Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fl Dock Headblock Reconstruction Flower's Cove - Newfoundland

Closed
30008162International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 3 hours ago

DEADLINE

in 30 days

AI Contract Overview

Show more

The contract involves the reconstruction of a floating dock headblock at Flower’s Cove, Newfoundland and Labrador, under the authority of the Department of Fisheries and Oceans, Government of Canada. The scope requires full procurement and execution of demolition and removal of the existing north-side floating dock crib and gangway, with all debris properly disposed of at a provincially approved waste facility. This is followed by the supply and installation of a new floating dock crib and gangway, along with the placement of armour stone to provide structural protection and stability. Bidders are strongly urged to conduct an independent site visit prior to submission to assess site conditions, access routes, weather exposure, soil characteristics, and logistical challenges, with the understanding that any failure to do so will not justify adjustments to the bid or contract terms. All work must be completed within sixteen weeks of contract award, and bidders are responsible for ensuring compliance with safety protocols during site visits and throughout project execution. The solicitation number is 30008162, with bids due by July 31, 2026, and the contracting authority is Shawna Hamilton.

General Info

Reconstruct floating dock headblock in Flower’s Cove, demolish old structure, install new crib and gangway, place armour stone, complete in 16 weeks.

Agency

Government of Canada → Department of Fisheries and OceansView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(2)

Solicitation 30008162 - Request for Qualifications for Floating Dock Head at Flower's Cove

PDFrfq

RFQ 30008162 - FI Dock Headblock Reconstruction Flower's Cove

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of Fisheries and Oceans
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Department of Fisheries and Oceans
View Agency Profile
Office AddressN/A
Contacts
Shawna HamiltonContracting Authority

Full Description

Show more
STATEMENT OF WORK TITLE: Floating Dock Headblock Reconstruction – Flower’s Cove, Newfoundland and Labrador LOCATION: Flower’s Cove, Newfoundland and Labrador DESCRIPTION OF THE PROJECT: The scope of work for this project is the furnishing of all plant, labour, equipment and material for floating dock headblock reconstruction at Flower’s Cove, Newfoundland In general, the work under this contract includes, but is not necessarily limited to, the following: 1. Demolition and removal — Removal of the existing north side floating dock crib and gangway. All demolition materials must be disposed of at a provincially approved waste disposal facility 2. New floating dock headblock installation — Supply and installation of a new floating dock crib and gangway 3. Armour stone installation — Supply and installation of armour stone FAMILIARIZATION WITH SITE Before submitting a bid, it is recommended that bidders visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature and extent of the work, materials necessary for the completion of the works, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. The Contractor must perform and complete the work under this project within sixteen (16) weeks of contract award.

More opportunities from Government of Canada → Department of Fisheries and Oceans

Same awarding agency