliance Arrangement: Fryer-Griddle-Range Manual Releases: 1 Remarks: None BUILDING: 554 ORGANIZATION: OFFICER'S CLUB Control Panel: Simplex 4002 Cylinder Make: Ansul Co/R-102 Chemical Type: Wet Cylinder Size(s): 3 Gal Serial Number: 118597 Hydro: 1989 Number of nozzles: 7 Fusible Links #/Temp: 6/450 Cylinder Location: Kitchen North wall near backwash panels Appliance Arrangement: Kitchen main hood-see below Manual Releases: 1 Remarks: Salamander-Burner-Hot tops-Fryers (3)-Tilt Skillet-Steamers (2) BUILDING: 554 ORGANIZATION: OFFICER'S CLUB Control Panel: Simplex 4002 Cylinder Make: Ansul Co/R-102 Chemical Type: Wet Cylinder Size(s): 1.5 Gal Serial Number: 05442 Hydro: 1989 Number of nozzles: 2 Fusible Links #/Temp: 2/450 Cylinder Location: Kitchen wall near backwash panels Appliance Arrangement: Kitchen back hood ovens (3) Broiler Manual Releases: 1 Remarks: None BUILDING: 554 ORGANIZATION: OFFICER'S CLUB Control Panel: Simplex 4002 Cylinder Make: Ansul Co/R-102 Chemical Type: Wet Cylinder Size(s): 3 Gal Serial Number: 128634 Hydro: 1989 Number of nozzles: ? Fusible Links #/Temp: 2/500 & 2/450 Cylinder Location: Kitchen North wall near server door Appliance Arrangement: Server Griddle-Broiler-Fryer (2) Manual Releases: 1 Remarks: None BUILDING: 567 ORGANIZATION: MOUNTAIN VIEW INN Control Panel: Monaco Vulcan Cylinder Make: Kidde/HDR Chemical Type: Dry Cylinder Size(s): 25 Lbs Number of nozzles: 4 Fusible Links #/Temp: 2/450 Cylinder Location: Kitchen South wall-left side Appliance Arrangement: Serving line left griddle Manual Releases: 1 Remarks: None BUILDING: 567 ORGANIZATION: MOUNTAIN VIEW INN Control Panel: Monaco Vulcan Cylinder Make: Kidde/HDR Chemical Type: Dry Cylinder Size(s): 25 Lbs Serial Number: 88582 Hydro: 1981 Number of nozzles: 6 one side 2 on other Fusible Links #/Temp: 4/450 & 1/450 Cylinder Location: Kitchen South wall--right side Appliance Arrangement: Fryer-Oven-Tilt skillet Manual Releases: 1 Remarks: None BUILDING: 567 ORGANIZATION: MOUNTAIN VIEW INN Control Panel: Monaco Vulcan Cylinder Make: Kidde/HDR Chemical Type: Dry Cylinder Size(s): 25 Lbs Serial Number: 32456 Hydro: 1981 Number of nozzles: 4 Fusible Links #/Temp: 2/450 Cylinder Location: Kitchen South wall- -right side Appliance Arrangement: Serving line right griddle Manual Releases: 1 Remarks: None BUILDING: 601 ORGANIZATION: CHILD DEVELOPMENT CENTER Control Panel: Notifier Cylinder Make: Ansul Co/R-101 Chemical Type: Dry Cylinder Size(s): 20 Lbs Serial Number: 252328 Hydro: 1986 Number of nozzles: 4 Fusible Links #/Temp: 1/360 & 1/450 over fryer Cylinder Location: Near front kitchen entrance Appliance Arrangement: Burner-Griddle-Fryer Manual Releases: 1 Remarks: None BUILDING: 790 ORGANIZATION: CROSS WINDS INN Control Panel: Simplex 4002 Cylinder Make: Range Guard Chemical Type: Wet Cylinder Size(s): 2.5 Gal Serial Number: 9135PG7 Hydro: 1988 Number of nozzles: 3 one side & 1 on other Fusible Links #/Temp: 2/? & 1/? Cylinder Location: Kitchen East wall Appliance Arrangement: Fryer (2)-Tilt Skillet-Oven Manual Releases: 1 Remarks: None BUILDING: 790 ORGANIZATION: CROSS WINDS INN Control Panel: Simplex 4002 Cylinder Make: Range Guard Chemical Type: Wet Cylinder Size(s): 2.5 Gal Serial Number: 13039PG7 Hydro: 1988 Number of nozzles: 4 Fusible Links #/Temp: 3/500 Cylinder Location: Right side of left server hood Appliance Arrangement: Server left char broiler Manual Releases: 1 Remarks: None BUILDING: 790 ORGANIZATION: CROSS WINDS INN Control Panel: Simplex 4002 Cylinder Make: Range Guard Chemical Type: Wet Cylinder Size(s): 2.5 Qt Serial Number: 5976PG7 Hydro: 1988 Number of nozzles: 2 Fusible Links #/Temp: 2/360 or 500 Cylinder Location: Right side of right serving line hood Appliance Arrangement: Server right griddle Manual Releases: 1 Remarks: None BUILDING: 1619 ORGANIZATION: GOLF COURSE CLUB HOUSE Control Panel: Notifier Cylinder Make: Ansul Co/R-102 Chemical Type: Wet Cylinder Size(s): 2 at 3 Gals Each Serial Number: 97179 Hydro: 1987 Serial Number: No Cover Hydro: 1987? Number of nozzles: 3 Fusible Links #/Temp: 3/360 Cylinder Location: Storage Room Appliance Arrangement: Fryer-Griddle-Fryer Manual Releases: 1 Remarks: 1 Hood, 1 System with 2 Cylinders BUILDING: 10206 ORGANIZATION: RED HORSE DINING HALL Control Panel: Notifier Cylinder Make: Ansul Co/R-102 Chemical Type: Wet Cylinder Size(s): 3 Gal Serial Number: 34506 Hydro: 1985 Number of nozzles: 2 Fusible Links #/Temp: 3/360 Cylinder Location: End of kitchen hood Appliance Arrangement: Kitchen Fryer-Tilt Skillet Manual Releases: 1 Remarks: None BUILDING: 10206 ORGANIZATION: RED HORSE DINING HALL Control Panel: Notifier Cylinder Make: Ansul Co/R-102 Chemical Type: Wet Cylinder Size(s): 3 Gal Serial Number: 130447 Hydro: 1987 Number of nozzles: 2 Fusible Links #/Temp: 3/360 Cylinder Location: Inside server hood Appliance Arrangement: Server griddle Manual Releases: 1 Remarks: 1 Hood, 1 System with 2 Cylinders BUILDING: P-71 ORGANIZATION: INDIAN SPRINGS AFAF DINING HALL Control Panel: Monaco Cylinder Make: Safety First/ARS10A Chemical Type: Dry Cylinder Size(s): 10 Lbs Serial Number: 20293 Hydro: 1986 Number of nozzles: 2 Fusible Links #/Temp: 1/360 Cylinder Location: Rear wall Appliance Arrangement: Fryer-Steamer-Griddle Manual Releases: 1 Remarks: None BUILDING: P-71 ORGANIZATION: INDIAN SPRINGS AFAF DINING HALL Control Panel: Monaco Cylinder Make: Safety First/M.M. Chemical Type: Dry Cylinder Size(s): 2.75 Lbs Serial Number: 06810 Hydro: 1988 Number of nozzles: 2 Fusible Links #/Temp: 1/360 Cylinder Location: Left of kitchen hood Appliance Arrangement: Fryer-Steamer Manual Releases: 1 Remarks: None BUILDING: 2279 ORGANIZATION: RANGE 63, POINT BRAVO Control Panel: Ansul Cylinder ...

More opportunities from Department Of Defense → FA4861 99 Cons Lgc

Same awarding agency

NAICS: 561410
New
Federal
FA486127R0001 Sources Sought: Tactical Manuals
Solicitation # FA486127R0001
Solicitation FA486127R0001 is a Sources Sought Notice and Request for Information issued by the Department of Defense for the USAFWC/A9 to conduct market research for the production of tactical manuals. The requirement involves providing non-personal services to produce foreign tactics manuals, tactics-related documents, and Subject Matter Expert expertise for approximately 50 countries and 27 Mission Design Series, totaling roughly 342 TTP manuals. This includes the creation of draft and final manuals, Flash Bulletins, and Tactics Bulletins, with a typical revision cycle of every two to three years. The project requires strict adherence to DAFMAN 16-201 and AFMAN 16-101 regarding foreign disclosure and technology transfer, as well as Secretary of the Air Force disclosure guidance. The work is primarily based at Nellis Air Force Base in building 1114 or a facility with equivalent security apparatus, with telework permitted on a case-by-case basis. Due to the sensitive nature of the materials, the contractor must maintain a Top Secret/SCI facility clearance, and personnel must hold at least a Secret clearance, with specific roles requiring Top Secret/SCI eligibility. Key deliverables include draft files due within 45 business days of tasking, final products within 15 business days of review, and digital updates to websites within 30 business days. This opportunity is designated as a Total Small Business Set-Aside. Interested firms must submit their company information, business size, RFP response timelines, and transition estimates to Amber Rivera by October 29, 2026.
Document Preparation Services

POSTED

6 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS