Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

FL-GREAT WHITE HERON NWR POLE BARN ROOF REPLACEMEN

Open
140FF027Q0078Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Fish and Wildlife Service is soliciting quotes for a pole barn roof replacement and structural repairs at the Great White Heron National Wildlife Refuge in Big Pine Key, Florida. The project involves the complete demolition and disposal of the existing roofing system and the installation of a new aluminum 5v crimp metal roofing system using 30-foot lengths to eliminate overlaps. The contractor must ensure the roof is fully weatherproofed and structurally sound, adhering to local, state, and national building codes, as well as OSHA safety standards. Key deliverables include a construction quality control plan, a submittal register, and manufacturer warranties. Final acceptance is contingent upon a final magnetic sweep of the area to ensure all debris, screws, and nails are removed. This is a Small Business Set Aside - Total procurement conducted under simplified acquisition procedures, resulting in a Firm-Fixed-Price completion construction purchase order. Award will be granted to the responsible quoter who is responsive to the solicitation and offers the lowest overall total price. The period of performance is estimated from February 8, 2027, to July 8, 2027, with a total completion timeframe of 150 calendar days from the notice to proceed. Contractors are required to submit Davis-Bacon certified payrolls and must process all payment requests electronically through the Invoice Processing Platform System.

General Info

Roof replacement and structural repairs for Great White Heron National Wildlife Refuge.

NAICS

238160 - Roofing Contractors

Place of Performance

VA

Set-Aside

SBA

Documents

4
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstwage-determination
High

Read all 4 documents

Due in 35 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 35 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 4 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Fws Contracting Activity
Contacts1 person available
OfficeFalls Church, VA, 22041, USA

Full Description

Show more
FL-GREAT WHITE HERON NWR POLE BARN ROOF REPLACEMENT

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
SLED
SB-10994_ST. AMANT HIGH SCHOOL ROOF REPLACEMENT PHASE II (GOLD DOME RESTORATION)
Solicitation # SB-10994
The St. Amant High School Roof Replacement Phase II (Gold Dome Restoration) is a construction project managed by the Ascension Parish Schools in Louisiana. The scope of work includes the restoration of the gold dome, applying a custom-colored silicone roof coating to a specific dry film thickness, repainting the building exterior, performing interior touch-up painting, and replacing wood windows with new storefront windows or wall infill. Additionally, the project involves installing doors for large equipment passage into the gym area and paving a portion of an existing grass area. The contract is governed by the AIA Document A201-2017 General Conditions of the Contract for Construction and requires a manufacturer's 10-year warranty for the roof coating. The solicitation was posted on November 19, 2026, with a response deadline of December 17, 2026, and a mandatory pre-bid conference scheduled for December 8, 2026. Award determination is based on the lowest bidder, calculated as the sum of the base bid and any accepted alternates. Bidders must provide a bid security of at least 5% of the base bid and all additive alternates. Required documentation includes a non-collusion affidavit, E-Verify affidavit, and a contractor's attestation clause. There is no set-aside status specified for this contract.
Ascension Parish Schools

POSTED

about 2 hours ago

DEADLINE

in 28 days
View Details

More opportunities from Department Of The Interior → Fws Contracting Activity

Same awarding agency

NAICS: 541620
New
Federal
OR-MALHEUR NWR-STUBBLE FIRE SEEDING PROJ
Solicitation # 140FF027Q0096
The U.S. Fish and Wildlife Service is soliciting a firm-fixed-price contract for a cultural resource inventory to support Section 106 compliance for the Stubble Fire Emergency Stabilization Seeding Project within the Malheur National Wildlife Refuge. The contractor is responsible for providing all personnel, equipment, and GIS capabilities to conduct background research for a 981-acre Area of Potential Effects and an intensive pedestrian inventory of approximately 901 acres using 20-meter transects. All work must adhere to the Secretary of the Interior’s Standards and Guidelines for Archeology and Historic Preservation, as well as Oregon SHPO and National Register standards. Key deliverables include a preliminary findings summary due January 4, 2027, a draft Section 106 report by March 1, 2027, and a final report with GIS shapefiles and metadata by April 2, 2027. This procurement is a Small Business Set Aside - Total. Award evaluation will prioritize non-price factors, with Technical Approach and Relevant Experience being the most significant, followed by Key Personnel Qualifications and Past Performance. The contractor must provide a Project Manager, Principal Investigator, and Field Supervisor who meet the professional qualification standards per 36CFR61. Performance will be measured by the quality of the final Archaeological Monitoring report and the timely receipt of weekly briefing statements, with a requirement for GPS positional accuracy within +/- 3 meters. The period of performance generally spans from November or December 2026 through April 2027.
Environmental Consulting Services

POSTED

1 day ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS