The City of St. Petersburg is soliciting bids for Project No. 25143-130, which involves the installation of a new emergency backup generator at the City's Fleet Management Complex. The primary objective is to provide full backup power for up to 48 hours during utility outages to support half of the complex buildings. The core scope of work includes the installation of a 300KW generator with a weatherproof enclosure, subbase fuel tank, annunciator panel, and an automatic transfer switch, along with all necessary electrical distribution and potential underground utility rerouting. Additionally, the project includes Alternate 1 for a concrete masonry wall enclosure with access gates and lightning protection, and Alternate 2 for a 200-amp panel replacement for the adjacent Radio Shop.
The contract will be awarded to the lowest responsible and responsive bidder, with evaluation factors including capacity, qualifications, past performance, and compliance with OSHA and labor laws. Performance must begin within 10 calendar days of the Notice to Proceed, with substantial completion required within 420 calendar days and final completion within 30 days of the punch list delivery. Key requirements include adherence to the Davis-Bacon Act, the Florida Trench Safety Act, and Title II of the Americans with Disabilities Act. Bidders must provide a bid bond of 5% of the bid, and the successful contractor must provide performance and payment bonds for 100% of the contract price. There is no set-aside status specified for this solicitation.
General Info
St. Petersburg seeks bids to install an emergency backup generator at Fleet Management.
DOCX, High priority: read this first2 pages · bid-bond
HighAI Summary for Bid Bond for City of St. Petersburg Project: This document is a Bid Bond form dated September 2020 for the City of St. Petersburg, Florida. It serves as a guarantee from the Principal and Surety that if the Principal is awarded the contract, they will enter into a written contract and furnish the required performance bond within ten calendar days. The bond amount is five percent of the bid, payable as liquidated damages if the Principal fails to comply. The form includes spaces for project information, signatures of the Principal, Surety, witnesses, and requires a power of attorney for the Surety's attorney-in-fact.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for City of St. Petersburg Construction Agreement Template: A template for a construction agreement between the City of St. Petersburg, Florida, and a Contractor. The document outlines the scope of work, contract price, commencement timelines, and a liquidated damages schedule based on the original contract amount. It includes signature blocks for corporate officers and city officials, as well as a notary acknowledgment section. Last updated March 2019.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of St. Petersburg Fleet Management Emergency Generator Specifications: Technical specifications and table of contents for City Project No. 25143-130, regarding the Fleet Management Emergency Generator. Revised 08/09/23, the document outlines required bidder documents, contract standards, and detailed technical specifications covering general work, excavation, concrete, piping materials, and roadway construction.
PDF
PDF, High priority: read this firstbid-bond-form
HighAI Summary for Fleet Management Emergency Generator - Bidder Security Information: A bidder security and information form for Project No. 25143-130 (Fleet Management Emergency Generator) for the City of St. Petersburg, Florida. It outlines requirements for the bid bond (5%) or certified check, commencement timelines, and the disclosure of principals interested in the bid.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Fleet Management Emergency Generator, Project No. 25143-130: An Invitation for Bid (IFB-26-347) issued by the City of St. Petersburg for the Fleet Management Emergency Generator project. The document outlines the introduction, instructions for submittals via OpenGov, general conditions, and a list of required attachments including contract specifications, bid plans, and various certifications.
PDF
PDF, High priority: read this firstcertification-form
HighAI Summary for Florida Trench Safety Act Certification and Disclosure Statement: A certification and disclosure form for Project No. 25143-130 (Fleet Management Emergency Generator). It requires the bidder to acknowledge compliance with Florida State Statutes §553.60 - 553.64 and OSHA excavation safety standards, including a cost breakdown for trench safety measures.
DOCX
DOCX, High priority: read this first4 pages · performance-and-payment-bond
HighAI Summary for Performance and Payment Bond for City of St. Petersburg Contract: This document is a Performance and Payment Bond for a contract with the City of St. Petersburg, Florida. It binds the Principal and Surety to ensure faithful performance of the contract and payment to all labor and material suppliers. The bond includes conditions for compliance with contract terms, payment obligations, and warranty fulfillment. It also contains provisions for changes to the contract without affecting the bond. The document requires signatures from the Surety's Attorney-in-Fact, the Principal, and witnesses, along with notarized acknowledgments. The bond is dated September 2020 and includes spaces for project description, contract date, and bond amount.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 3 Information and Forms: This document outlines the requirements for compliance with Section 3 of the Housing and Urban Development Act of 1968. It specifies the obligation for prime contractors and subcontractors to provide employment opportunities to low- and very low-income persons. The document details required bid submissions (Business Concern self-certification), post-award documentation (Worker self-certification, Qualitative Efforts Checklist), and labor hour tracking requirements to meet goals of 25% for Section 3 workers and 5% for Targeted Section 3 workers. It also provides the mandatory Section 3 Clause for inclusion in all subcontracts.
XLSX
XLSX, High priority: read this first2 pages · subcontractor-summary
HighAI Summary for Shelter Bid Subcontractor Summary Spreadsheet: This document is a Subcontractor Summary Spreadsheet for the Shelter Bid project by the City of St. Petersburg. It includes instructions for completing the subcontractor worksheet, which reflects the percentage of work that may be subcontracted (80% for this project). The form requires the prime contractor's name, the individual completing the form, and detailed information about each subcontractor, including business address, contact information, trade classification, subcontract amount, and status changes. It also outlines rules for subcontractor changes and restrictions, including conditions under which subcontractors may be replaced and requirements for Small Business Enterprise (SBE) subcontractors. The document is intended to be completed and submitted with the bid.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for St. Petersburg Fleet Management New Generator Design - Bid Plans: 100% design plans and structural specifications for the St. Petersburg Fleet Management New Generator project (Project No. 25143-130). The document includes a drawing index covering site planning, structural plans, and electrical specifications, and has been approved for bid by the Director of Engineering & Capital Improvements.
PDF
PDF, Low priority1 page · other
LowAI Summary for Business Enterprise Good Faith Efforts Explanation Form: This document is an explanation form for Business Enterprise Good Faith Efforts, to be completed if no Business Enterprise participation was used or goals were not met. It outlines criteria for assessing good faith efforts by prime contractors, including outreach events, solicitation documentation, and use of supplier development services. The form requires a detailed explanation of efforts made and supporting documentation, along with affirmation of accuracy by an official signature. It serves to document compliance with participation requirements and warns against false statements under federal or state laws.
PDF
PDF, Low prioritycertification
LowAI Summary for Byrd Anti-Lobbying Amendment Certification: A certification form required for contracts exceeding $100,000, ensuring compliance with 31 U.S.C. 1352 regarding the use of funds to influence government officials (Anti-Lobbying).
PDF
PDF, Low prioritycertification
LowAI Summary for Certification Regarding Debarment, Suspension, Ineligibility And Voluntary Exclusion: A certification form (Attachment H) for subcontractors to verify that they, their principals, and affiliates are not currently debarred, suspended, or ineligible for participation in federal transactions. Includes references to the City of St. Petersburg and FEMA Project Number 4673-024-R.
PDF
PDF, Low priorityaffidavit
LowAI Summary for Foreign Country of Concern Affidavit: A legal affidavit required by Section 287.138, Florida Statutes, where a vendor attests that they are not owned by, controlled by, or organized under the laws of a Foreign Country of Concern to ensure the protection of personal identifying information.
PDF
PDF, Low priority1 page · letter-of-intent
LowAI Summary for Letter of Intent to Perform as Subcontractor/Supplier BEP Form A: This document is a Letter of Intent to Perform as a Subcontractor/Supplier for a Certified Business Enterprise (Form A). It is used to declare the intent of a certified firm to perform work under a prime contract with the City of St. Petersburg. The form captures details such as contract amount, contract name, certifications held by the subcontractor/supplier, business enterprise information, description of work, anticipated time frame, and dollar amount. It requires signatures from both the certified firm and the prime contractor, and includes a section for internal use by the City of St. Petersburg to record acceptance date.
PDF
PDF, Low prioritycertification
LowAI Summary for Lobbying and Equal Opportunity Certification - Fleet Management Emergency Generator: A certification form for the Fleet Management Emergency Generator project (Project No. 25143-130). It requires the Prime Contractor and Subcontractors to certify non-debarment, compliance with Executive Order 11246 regarding equal opportunity, and the use of nonsegregated facilities.
DOCX
DOCX, Low priority4 pages · bond
LowAI Summary for Public Construction Bond - City of St. Petersburg, FL: This document is a Public Construction Bond for a construction agreement between a Principal (contractor) and the City of St. Petersburg, Florida. It outlines the bond number, parties involved, penal sum, and conditions under which the bond is valid, including compliance with the contract terms, payment to claimants, and warranty obligations. The bond complies with Florida Statutes Section 255.05, detailing surety duties and claimant action provisions. It includes signature blocks for the Surety, Principal, City Attorney, and notary acknowledgments for both Principal and Surety representatives. The document is dated September 2020 and is intended to guarantee faithful performance and payment under the construction contract.
The installation of a new emergency backup generator for the City's Fleet Management Complex. Fleet Management has indicated the primary goal is for the new emergency generator to provide full backup power for up to 48 hours in the event of a utility outage to support half of the complex buildings. The scope of work includes but is not limited to a new 300KW generator with all associated electrical connections and electrical work as described in the bid documents. Scope also includes an Alternate 1 for a concrete masonry wall enclosure with access gates and lightening protection with all associated electrical work; and an Alternate No. 2, 200-amp panel replacement with all associated work for the adjacent Radio Shop.