This Solicitation opportunity from Department Of Defense was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
FITTING ASSEMBLY
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract requires the supply of a FITTING ASSEMBLY, RUDDER with NSN 1560-01-297-1439 under solicitation SPE4A7-26-T-393L, issued by the Defense Logistics Agency Aviation, ASC Supplier Oper AE and AF Division. The procurement is a non-set-aside RFQ with a priority rating of DO-A1, and deliveries are due 530 days after contract award under FOB Origin terms, with inspection and acceptance also occurring at origin. The contractor must deliver three units of the item within 90 calendar days of contract award for First Article Testing at the Critical Item Management facility in San Diego, California, with the Government required to issue written notification of approval, conditional approval, or disapproval within 120 days of receipt. Production Lot Testing follows First Article approval and requires the contractor to provide samples to the same San Diego location, marked “Production lot samples – do not post to stock,” with full documentation including signed DD Form 1222 and DD250/IRAPT reports, test results, material certifications, and a prepaid return label. The contractor must price the Production Lot Testing CLIN to cover the cost of samples consumed during Government testing. All products must be manufactured under a quality management system compliant with SAE AS9100 or an equivalent standard and inspected per MIL-STD-1916, ASQ H1331, or a comparable zero-based sampling plan with zero non-conformances required for critical items. Packaging and marking must adhere strictly to MIL-STD-2073-1E and MIL-STD-129, including CAGE codes, part numbers, lot numbers, and special markings in exact compliance with defined codes and formats. The contractor must maintain current representations and certifications in the System for Award Management, including small business status, women-owned and economically disadvantaged women-owned business status, and must disclose usage of covered defense telecommunications equipment. The contract incorporates numerous FAR and DFARS clauses governing cybersecurity, whistleblower protections, disclosure of information, prohibitions on mandatory arbitration, and handling of hazardous materials in accordance with 29 CFR 1910.1200. Invoicing and payment processing must be conducted through WAWF in compliance with DFARS Appendix F and FAR 52.216-7, with all documentation properly formatted and submitted.
General Info
Agency
NAICS
Place of Performance
3581 CUMMINGS ROAD BLDG 3581, SAN DIEGO, CA, 92136-3581, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – GOVERNMENT TESTING REQUIRED (FAR 52.209-4 AND
ALT I)
THE CONTRACTOR SHALL DELIVER 3 UNIT(S) OF
LOT/ITEM 1560 / 12971439
WITHIN 90 CALENDAR DAYS FROM THE DATE OF
THIS CONTRACT TO THE GOVERNMENT AT THE LOCATION SPECIFIED BELOW FOR
FIRST ARTICLE TESTS.
N50189
CRITICAL ITEM MANAGEMENT
PHONE 619-545-0234
ATTN: FIRST ARTICLE COORDINATOR
BLDG 378, 2ND FLOOR RM 2403
SAN DIEGO
CA
92135
CRITICAL ITEM MANAGEMENT
WITHIN 120 CALENDAR DAYS AFTER THE GOVERNMENT
RECEIVES THE FIRST ARTICLE, THE CONTRACTING OFFICER SHALL NOTIFY THE
CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR
DISAPPROVAL OF THE FIRST ARTICLE.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
SPE4A7-26-T-393L
SECTION A
(4) The contractor shall ship the PLT samples by traceable means to:
FRCSW NAS NORTH ISLAND, CA N50189 CRITICAL ITEM MANAGEMENT PHONE 619-545-0234 ATTN: FIRST ARTICLE COORDINATOR BLDG 378, 2ND FLOOR RM 2403
SAN DIEGO CA 92135 CRITICAL ITEM MANAGEMENT
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 60 test plus 90 NSN/Part Number: 1560-01-297-1439 Quantity: 2 EA Purchase Request: 7016846153QTY: 2 Delivery: 530 days ADO
More opportunities from Department Of Defense → ASC SUPPLIER OPER AE AND AF DIV
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
